Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Washington was posted on May 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design Consultant - Chambers Creek Dam Removal and Estuary Bank and Channel Protection Project

Closed
2026-RFQ-149State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering various technical and professional services including civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as cathodic protection system design, BIM/3D modeling, and commissioning and startup planning. Additional requirements include utility locating and potholing, geotechnical and geophysical investigations, LIDAR, land surveying, drone services, CPM scheduling, and comprehensive environmental services such as hazardous materials surveys, permitting support, and compliance monitoring. The solicitation specifically targets qualified Disadvantaged Business Enterprises, including MBE, WBE, and OBE firms. Interested bidders must be issued an Invitation to Bid through the Building Connected system and must possess a valid California Contractor license and acceptable insurance. Responsible subcontractors are required to provide bonding for 100 percent of their contract value, with Kiewit agreeing to reimburse the bond premiums. Bidders must also demonstrate the ability to maintain labor harmony, as Kiewit is a signatory to collective bargaining agreements with several trade unions. The bid deadline is September 11, 2026, and inquiries should be directed to Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 17 days
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending the gravity sewer mainline, installing service laterals for properties currently using onsite septic, and decommissioning existing pump stations, particularly in the Romaine Village area. The scope may also include transportation improvements such as ADA curb ramp and curb design and intersection enhancements at Poplar Street and Ponderosa Street. This initiative is funded by the Clean Water State Revolving Fund through the Oregon Department of Environmental Quality, with a total project budget for design and construction of 3,875,000 dollars. The solicitation, identified as number 27-3214, has a response deadline of September 29, 2026. Parametrix is actively pursuing a good faith effort to include firms with federal, tribal, state, local, or independent DBE certifications, and the project is open to various small business set-asides including WOSB, HUBZone, and SDVOSB. The City of Bend will award the contract based on a scoring system evaluating project understanding, team qualifications, and firm experience, with the goal of advertising for construction services in fall or winter 2027. Submissions must adhere to strict formatting guidelines, including a 12-page limit for primary text sections and the inclusion of signed certifications and assurances.
Parametrix

POSTED

about 4 hours ago

DEADLINE

in 16 days
NAICS: 541330
New
SLED
Reconnecting Communities Initiative
Solicitation # 2027-RFQ-CNH-395
The City of New Haven's Reconnecting Communities Initiative, solicitation 2027-RFQ-CNH-395, seeks a multi-disciplinary team to develop a comprehensive Reconnection Plan along I-91. Funded by a 2 million USDOT grant, the project aims to mitigate the long-term impacts of highway construction on surrounding neighborhoods, including East Rock, Cedar Hill, Fair Haven, Long Wharf, and Wooster Square. The objective is to improve mobility, housing, sustainability, and neighborhood cohesion through land reclamation and enhanced transit, pedestrian, and bicycle connectivity. The planning process has a two-year period of performance, with an initial contract term of one year and two optional one-year renewals. The selected consultant will be responsible for delivering urban design and reuse concepts, zoning and regulatory recommendations, anti-displacement strategies, and a phased implementation strategy. All work must adhere to FHWA Planning and Environmental Linkages and NEPA frameworks, as well as federal environmental justice policies. Evaluation is based on a points system, with 45 percent of the score weighted toward qualifications, including experience with CTDOT and AASHTO standards and technical capabilities in ArcGIS and GEOPAK. Proposals must be submitted electronically via the OpenGov portal by October 20, 2026, and must include a valid UEI number. The contract is subject to Connecticut law and includes strict requirements for insurance, non-discrimination, and federal compliance under 2 CFR 200.
City Plan

POSTED

about 23 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Pierce County is seeking a qualified engineering firm to deliver preliminary and final design services for the removal of the Chambers Creek Dam and the restoration of the adjacent estuary, a project critical to salmon recovery in Water Resource Inventory Area 12. The earthen dam, constructed in 1933 to support industrial water withdrawal, has degraded over time with documented structural deficiencies including cracks in the concrete cap, scoured foundation, and compromised sheet pile walls. Its removal is a high-priority action to restore natural hydrologic, geomorphic, and ecological functions to Chambers Creek, reconnecting tidal and estuarine processes, increasing habitat availability by approximately 40%, and enhancing prey availability and habitat complexity for multiple salmonid species including chum, coho, pink salmon, steelhead, cutthroat trout, bull trout, and juvenile Chinook. The project is part of a broader estuary restoration effort that includes the concurrent replacement of the Chambers Creek Bridge, with both initiatives designed to account for evolving channel dynamics and tidal influences during construction. The engineering services contract, solicited under 2026-RFQ-149, will follow a performance-based approach with deliverables guided by Exhibit A and B, and must comply with WSDOT Local Agency Guidelines as it is anticipated to be federally funded. The selection process is structured as a two-phase best value acquisition, with Phase 1 evaluating technical qualifications including past experience in dam removal, environmental restoration, and project communication on a 200-point scale, and Phase 2 comprising an interview that carries 100% weight in the final award decision, effectively prioritizing demonstrated capability and team competence over cost. Offerors must submit their Statement of Qualifications electronically via the County’s procurement portal by June 24, 2026, with the narrative limited to 20 pages excluding cover materials and resumes. The consultant will be required to meet stringent compliance obligations including adherence to federal nondiscrimination laws, prohibition of contingent fees, and submission of key personnel resumes with designated backups. While no formal FAR clauses were identified, contractual procedures are governed by exhibit-based requirements such as Consultant Claim Procedures for claims over $1,000 and mandatory pre-construction meetings. The estimated contract value ranges between $1 million and $1.5 million, covering the initial 24-month performance period with a potential three-year option, and all work must align with EPA and ASTM standards for sampling, data quality, and environmental compliance, ensuring regulatory rigor and restoration effectiveness.

General Info

Pierce County seeks engineering design for federally funded Chambers Creek Dam removal and estuary restoration.

Agency

Washington → Planning and Public WorksView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

WA, USA

Set-Aside

NONE

Documents

(15)

Appendix C - Hydrodynamic Modeling Results for Chambers Creek Dam Removal 2019

PDFreport

Chambers Creek Bridge No. 29202-A Type, Size, and Location Final Report

PDFreport

Chambers Bay Dam Removal Preliminary Basis of Design Report Oct 2023

PDFpreliminary-basis-of-design

WDFW Fish Passage Report - Chambers Bay Dam

PDFreport

Chambers Creek Properties Master Site Plan Cultural Resource Assessment 1996

PDFcultural-resource-assessment

Chambers Bay Dam Removal Preliminary Design Submittal

PDFsow

Chambers Creek Dam Removal and Estuary Restoration Feasibility Study Update Oct 2022

PDFfeasibility-study

RFQ 2026-RFQ-149 Design Consultant Chambers Creek Dam Removal

PDFrfq

Chambers Creek Dam Study Final Report 2013

PDFstudy-report

CHAMBERS CRK RD DRAINAGE SURVEY - Dam Design Documents 1993

PDFother

Local Agency Professional Services Cost Plus Fixed Fee Consultant Agreement

PDFcontract-document

Chambers Bay Dam Removal 30% Design Submittal

PDFsow

2005_Topographic_Map.pdf

PDF

Chambers Bay Estuary Restoration Project Comprehensive Implementation Strategy Plan

PDFcomprehensive-implementation-strategy-plan

Appendix A Sediment Characterization Data Report 2021

PDFreport

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Planning and Public Works
Contacts2 people available
OfficeTacoma, WA, 98402, USA
Organization / Agency
Washington → Planning and Public Works
View Agency Profile
Office AddressTacoma, WA, 98402, USA
Contacts
Susan HoldenerContract Administration Officer
Lauren DaseProcurement and Contract Specialist 2

Interested Companies (51)

Show more
Anchor QEA
Seattle, WA
Niroman
OLympia, WA
Inter-Fluve
Hood River, OR

See All 51 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
In 1933, the Chambers Creek Dam was built to assist in water withdrawal for Glacier Gravel Company and the Everett Pulp & Paper Company. The dam was constructed to create a water impoundment that would allow each of the companies to utilize the surface waters for their respective gravel mining and pulp/paper manufacturing operations. The Chambers Creek Dam is an earthen-filled dam. The dam's spillway is concrete and slopes downward to the west. The sides of the dam are constructed of interlocking corrugated metal sheet pile. The dam has a crest length of 170 feet, a height of 22 feet, and a surface area of 5.0 acres. Fish ladders flank either side of the dam. In 2009, Pierce County conducted an inspection of the dam. The dam was found to have cracks in the concrete cap structure, the bottom was scoured, and sections in the lower sheet pile were missing or had holes. In 2012, a second fish ladder was added. Removing Chambers Bay Dam is a priority action for salmon recovery in Water Resource Inventory Area (WRIA) 12. Removal of the dam and restoration of Chambers Creek will address several threats to salmon recovery: loss of off-channel habitat, disconnection of the floodplain, alteration of natural flow regimes, loss of riparian function, and degraded habitat complexity and connectivity. In addition, the dam impedes fish passage, and its removal will directly benefit species such as Chambers Creek chum salmon, coho salmon, pink salmon, steelhead, cutthroat trout , and bull trout , as well as juvenile rearing populations of Chinook salmon, from all over Puget Sound on a shoreline between the Puyallup and Nisqually River deltas. Removal of the dam and restoration of the estuary will restore tidal and estuarine processes and provide approximately a 40% increase in habitat, more diversity of habitat, and more prey for priority salmon species. This project is an element of a larger effort to restore the Chambers Bay Estuary that involves the replacement of Chambers Creek Bridge. A separate RFQ led by Pierce County Office of the County Engineer has been produced to lead that stage of the project. Both projects will occur simultaneously to account for the impacts to tidal influence, differing hydrogeomorphology, and channel locations, which will evolve during the construction phases of the project. The County is initiating engineering design for D817 Chambers Bay Estuary Restoration. To support this effort, Pierce County is seeking an engineering firm to provide Preliminary and Final Design Engineering services for the project. This is anticipated to be a federally funded project and must adhere to the WSDOT Local Agency Guidelines. In 2023, Pierce County completed a Type, Size and Location (TS&L) study for the bridge replacement project, and in 2026 Pierce County completed a Comprehensive Implementation Strategic Plan (CISP). Both documents can be found on the project webpage here: Chambers Bay Estuary Restoration | Pierce County, WA - Official Website .

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS