Detention Center Parallelling Switchgear Update

Active
600600DCSwitchgearState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The County of Cumberland in North Carolina is soliciting bids for the Detention Center Paralleling Switchgear Update in Fayetteville. The project requires an authorized Caterpillar dealer to provide all labor, equipment, and materials to upgrade the paralleling switchgear, specifically upgrading two 3412 generator control panels to EMCP 4.2 control panels, including new enclosures, engine wiring, sensors, and voltage regulators. The contract will be awarded based on bids received at the letting in the best interests of the County, with a requirement that all contractors be licensed in their respective fields and comply with G.S. Section 143-131. The work must be completed within 180 calendar days from the issuance of the Notice to Proceed. The contract incorporates the EJCDC C-700 (2013 Edition) Standard General Conditions of the Construction Contract. Key administrative requirements include the submission of monthly applications for payment to the Engineer and the provision of performance and payment bonds equal to the contract price. While a bid bond is not required, the contractor must provide a Certificate of Liability Insurance naming the County of Cumberland as the certificate holder before starting work. Inspection and testing will be conducted at the site by the Owner, Engineer, or approved independent laboratories to ensure compliance with contract documents and state laws.

General Info

Cumberland County seeks bids for upgrading Detention Center generator paralleling switchgear controls.

Documents

1

Cumberland County Detention Center Parallelling Switchgear Upgrade IFB

PDF, High priority: read this first82 pages · ifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNorth Carolina → County of Cumberland
Contacts1 person available
OfficeNC, USA
Office AddressNC, USA
Contacts
CHRISTINE DUCHENEAUX

Full Description

Show more
The work to be performed under this project consists of providing all labor, equipment and materials necessary for upgrading the paralleling switchgear at the Detention Center. All work is to be performed by an authorized Caterpillar dealer to ensure proper functionality of existing equipment.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
Federal
Fire Alarm and Mass Notification System Upgrades for DDJC, Tracy, CA
Solicitation # W9123826RA002
Solicitation W9123826RA002 is a firm-fixed-price construction procurement issued by the Department of Defense, W075 Endist Sacramento, for fire alarm and mass notification system upgrades at the Defense Distribution Depot San Joaquin in Tracy, California. The contractor is required to provide all labor, materials, equipment, and supervision to design, supply, and integrate existing Gamewell fire alarm controls, Federal Signal mass notification/voice evacuation, and King Fisher radio transceivers into a single panel for approximately 49 buildings and warehouses. Additionally, the scope includes replacing the central receiving system in Building 235 and installing a backup receiving system in Building 100. The project is divided into three primary contract line items covering design, cybersecurity, and construction, with a performance period running from April 15, 2027, to April 3, 2030. The government will award the contract based on the most advantageous balance between technical merit and cost, evaluating factors such as past experience, technical capabilities, design concepts, and small business participation. Key requirements include CMMC Level 1 certification, adherence to the Buy American Act, and compliance with ADA and ABA accessibility guidelines. The contractor must utilize specific quality control procedures, including the three-phase inspection process and the DrChecks review management system. Final payment is subject to a 0.05 percent withholding until the government accepts all as-built drawings and CADD files. Proposals must be submitted electronically via the PIEE website by October 13, 2026.
W075 Endist Sacramento

POSTED

about 14 hours ago

DEADLINE

in 6 days
View Details
NAICS: 238210
New
Federal
Micro Gin Motor Control Center Upgrade
Solicitation # 1232SA27Q0004
The USDA Agriculture Research Service is issuing a sources sought notice for the Micro Gin Motor Control Center Upgrade at the Cotton Ginning Research Unit in Stoneville, Mississippi. The project involves the demolition of existing hardwired devices, cable trays, and wiring, followed by the supply and installation of a new Motor Control Center, Programmable Logic Controllers, and a Human-Machine Interface control console. Key electrical requirements include the installation of a new 600-amp service panel in Building 26. All hardware must comply with NEMA, ANSI, and UL 845 standards, featuring UL labeling, NEMA type 1A enclosures with gasketed doors, and a 600V Cat 5 tested cabling system. Safety specifications require mechanically interlocked primary disconnects with padlocking accommodations for up to three locks. The overall project must be completed by April 1, 2027, with the PLC and HMI delivered within 120 days of contract acceptance. This acquisition falls under NAICS code 238210 with a size standard of 19.0 million dollars. Interested respondents must submit a capabilities synopsis of no more than five pages, including their UEL number, SAM validated business size, and relevant past performance with federal or commercial entities. Responses must be submitted in Word or PDF format to Frank Palmer by October 14, 2026. Future award evaluations are expected to follow the Tradeoff Process in accordance with FAR Part 12.
USDA Ars Afm Apd

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details

More opportunities from North Carolina → County of Cumberland

Same awarding agency

NAICS: 238220
SLED
IFB #27-15-IS ROXIE CLINIC MINI SPLIT INSTALLS
Solicitation # 27-15-IS
Cumberland County, North Carolina, issued Invitation for Bid 27-15-IS on September 22, 2026, for the demolition and installation of HVAC systems at the Roxie Clinic located at 1724 Roxie Ave., Fayetteville, NC. The project requires the removal of 13 one-ton floor-mounted PTAC units and the installation of 13 new one-ton wall-mounted mini-split systems, specifically 12k BTU Mitsubishi units or a comparable alternative. The scope includes providing all labor, equipment, and materials, hanging outdoor equipment on brackets above windows, performing system function checks, and installing thermostats within oval plastic safety guards. All equipment must be submitted for county approval prior to purchase, and the contractor is responsible for obtaining all necessary permits and mechanical or electrical inspections. Bids must be submitted via email or mail by 2:00 PM on October 16, 2026, and must include a signed bid form with a pricing breakdown for materials and labor, as well as the contractor's license number. A site visit is scheduled for October 6, 2026. The selected contractor must comply with North Carolina statutory licensing provisions and maintain adequate insurance coverage. While performance and payment bonds are not required, the project must be completed within 30 calendar days of the Notice to Proceed and turned over to the county no later than June 30, 2027. Award will be based on the bids received in the best interest of the county.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

16 days ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS