This Solicitation opportunity from Maryland was posted on May 23, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Cecil County is seeking proposals for a comprehensive project to utilize landfill gas (LFG) from the Cecil County Central Landfill through proven and feasible technologies. The project aims to explore various beneficial uses of LFG, including electricity generation, renewable natural gas production, direct-use applications, and other innovative options as demonstrated by respondents. The county does not specify a preferred method, leaving the choice of beneficial use to the discretion of the respondents, who will be responsible for designing, permitting, constructing, operating, and maintaining the LFG Beneficial Use Facility. The solicitation, identified as BPM044511, was posted on May 23, 2024, with a response deadline of July 24, 2024. The project budget ranges from five million to twenty million dollars, and the contract falls under NAICS code 541620, indicating a focus on environmental consulting and related services. Interested parties can contact Connie Kamit via email for further information and access the project details through the Maryland state procurement portal.
HighAI Summary for LandGEM Model v3.03 for Cecil County Central Landfill Gas Emissions: This document presents the LandGEM (Landfill Gas Emissions Model) Version 3.03 developed by the U.S. Environmental Protection Agency. It provides a detailed overview of the model design, including worksheets for user inputs, pollutant selection, methane calculations, and emission results. The model estimates landfill gas emissions based on first-order decomposition rate equations, using landfill-specific data such as open year, waste design capacity, and annual waste acceptance rates. The document includes important notes on methane content, pollutant concentration corrections, and operational considerations. It serves as a technical guide for estimating landfill gas emissions for Cecil County Central Landfill, supporting compliance with Clean Air Act regulations.
PDF
PDF, High priority: read this firstpermit-renewal
HighAI Summary for Renewal Part 70/Title V Operating Permit 24-015-0163 for Cecil County Central Sanitary Landfill: This document is the renewal Part 70/Title V Operating Permit No. 24-015-0163 for the Cecil County Central Sanitary Landfill located in Elkton, Maryland. The permit renewal includes updated conditions under Section II, General Conditions, Number 5, regarding permit renewal application submission timelines. The permit is valid until June 30, 2025. The document also contains a detailed fact sheet describing the landfill's background, regulatory status, emissions data, and compliance with EPA regulations including NSPS and Emission Guidelines under 40 CFR Part 60 Subparts WWW and Cf. It highlights the landfill's design capacity, gas collection system, and recent regulatory updates affecting emission thresholds and compliance requirements. Contact information for the permit manager and instructions for contested case hearings are provided.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 24-013-53021 Landfill Gas Beneficial Use Project - Cecil County Central Landfill: This Request for Proposal (RFP 24-013-53021), released on May 23, 2024, solicits proposals for the design, permitting, construction, operation, and maintenance of a landfill gas beneficial use facility at the Cecil County Central Landfill in Maryland. The project aims to utilize landfill gas for beneficial uses such as electricity generation or renewable natural gas. The RFP outlines submission requirements, evaluation criteria, and includes multiple technical attachments related to landfill gas systems. Proposals must be submitted electronically by July 24, 2024, with a question deadline of June 28, 2024. The document details the scope of work, project objectives, and contact information for project and procurement managers.
PDF
PDF, Low prioritylaboratory-analysis-report
LowAI Summary for LFG Testing Data BTU Analysis Report 230704: This document is a laboratory analysis report from Atmospheric Analysis & Consulting, Inc. for BAI Group LLC, project number 230704, dated May 5, 2023. It details the analysis of landfill gas (LFG) samples collected on April 12, 2023, and analyzed by ASTM methods D-3588 and D-5504 for BTU content, fixed gases, hydrocarbons, and total reduced sulfur compounds. The report includes sample identification, test results normalized to dry basis, and fuel gas specifications such as atomic breakdown and heating values. The report certifies technical accuracy and compliance with contract terms and consists of 9 pages.
PDF
PDF, Low prioritylaboratory-analysis-report
LowAI Summary for LFG Testing Data TO-15 Laboratory Analysis Report: This document is a laboratory analysis report from Atmospheric Analysis & Consulting, Inc. for BAI Group, LLC, project number 230704, dated April 26, 2023. It details the analysis of two 6.0-Liter Silonite Canisters for Volatile Organic Compounds and Siloxanes using EPA Method TO-15/TO-15M. The report includes sample identification, receipt and analysis dates, and detailed results of various compounds measured in parts per billion (PPB) in air samples. The laboratory is accredited under ISO/IEC 17025:2017 by the ANSI National Accreditation Board. The report certifies the technical accuracy and completeness of the data and includes multiple pages of compound concentration results.
PDF
PDF, Low priorityother
LowAI Summary for Monthly LFG Flows to Flare and Carbon Offset Calculations 2012-2023: This document from Cecil County Department of Public Works Central Landfill provides monthly data on landfill gas (LFG) flows to flare and carbon offset calculations from January 1, 2012 through December 31, 2023. It includes detailed tables with metrics such as average monthly LFG flow, flare operating periods, methane concentration, methane combusted, and carbon offsets in CO2e. The data is presented in a tabular format for each month over the 12-year period, supporting environmental monitoring and reporting efforts.
PDF
PDF, Low priorityother
LowAI Summary for Phase 4 LFG Asbuilt Plans: The document titled 'Phase 4 LFG Asbuilt Plans' appears to be a set of as-built plans related to a project phase 4 involving landfill gas (LFG). The content provided is empty or unreadable, with no visible text or details to analyze. Therefore, no specific information about the purpose, version, or key content can be determined from the provided data.
PDF
PDF, Low priorityasbuilt-plan
LowAI Summary for Phase 5 LFGCCS Expansion Asbuilt Plan Final: This document is the final asbuilt plan for Phase 5 of the LFGCCS Expansion project. It includes detailed tie-in profiles with alignment numbers and scales for vertical and horizontal measurements. The plan provides visual and technical information on various tie-in points such as GW-36, GW-17, GW-20, GW-6 to GW-9, GW-13, TIE-IN to GW-12, GW-15, and an additional profile alignment 8. The scales used are 1"=50' horizontally and 1"=25' vertically, indicating precise engineering drawings for construction or verification purposes.
PDF
PDF, Low priorityas-built
LowAI Summary for Phase I As-Builts with Flare Station and Blower Building: This document is an as-built survey plan of the landfill gas collection and control system development site, covering portions of Cell 1, Cell 4, Cell 5 Phase 1, and Cell 5 Phase 2. The survey was conducted by Warnor & Wright Consulting Engineers, Inc. in January 2007 using GPS-RTK method with a horizontal and vertical accuracy of 2 feet. The plan includes existing contours, pipelines, electrical lines, and other site features, with certification applying only to bold lines and text. The document does not certify the accuracy of prestated contours and other precasting features.
PDF
PDF, Low priorityas-built-plans
LowAI Summary for Phase III LFGCCS As-Built Plans: This document contains as-built plans for the Phase III Landfill Gas Collection and Control System (LFGCCS) at Cecil County Central Landfill. It includes profile sheets with scale details for various components such as 18x4 saddle, 6 inch flange, and 6x4 tee. The plans are prepared by SCS Field Services for the Cecil County Department of Public Works. The document appears to be technical drawings and profiles related to landfill gas collection infrastructure.
PDF
PDF, Low priorityasbuilt-drawing
LowAI Summary for Phase II LFG Collection Control System Asbuilt: This document is an as-built drawing for the Phase II Landfill Gas (LFG) Collection Control System. It includes legends and notes related to landfill gas lines, gas wells, and topography data. The topography and control points are based on surveys performed by Burton Associates Inc. and Geomatic Corp, dated 2008 and 2009. Elevations shown are to the top of the pipe as of September 24, 2009.
PDF
PDF, Low prioritypermit
LowAI Summary for Refuse Disposal Permit 2019-WMF-0629 Cecil County Central Landfill: This document is the Refuse Disposal Permit No. 2019-WMF-0629 issued by the Maryland Department of the Environment to Cecil County for the construction and operation of the Cecil County Central Landfill located at 758 East Old Philadelphia Road, Elkton, Maryland. The permit was issued on June 7, 2019, and expires on June 6, 2024. It renews and supersedes the previous permit from 2008. The permit includes referenced materials such as bid documents, engineering drawings, reports, and operating plans related to the landfill's construction and operation. It outlines specific conditions applicable to the facility, including general, natural wood waste, composting, and standard conditions. The permit is subject to terms and conditions detailed in multiple parts and is issued pursuant to Title 9 of the Environment Article, Annotated Code of Maryland.
Cecil County is interested in exploring feasible and viable options using proven technologies for the beneficial use of LFG from Cecil County Central Landfill. Such beneficial use options for the available LFG may include electricity generation, renewable natural gas generation, direct-use, and other beneficial use applications as demonstrated by the Respondents. The County is not specifying any specific LFG beneficial use. Respondents will have the responsibility and requirements to design, permit, construct, operate, and maintain the LFG Beneficial Use Facility.
More opportunities from Maryland → Cecil County Government - Administration