Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on March 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design Services for NCRWTP, SCRWTP and Carica Pump Station Generator Replacement

Closed
26-8636State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 CPRG NCD SOQ
Solicitation # 2026-SOQ-004
The City of Rogers is soliciting Statements of Qualifications (SOQ) under solicitation number 2026-SOQ-004 for Natural Channel Design services to restore approximately 4,200 linear feet of stream in an urban setting. The scope of work includes engineering, plan design, hydrologic and hydraulic modeling, and the procurement of all necessary local, state, and federal regulatory permits, including potential Letter of Map Revision submissions to FEMA. This project is funded by the Climate Pollution Reduction Grant (CPRG) subaward CPRG-NWA-001 and EPA award 02F75801, requiring compliance with EPA nondiscrimination regulations, Title VI of the Civil Rights Act of 1964, and 40 CFR Parts 5 and 7. Key milestones include the completion and approval of construction plans and permit applications by May 1, 2027, with final construction completion targeted for December 31, 2027. Selection is based on a ranking of qualifications rather than price, with the highest-ranked firm invited to negotiate a contract. Evaluation criteria focus on professional staff expertise, past performance, understanding of the scope, and the quality of the work plan. Interested firms must submit a PDF via OpenGov or hard copy to Colt Craig by November 10, 2026. Submissions are limited to 25 pages and must include Standard Form 330 Part II, an Equal Employment Opportunity policy, the Arkansas DFA Illegal Immigrant Contractor Disclosure Form, and EPA certifications regarding debarment and lobbying for contracts exceeding 100,000 dollars. Additionally, firms must maintain active registration in SAM.gov and demonstrate a commitment to DBE goals through six good faith efforts in subcontracting per 40 CFR 33.301.
Community Development

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 541330
New
International
Pump Optimisation and Aeration Efficiency Analysis
Solicitation # FA2253
Thames Water Utilities Limited is establishing a single-lot, sole-supplier framework agreement under solicitation FA2253 for pump optimisation and aeration efficiency services. The contract focuses on the monitoring, testing, and analysis of pumping and aeration systems across approximately 60 operational sites, encompassing roughly 200 tests during the AMP period. The primary objective is to reduce whole-life costs and improve operational performance through a structured delivery model that includes site identification, efficiency studies, and performance monitoring. The agreement will feature fixed pricing structures based on an agreed rate card and will be managed through key performance indicators to ensure strategic partnership and continuous improvement. The contract is scheduled for an initial three-year term starting May 10, 2027, with potential extensions up to a maximum of eight years, ending May 9, 2035. Eligible suppliers must demonstrate a proven track record of delivering measurable savings and innovation and must have the capacity to operate within London, the Thames Valley, and the Home Counties. Award selection is based on a 50% technical and 50% commercial weighting. The procurement process is a multi-stage procedure requiring a Pre-Selection Questionnaire via SAP Ariba by October 19, 2026, followed by an Invitation to Negotiate stage. Successful providers must also meet stringent insurance requirements, including 15 million pounds for public and products liability and 10 million pounds for professional indemnity.
Thames Water Utilities Limited

POSTED

about 3 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

This contract involves design services for the replacement of emergency generators at three critical water facilities within Collier County, Florida: the North County Regional Water Treatment Plant (NCRWTP), South County Regional Water Treatment Plant (SCRWTP), and the Carica Pump Station. The NCRWTP, commissioned in 1993 and expanded in 1999, uses advanced membrane nano-filtration and low-pressure reverse osmosis technologies with a combined capacity of 20 million gallons per day. It currently operates four 1750 KW Caterpillar emergency generators with a sophisticated control and fuel system designed for storm resiliency and compliance with Tier 2 NESHAP environmental standards. The SCRWTP employs lime softening and reverse osmosis processes, with permitted capacities of 12 and 20 million gallons per day respectively, supported by six generators configured for operational flexibility and fuel storage to ensure continuous service during power disruptions. The Carica Pump Station, a vital site serving the northern water district, is equipped with two 800 KW Caterpillar generators and significant fuel storage capacity to maintain pump operations during outages. Comprehensive storm preparedness upgrades, including NESHAP Tier 2 compliance, have been completed at all three sites. The project procurement is managed by the Public Utilities Engineering & Project Management division of Collier County, with a solicitation process that includes strict proposal submission instructions, evaluation criteria, and contractual terms designed to ensure timely, compliant, and high-quality professional design services for the generator replacements.

General Info

Design services for emergency generator replacements at three Collier County water facilities.

Documents

11

26-8636 Insurance Requirements Version 2

PDF, High priority: read this first2 pages · insurance-requirements
High

26-8636 Vendor Checklist Rev. 1 2025

PDF, High priority: read this first1 page · vendor-checklist
High

Collier County Purchase Order Terms and Conditions Rev.3

PDF, High priority: read this first7 pages · contract-document
High

Form 3 Immigration Certification - Collier County Procurement

PDF, High priority: read this first1 page · immigration-certification
High

PSA CCNA Single Project Agreement 2025 ver.2

PDF, High priority: read this first31 pages · contract-document
High

Request for Professional Services Instructions Version 2

PDF, High priority: read this first20 pages · rps-instructions
High

RPS 26-8636 Design Services for Generator Replacement

PDF, High priority: read this first8 pages · rps
High

Vendor Declaration Statement Form 1 Collier County

PDF, High priority: read this first1 page · vendor-declaration-statement
High

Authorization to Advertise for Solicitation 26-8636

PDF, Low priority1 page · authorization-to-advertise
Low

Form 2 Conflict of Interest Certification - Collier County

PDF, Low priority1 page · conflict-of-interest-certification
Low

Form 4 Reference Questionnaire for Proposal Submittal

PDF, Low priority1 page · reference-questionnaire
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Utilities Engineering & Project Management
Contacts1 person available
OfficeEast Naples, FL, 34112, USA
Office AddressEast Naples, FL, 34112, USA
Contacts
Dania GuerreroProcurement Strategist III

Interested Companies (5)

Landberg
Douglas N. HigginsAnn Arbor, MI
CumminsColumbus, IN

See All 5 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The Collier County Water-Sewer District constructed the NCRWTP in 1993 with a production capacity of 12 million gallons per day (hereinafter, "MGD") utilizing membrane nano-filtration technology. In 1999, the NCRWTP was expanded to include eight (8) MGD of production capacity utilizing low pressure reverse osmosis technology. Initially, there were two (2) 1750 KW Caterpillar emergency generators supplying emergency power during FPL power outages and storm avoidance strategies. In 1999, two (2) additional Caterpillar 1750 KW generators were added with the reverse osmosis project expansion. Currently, the existing indoor emergency generator system consists of four (4) 1750 KW Caterpillar generators, a Cummins control system utilizing Cummins switchgear, four (4) 300-gallon diesel fuel day tanks and closed transition capability. There are two (2) 20,000-gallon diesel fuel tanks located exterior to the emergency generator building. Radiators for the generators are located on the roof of the generator building. Current generator/switchgear configuration enables the plant to be fully operated by two (2) generators. As storm avoidance strategies are practiced at this facility, Tier 2 National Emission Standards for Hazardous Air Pollutants (NESHAP) compliance upgrades have recently been completed. The SCRWTP consists of two (2) treatment processes, lime softening and reverse osmosis. The Lime Plant softening improvements were completed in 1987, and the reverse osmosis improvements were completed in 2007. The Lime Plant softening process has a total permitted capacity of twelve (12) MGD of potable water. The reverse osmosis process has a total permitted capacity of twenty (20) MGD of potable water. The SCRWTP emergency auxiliary power system consists of six (6) generators designed to provide operational flexibility. The facility can be powered through a combination of generators, ensuring at least two (2) remain on standby. At the Lime Plant, the generator and switchgear configuration allows full operation using either two (2) 750 KW Cummins generators connected to a shared 10,000-gallon diesel bulk tank or a single (1) 1,500 KW Cummins generator with a 6,000-gallon diesel bulk tank. At the Reverse Osmosis Plant, operations are supported by two (2) 2,000 KW Caterpillar generators, with an additional (1) 2,000 KW Caterpillar generator on standby. Fuel storage consists of two (2) 12,000-gallon diesel bulk tanks. The Carica Repump Station located at 7200 Goodlette Frank Road is the main potable water pump station for the northern portion of the Collier County water district. The station has four (4) high service pumps on site and two (2) ground (2) 5-million-gallon storage tanks. The Carica emergency auxiliary power system consists of two (2) generators designed to provide operational flexibility. See chart below on specifics on the existing generators. LOCATION MAKE MODEL KW SWITCH OVER Standy By Plan Hours Operated Under Load Equipment Operated Satisfy 1/2 Day Demand CARICA #1 CAT. SR-4 800 Automatic Yes 2 hours per week HSP yes CARICA #2 CAT. SR-4 800 Automatic Yes 2 hours per week HSP yes The site has a bulk fuel storage tank of 12,000 gallons. As part of storm preparedness measures, Tier 2 NESHAP compliance upgrades have been completed at all three (3) sites.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS