Determination of Exemption for the Monte Vista Apartments Project from the 2019 Energy Code solar photovoltaic system requirements.
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The California Energy Commission has granted a regulatory exemption from the mandatory solar photovoltaic system requirements of the 2019 Building Energy Efficiency Standards for the Monte Vista Apartments Project in Turlock, California. This exemption, authorized under Title 24, Part 1, Section 10-109(k), was determined after evaluating evidence that local utility regulations from the Turlock Irrigation District, municipal building safety requirements enforced by the City of Turlock, and localized solar installation costs submitted by contractors collectively undermine the cost-effectiveness assumptions upon which the state’s solar mandate was based. The exemption applies specifically to newly constructed low-rise multifamily buildings within this project and removes the obligation to install solar PV systems as otherwise required by Section 150.1(c)14 of the Energy Code. The determination was formally adopted on December 8, 2025, and issued on December 9, 2025, following a written application submitted by Pacific West Communities, Inc. The project’s performance location is identified as Turlock, with the California Energy Commission serving as the approving authority and the City of Turlock responsible for local code enforcement. No federal contract clauses, pricing data, or procurement mechanisms are involved, as this is a state regulatory decision rather than a competitive solicitation or federally funded acquisition. The primary point of contact for this determination is Gypsy Achong, Building Standards Branch Manager at the California Energy Commission.
General Info
Agency
NAICS
Place of Performance
Turlock, CA, 95382Set-Aside