This Solicitation opportunity from Washington was posted on May 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Design Consultant - Chambers Creek Dam Removal and Estuary Bank and Channel Protection Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Pierce County is seeking a qualified engineering firm to deliver preliminary and final design services for the removal of the Chambers Creek Dam and the restoration of the adjacent estuary, a project critical to salmon recovery in Water Resource Inventory Area 12. The earthen dam, constructed in 1933 to support industrial water withdrawal, has degraded over time with documented structural deficiencies including cracks in the concrete cap, scoured foundation, and compromised sheet pile walls. Its removal is a high-priority action to restore natural hydrologic, geomorphic, and ecological functions to Chambers Creek, reconnecting tidal and estuarine processes, increasing habitat availability by approximately 40%, and enhancing prey availability and habitat complexity for multiple salmonid species including chum, coho, pink salmon, steelhead, cutthroat trout, bull trout, and juvenile Chinook. The project is part of a broader estuary restoration effort that includes the concurrent replacement of the Chambers Creek Bridge, with both initiatives designed to account for evolving channel dynamics and tidal influences during construction. The engineering services contract, solicited under 2026-RFQ-149, will follow a performance-based approach with deliverables guided by Exhibit A and B, and must comply with WSDOT Local Agency Guidelines as it is anticipated to be federally funded. The selection process is structured as a two-phase best value acquisition, with Phase 1 evaluating technical qualifications including past experience in dam removal, environmental restoration, and project communication on a 200-point scale, and Phase 2 comprising an interview that carries 100% weight in the final award decision, effectively prioritizing demonstrated capability and team competence over cost. Offerors must submit their Statement of Qualifications electronically via the County’s procurement portal by June 24, 2026, with the narrative limited to 20 pages excluding cover materials and resumes. The consultant will be required to meet stringent compliance obligations including adherence to federal nondiscrimination laws, prohibition of contingent fees, and submission of key personnel resumes with designated backups. While no formal FAR clauses were identified, contractual procedures are governed by exhibit-based requirements such as Consultant Claim Procedures for claims over $1,000 and mandatory pre-construction meetings. The estimated contract value ranges between $1 million and $1.5 million, covering the initial 24-month performance period with a potential three-year option, and all work must align with EPA and ASTM standards for sampling, data quality, and environmental compliance, ensuring regulatory rigor and restoration effectiveness.
General Info
Agency
NAICS
Place of Performance
WA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (51)
See All 51 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
