Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on September 21, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design, fabricate, supply and deliver a fully engineered and prefabricated 5-foot wide by 85-foot long weathering tubular steel truss pedestrian bridge, of welded and bolted structural steel, treated timber deck materials, etc.

Awarded
Q9512090038Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The National Park Service is seeking quotes for a firm, fixed-price contract to design, fabricate, and deliver a prefabricated pedestrian bridge for Olympic National Park. The required structure is a 5-foot wide by 85-foot long weathering tubular steel pony truss bridge featuring a treated timber deck. The project must be overseen by a licensed professional engineer and adhere to AISC and AWS standards, with specific requirements for snow loading, wind speed, and seismic loads. Delivery is F.O.B. Destination to the Barnes Point boat launch ramp in Washington. This solicitation is set aside for small businesses under NAICS code 332312. Evaluation will be based on price, the manufacturer's past performance—requiring at least five years of experience and five successful similar projects—and the proposed delivery schedule for design documents and the final structure. Qualified offerors must provide stamped design drawings, connection details, and AISC certification for fabricating major steel bridge structures.

General Info

Contract Value

$38,745

NAICS

332312 - Fabricated Structural Metal Manufacturing

Place of Performance

CO

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
ContactsNo contacts available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
ContactsNo contact information available

Full Description

Show more
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. Request for Quote Q9512090038 is a combined synopsis/solicitation for commercial items. This combined synopsis/solicitation is issued as a RFQ. Submit written quotations only; oral quotations will not be accepted. This combined synopsis/solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-33. It is the contractor's responsibility to be familiar with applicable clauses and provisions. Clauses and provisions can be found at http://www.arnet.gov/far. This solicitation is a small business set-aside; all responsible small businesses concerns may submit a quotation that shall be considered by the agency. The North American Industrial Classification Standard (NAICS) code is 332312, with a Small Business Size Standard of 500 employees. This solicitation will result in award of a firm, fixed-price contract. DESCRIPTION: The National Park Service has a requirement to design, fabricate, supply, and deliver a fully engineered and prefabricated 5-foot wide by 85-foot long weathering tubular steel truss pedestrian bridge superstructure, consisting of welded and bolted structural steel (rolled shapes and tubing) construction, treated timber deck materials, continuous steel channel toe plate, bearing devices, and all appurtenances. The structural design of the bridge superstructure shall be performed by or under the supervision of a licensed professional engineer in accordance with the requirement of the American Institute of Steel Construction (AISC). Structural tubing members and their connections shall be designed according to the AISC "Hollow Structural Section Connections Manual", latest edition. SPECIFICATIONS: (1) The bridge size shall be 5-foot wide by 85-foot long. (2) The bridge shall be designed and fabricated for dead load plus 255 PSF snow loading, live load 85 psf, exposure B per uniform building code, and wind speed of 80 mph calculated with wind acting on entire bridge vertical face as if it were fully enclosed. Bridge shall be designed for seismic loads appropriate for the location. Bearing and anchoring devices shall be provided to allow for a differential in temperature of 120 degrees Fahrenheit. (3) Open "pony" truss design with one diagonal per panel, with a treated timber deck, and with the floor system at (or very near) the bottom of the trusses. The top chord shall be parallel with the bottom chord. For maximum waterway opening, the bottoms of the floor beams (or other structural floor members) shall not be more than 3 inches higher or lower than the bottoms of the chords. Raising the deck and floor system to form an "H" truss system is not acceptable. (4) Three horizontal mid-rails, minimum 1-inch x 1-inch angle, shall be evenly spaced on each side, with both edges welded to every vertical post.(5) All steel shall be weathering structural steel tubing. All bolts, pins, etc., are to be high strength.(6) All welding shall be in accordance with the welding section of the AISC Specifications and the American Welding Society (AWS) "Structural Welding Code".(7) Structural steel field splices shall be bolted; no field welding shall be required. Bolted connections shall be made with ASTM A588, Type 3, high strength bolts.(8) A 5-inch continuous steel channel toe plate shall be mounted by the manufacturer inside each truss 4 inches above the deck according to the manufacturer's drawings.(9) The connection of the bridge end post to the top chord shall be mitered joint with the exposed welds ground smooth.(10) The connection of the floor beam into the side of the tubular bottom chord of the truss shall be reinforced with stiffeners.(11) Wood decking material shall be a minimum 2"x6" (may be wider), treated with Copper Naphthenate to above ground conditions according to the American Wood Preserves Association. Prior to treatment of timbers, manufacturer shall shape/cut timbers to exact length and drill holes as need to receive required bolts, so treatment will penetrate all exposed surfaces.(12) The process of wood treatment shall use Best Management Practices to assure a clean product and minimize the potential for chemicals to enter the aquatic environment. The following guidelines shall be used when treating material:(12.1) Treat using Copper Naphthenate which meets AWPA P8, Section 2. The solvent used shall meet the requirements of AWPA Standard P9, Hydrocarbon solvent, Type A or Type C, depending on the product being treated. (12.2) Solution Filtration - The Copper Napthenate solution in use shall be filtered or otherwise kept clean regularly to remove solids which may otherwise be deposited on the wood during treating.(12.3) Follow good housekeeping practices to minimize sawdust and other surface residues on the wood products prior to treatment.(12.4) Expansion Bath - Use a minimum expansion bath of one hour. The maximum temperature of the expansion bath shall be 220 degrees F or 230 degrees F depending on the specific commodity standard limitations. The expansion bath shall be followed by a vacuum period using a minimum of 22" for a minimum for a minimum of two hours. Following the vacuum period, the wood shall be subjected to steaming for a two-hour time period. The minimum temperature during steaming shall be 200 degrees F and the maximum shall be 240 degrees F depending on the species being treated. After steaming, apply a final vacuum for a minimum of four hours at 22" of vacuum. Prior to shipment, visually inspect the treated wood product and reject any pieces with excessive surface residue. Note, however, that an oil carrier may be detected in a surface wipe of a properly treated and acceptable product. Avoid excessive solids or grease-like deposits which can be scraped off the surface. Also, reject material where liquid preservative "bleeds" from the product.(13) The wood decking material shall be installed by the manufacturer, unless otherwise instructed by the NPS in advance of delivery. DELIVERY: Submit delivery lead time with quote. Delivery of the bridge shall be arranged by the manufacturer and shall be F.O.B. Destination to the Barnes Point boat launch ramp near the Storm King Ranger Station in Olympic National Park. A highway sign directs where to turn off of Highway 101. The Storm King Ranger Station is located approximately 18 miles west of Port Angeles, WA, off of Highway 101. The NPS shall be responsible for unloading the bridge from the truck at the time of arrival. The supplier shall notify the NPS at least 6 days in advance of the expected time of arrival. CLAUSES & PROVISIONS: The provision at 52.212-1, Instructions to Offerors-Commercial, applies to this solicitation. The provision at 52.212-2, Evaluation-Commercial Items, applies to this solicitation. The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers, and this information must be included with your quote in order to be considered eligible for award: (a) Price, which includes the design, fabrication, packing, and delivery of the bridge; (b) Past experience and performance - the bridge manufacturer must have at least five years experience designing and fabricating bridges of this type (open "pony" trusses made of steel tubing, similar span length and a minimum of five successful bridge projects, of similar construction, each of which has been in service at least three years), including a list of projects, bridge sizes and design loads, locations, and owner/contact information; (c) Proposed delivery of the design documents for review following the issuance of the Notice of Award; and (d) Proposed delivery schedule of the structure to the delivery site following date of approval of the design documents (delivery lead time). All evaluation factors other than cost or price, when combined, are approximately equal to cost or price. The government reserves the right to make award without discussions. Offerors must also include completed copy of the provision at 52.212-3, Offeror Representations and Certifications - Commercial Items, with its quote, or be registered in the Online Representations and Certifications Application (ORCA) database at http://orca.bpn.gov. If the Offeror chooses to register online at ORCA in lieu of submitting the provision at 52.212-3, the registration must be completed by the time the quote is submitted in order to be considered eligible for award. The clauses at 52.212-4, Contract Terms and Conditions-Commercial Items, applies to this solicitation. The clause at 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Items, applies to this acquisition, and includes the following clauses: 52.219-28 Post-Award Small Business Program Representation; 52.222-03 Convict Labor; 52.222-19 Child Labor-Cooperation with Authorities and Remedies; 52.222-21 Prohibition of Segregated Facilities; 52.222-29 Equal Opportunity; 52.222-35 Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans; 52.222-37 Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans; 52.225-01 Buy American Act - Supplies; 52.225-03 Buy American Act - Free Trade Agreements - Israeli Trade Act; 52.225-13 Restricitons on Certain Foreign Purchases; and 52.232-33 Payment by Electronic Funds Transfer - Central Contractor Registration. The clause at 52.247-34, F.o.b. Destination, applies to this acquisition. All offerors must be registered in the Central Contractor Registration (CCR) database at http://www.ccr.gov. Any questions regarding this solicitation MUST be submitted in writing (fax or email) to the point of contact below. SUBMITTAL: Quotations must be received no later than Thursday, August 27, 2009, 4:30 p.m., Pacific Daylight Time. Quotation package must include: (a) design drawings and specifications, three copies stamped and sealed by a Registered Professional Engineer; (b) detailed drawings of the connection between the decking and the bridge structure; and (c) documentation that certifies the bridge manufacturer is certified by the AISC to fabricate Major Steel Bridge Structures. Submit quotations to the attention of the Contracting Officer, Olympic National Park, 600 East Park Avenue, Port Angeles Washington 98362 or send by facsimile to +1 (555) 000-0000. The point of contact for this solicitation is: Phaedra Fuller, Contract Specialist, Olympic National Park, telephone: +1 (555) 000-0000, email: contact@example.gov. The government reserves the right to cancel this solicitation.

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237110
New
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming. The project scope involves extensive structural, utility, and preservation work on one lodge, eight cabins, one garage, two outbuildings, and a water well structure to convert them into employee housing. Key technical requirements include the installation of a new sanitary sewer collection system, lift station, and water distribution for domestic and fire service, as well as the expansion of the parking lot to include ADA spaces. The project is estimated to have a construction magnitude exceeding 10 million dollars, with a base performance period of 303 calendar days, potentially extending to 669 days depending on the selected CLINs. The government will award the contract using the Best Value Continuum Tradeoff Process, evaluating proposals based on technical approach, project experience, schedule, and past performance, with non-price factors being equally important to price. Contractors must adhere to strict environmental and safety regulations, including potential seasonal closures from February 1 to August 15 for bald eagle nesting and protections for roosting bats. Additionally, the project requires the management of hazardous materials, as surveys have identified potential asbestos and lead-based paint across the facilities. Proposals must be submitted electronically to the Contracting Officer, Tony Jasper, by the specified deadline, and the successful bidder will be required to provide bid, performance, and payment bonds.
Water and Sewer Line and Related Structures Construction

POSTED

about 21 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, identified as TIMU-335507, aims to repair and extend a seawall damaged by Hurricane Ian to protect critical cultural and ecological resources. The scope of work is divided into three primary CLINs: the installation of a new weatherable rigid vinyl sheet pile wall with tie rods in front of the existing wall, the extension of the wall eastward using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, sea grass restoration, and the installation of limestone riprap. The estimated construction magnitude is between 1 million and 5 million dollars, with a mandatory performance period of 259 calendar days. Award will be determined using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to safeguard aquatic species, wetlands, and endangered wildlife, including manatees and sea turtles, in compliance with the Marine Mammal Protection Act and the Endangered Species Act. Additional requirements include adherence to the Davis-Bacon Act for prevailing wages, ADA compliance for public dock walkways, and the use of biodegradable or recyclable packaging. Proposals must be submitted electronically in two volumes by November 13, 2026, and include a bid bond and detailed past performance data.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 15 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

2 days ago

DEADLINE

in 19 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

14 days ago

DEADLINE

in 4 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

17 days ago

DEADLINE

in 8 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

17 days ago

DEADLINE

in about 11 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS