This Solicitation opportunity from Florida was posted on October 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
DeSoto County Storage Building Construction Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
DeSoto County is seeking a qualified Design-Build team to design, engineer, and construct a pre-engineered metal storage building located at 2250 NE Roan Street, Arcadia, FL. The project involves delivering a fully functional storage facility that complies with the 2023 Florida Building Code, including obtaining necessary permits at county expense. The building will measure approximately 40 by 50 feet, with an eave height suitable for 14-foot roll-up doors at each end, and will feature a metal truss roof system designed to withstand local wind loads. The scope includes designing the foundation, constructing the structure with specified exterior and interior components, and developing a 60-foot asphalt driveway with a connecting walkway, along with installing a solar-powered exterior light. All materials and submittals must be approved by DeSoto County prior to procurement, and the contractor is responsible for property protection, securing work areas, and disposing of waste in compliance with regulations. The project schedule mandates completion of the design phase within two months of notice to proceed, followed by a six-month construction period, with the building considered substantially complete when ready for use. The contract emphasizes warranties, including a minimum 20-year roof warranty, and requires detailed documentation upon project completion. Additional requirements include assigning an English-speaking supervisor, enforcing no tobacco use on site, and ensuring safety and proper waste disposal throughout the project.
General Info
Agency
Place of Performance
FL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- City of Santa Cruz Lifeguard Headquarters RepairsOpen now, due in 17 days
- Architectural Design ServicesOpen now, due in 59 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
1.1 The DB team shall provide a fully functioning pre-engineered metal storage building, including all engineering, materials, and construction services. 1.2 All work must comply with the 2023 Florida Building Code (8th Edition) and other applicable jurisdictional codes. 1.3 The DB team is responsible for obtaining all necessary permits, including the DeSoto County Building Permit. Permit fees will be paid by DeSoto County. 1.4 The DB team shall coordinate with DeSoto County for reviews and approvals at all stages of the project.
2. DESIGN AND ENGINEERING
2.1 The building shall be 40 feet in length, 50 feet in width, with an eave height to accommodate 14-foot roll-up door clearance on each end. 2.2 The structure shall include a pre-engineered metal truss roof system and meet wind load requirements per the Florida Building Code. 2.3 The DB team shall design the foundation, including engineered footings and soil requirements. 2.4 The design phase shall be completed within 2 months of the Notice to Proceed.
3. CONSTRUCTION REQUIREMENTS
3.1 STRUCTURE - EXTERNAL COMPONENTS • Roof: Install 26-gauge Galvalume Plus panels with appropriate flashing and water protection. No gutters or downspouts are required. • Walls: Use factory-finished ribbed metal panels over structural steel framing. • Doors: o One solid-core fiberglass pedestrian door with security hinges and a fixed metal awning (minimum 3-foot projection). o Two metal rolling coil overhead garage doors (14 feet wide, 10 feet 4 inches high). • Locks and Hardware: Use Primus/Schlage locks or approved equal, conforming to the County's master keyway system. 3.2 STRUCTURE - INTERIOR REQUIREMENTS • Floor: Construct a 6-inch-thick concrete slab-on-grade designed for vehicular loading with a trowel finish. • Interior Walls: No interior walls are required. 3.3 DRIVEWAY AND WALKWAY • Construct a 60-foot-long, 25-foot-wide asphalt driveway with 25-foot radii. • Pavement layers: o 2” type S-1 asphalt with prime/tack coat. o 6” shell/limerock base compacted to 98% density. o 8” stabilized subgrade compacted to 98% density. • Provide a walkway connecting the pedestrian door to the driveway. 3.4 ELECTRICAL • Install a single solar-powered exterior light fixture at the pedestrian door. 4. MATERIALS AND SUBMITTALS
4.1 All materials and products must be approved by DeSoto County prior to ordering. Submit shop drawings and product cut sheets for review. 4.2 Provide color charts for all exterior components for County selection. 4.3 Equivalent products must meet or exceed the specifications of the listed products and require County approval.
5. PROTECTION OF PROPERTY
5.1 The DB team shall repair or replace any property damaged during construction at their expense. 5.2 Secure all work areas to ensure safety.
6. WARRANTIES AND DOCUMENTATION
6.1 Provide standard manufacturer warranties for all products and a minimum 20-year warranty for the roof system. 6.2 At project completion, submit two(2) binders or a PDF copy of all Operations and Maintenance Manuals and warranty information.
7. PROJECT SCHEDULE 7.1 The project schedule shall include the following milestones: • Design Phase: 2 months from the Notice to Proceed. • Construction Phase: 6 months from design completion. 7.2 Substantial Completion is defined as the stage when the building is ready for its intended use. 8. ADDITIONAL REQUIREMENTS 8.1 The DB team shall assign an on-duty supervisor who speaks and reads English. 8.2 Tobacco use is prohibited on County property except in designated areas. 8.3 The DB team is responsible for daily disposal of waste materials off-site in compliance with local, state, and federal regulations.
END OF SCOPE OF WORK This scope of work provides a comprehensive outline for bidding on the DeSoto County Storage Building project. All bidders must adhere to the requirements and specifications detailed above.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
