Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Determination of Exemption for the Monte Vista Apartments Project from the 2019 Energy Code solar photovoltaic system requirements.

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Energy Commission has issued a determination exempting the Monte Vista Apartments Project from the solar photovoltaic system requirements mandated by Section 150.1(c)14 of the 2019 Energy Code. This exemption applies to the newly constructed 348-unit low-rise multifamily buildings located within the City of Turlock and the Turlock Irrigation District service area. The decision was formally adopted during a business meeting on December 8, 2025, following an application by Pacific West Communities, Inc. The exemption is based on the finding that the standard cost-effectiveness conclusions of the 2019 Energy Code do not hold for this specific project. This determination was driven by the unique public agency rules of the Turlock Irrigation District, electrical requirements established by the City of Turlock Building and Safety Division and Fire Inspector, and the estimated installation costs provided in contractor bids. Additionally, the project is granted a common sense exemption under CEQA, as it is determined that the project will not cause any direct or indirect physical changes to the environment.

General Info

California Energy Commission exempts Monte Vista Apartments from solar photovoltaic system requirements.

Agency

California → Energy Commission

NAICS

N/A

Place of Performance

Turlock, CA, 95382

Set-Aside

NONE

Documents

(1)

CEC Notice of Exemption for Monte Vista Apartments Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Energy Commission
Contacts1 person available
OfficeN/A
Organization / Agency
California → Energy Commission
Office AddressN/A
Contacts
GypsyBuilding Standards Branch Manager

Full Description

Show more
On May 09, 2018, the California Energy Commission (CEC) adopted the 2019 Building Energy Efficiency Standards (California Code of Regulations, Title 24, Part 1, Chapter 10, and Part 6; also known as the California Energy Code), which went into effect January 1, 2020. Section 150.1(c)14 of the 2019 Energy Code requires the installation of solar photovoltaic (PV) systems for newly constructed low-rise residential buildings, including multifamily developments. Title 24, Part 1, Section 10-109(k), Photovoltaic System Requirement Determination, states, “The Commission may, upon written application or its own motion, determine that the photovoltaic requirements in Section 150.1(c)14 shall not apply, if the Commission finds that the implementation of public agency rules regarding utility system costs and revenue requirements, compensation for customer-owned generation, or interconnection fees, causes the Commission’s cost-effectiveness conclusions, made pursuant to Public Resources Code 25402(b)(3), to not hold for particular buildings.” At its December 8, 2025, business meeting, the CEC has adopted a finding, pursuant to the California Code of Regulations, Title 24, Part 1, Section 10-109(k), that the unique public agency rules adopted by Turlock Irrigation District (TID), the electrical requirements established by the City of Turlock Building and Safety Division/Fire Inspector (City of Turlock), and the solar PV system costs estimated in bids from electrical and solar contractors to install locally compliant system designs, provided in Pacific West Communities, INC.’s application, cause the Commission’s solar PV cost-effectiveness conclusions in the 2019 Energy Code to not hold for the newly constructed low-rise multifamily buildings in the Monte Vista Apartments Project within the City of Turlock and TID service area. Accordingly, as a result of the finding above, the CEC has determined that the 2019 Energy Code solar PV requirements in Section 150.1(c)14 do not apply to the newly constructed low-rise multifamily buildings in the Monte Vista Apartments Project as identified in Pacific West Communities, Inc.’s application to the CEC.

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS