Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Determine the availability of Advanced Metering Infrastructure (AMI) electric meter devices with stated salient characteristics from responsible sources, NAVFAC MIDLANT AOR

Active
N4008526ML075Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → Navfacsyscom Mid-AtlanticView Agency

NAICS

334515 - Instrument Manufacturing for Measuring and Testing Electricity and Electrical SignalsView NAICS

Place of Performance

VA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Mid-Atlantic
Contacts1 person available
OfficeNORFOLK, VA, 23511-0395, USA
Organization / Agency
Department Of Defense → Navfacsyscom Mid-Atlantic
View Agency Profile
Office AddressNORFOLK, VA, 23511-0395, USA
Contacts

Full Description

Show more

Naval Facilities Engineering Systems Command, Mid-Atlantic, is issuing this Sources Sought Notice for market research purposes only. This notice does NOT constitute a request for proposal, quote, and/or invitation for bid. The purpose of this notice is to determine the availability of Advanced Metering Infrastructure (AMI) electric meter devices with the following salient characteristics from responsible sources:



  1. Capability of measuring and transmitting electrical utility meter data.
  2. Capability of being operated using Schneider Electric software (EcoStruxure Power Monitoring Expert  (PME), ION setup, Vista and Management Console) or Electro Industries/GaugeTech (EIG) software (CommunicatorPQA® Power Monitoring Software (CommPQA)) for their configuration and programming to create, modify, and download meter programming, database, graphics, and meter configuration files and shall be installed by manufacturer authorized/trained/certified companies and individuals.
  3. Capability to connect to existing Advanced Metering Infrastructure (AMI) system at government installations located in the NAVFAC MIDLANT area of responsibility (AOR) as described below.
  4. Capability to obtain and maintain Authority to Operate (ATO) certification in accordance with Department of Defense Instruction (DODI) 8500.01 and DODI 8510.01.


BACKGROUND:



NAVFAC Mid-Atlantic is working on multiple Class Justification and Approvals (J&As) for various projects in the NAVFAC MIDLANT AOR. This Class J&A would authorize the inclusion of brand-name specifications, under the authority of 10 U.S.C. 3204(a)(1), for electrical metering devices utilizing software for Configuration/Programming and for Connection to the EMCS located at various government installations located in the NAVFAC MIDLANT AOR. The NAVFAC MIDLANT AOR includes Naval installations in the states of Maine, Rhode Island, Connecticut, New Jersey, Pennsylvania, Indiana, Illinois and Virginia. It is anticipated that the proposed Class J&As will cover various construction projects from Fiscal Year (FY) 2026 to 2031.



• The Schneider PME system provides monitoring of electrical power parameters including; consumption, voltage, current, power quality and others on electrical distribution systems. It works by connecting over a communications network to various electrical metering devices. The Schneider system is only used on the following installations in the MIDLANT AOR:



  • Naval Station Great Lakes
  • Naval Weapons Station Crane


• The Schneider electrical power metering devices used on the listed NAVFAC MIDLANT AOR installations are; PowerLogic ION 8600 and 8650 and PowerLogic ION9200.



• Further technical specifications pertaining to the Schneider Electric meters and software can be found on Schneider Electric’s website at: https://www.se.com/us/en



• The EIG system provides monitoring of electrical power parameters including; consumption, voltage, current, power quality and others on electrical distribution systems. It works by connecting over a communications network to various electrical metering devices. The EIG system is used on all MIDLANT AOR installations not using the Schneider Electric meters.



• The EIG electrical power metering devices used on the listed NAVFAC MIDLANT AOR installations are; Shark 250 and Shark 270 Power Meters.



•Further technical specifications pertaining to the EIG meters and software can be found on EIG’s website at: https://www.electroind.com/



Based on internal Government research, the following was found to be sufficient preliminary rationale to permit other than full and open competition under the authority of 10 U.S.C. 3204(a)(1), Only One Responsible Source/Limited Number of Sources and No Other Type of Property or Services Will Satisfy the Needs of the Agency.



1. Establish and maintain a defensible cybersecurity posture.


2. Maximize utilization of existing government-licensed software to configure and program the controllers.


3. Maintain installation networked facilities control and monitoring system so that all controllers can be programmed from a central station versus a hybrid system composed of many different controllers and associated configuration/programming software


4. Avoid the significant operational burden and cost of having maintenance and engineering staff become proficient with the configuration, programming, commissioning, operation, and maintenance of controllers from multiple manufacturers.



INSTRUCTIONS TO INTERESTED PARTIES:



Please note that this is not a Request for Proposal (RFP), a promise to contract, or a commitment of any kind on the part of the Government. There will be no debrief, evaluation letters, and/or results to be issued to interested parties that choose to respond.  Information obtained from this Sources Sought Notice is for market research purposes to determine whether another companies’ similar products can meet, or be modified to meet, the Governments needs which will facilitate the decision making process. All information received in response to this Sources Sought Notice marked or designated as proprietary information will not be released outside the Government. The Government shall not reimburse or assume any cost incurred by interested parties that respond to this notice.



Interested parties shall provide the following:



1. Company Information – Attachment 1



2. Electrical Power MetersTechnical Information:



Provide a list of commercially available electrical power meters, manufactured by your organization, for which Schneider Electric software (EcoStruxure Power Monitoring Expert  (PME), ION setup, Vista and Management Console) or Electro Industries/GaugeTech (EIG) software (CommunicatorPQA® Power Monitoring Software (CommPQA)) have been utilized to create, modify, download and upload meter programing, database, graphics, and configuration files. Include the following information for each controller:



a. Model Number, Catalog Number, Code Number, or equivalent model designation



b. Product Description



c. Meter Application (please specify): ‘Advanced Meter’ or ‘Other'



d. Communications Protocol: ‘MODBUS’



e. Manufacturer's technical data sheets.



3. Experience (3 pages maximum):



Identify one (1) to three (3) installed systems where Schneider Electric software (EcoStruxure Power Monitoring Expert  (PME), ION setup, Vista and Management Console) or Electro Industries/GaugeTech (EIG)) has been used to successfully program and configure non-Schneider or non-EIG meters presented under item 1 above. For each project, provide:



a. Customer Point of Contact including name, phone number, and email



b. Narrative Description of the product/services provided by your organization



c. If available, Project information including title, project location (city/state), procurement contract number, and contract value.



Responses to this notice shall be sent electronically to Holly Manning, Contract Specialist, at holly.n.manning.civ@us.navy.mil no later than 2:00pm EST on Friday, 8/6/2026. Hardcopy or facsimile submissions shall not be accepted or considered by the Government. Responses received after the deadline or without the required information shall not be considered by the Government.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → Navfacsyscom Mid-Atlantic

Same awarding agency

NAICS: 237990
New
Federal
Design-Bid-Build, P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, ConnecticutThe contract solicitation N4008526R0004 is for the Design-Bid-Build construction of the P-1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base New London in Groton, Connecticut. The project involves comprehensive construction activities including demolition, site work, utilities, security systems, fire protection, HVAC, electrical systems, and the construction of multiple specialized buildings such as weapons magazines, operations buildings, and administrative facilities. The scope also includes government-estimated option items for audiovisual systems, furniture and fixtures, environmental monitoring, groundwater analysis, and extended site security. All work must comply with stringent military and federal standards including MIL-STD-129, MIL-STD-1320 through 1323, and 49 CFR 173 for packaging, marking, and hazardous material handling. Packaging and materials must be chemically compatible, structurally sound, and properly labeled with 2D Data Matrix barcodes and "EMPTY" markings where applicable. The contract mandates full adherence to UFGS specifications, ANSI, ASHRAE, IEEE, and NFPA standards for systems integration and performance. All personnel working on-site must be U.S. citizens, subject to security clearance verification, and must adhere to strict site access protocols prohibiting explosives and open burning. Key personnel including the Project Manager, Quality Control Manager, Site Safety and Health Officer, and alternates must be identified within 20 days of award, with role separation enforced between safety and quality functions. The SSHO and alternate SSHO must be physically present on-site at all times. Compliance with FAR clauses including 52.215-1, 52.222-90, 52.236-15, 52.243-4, 52.249-2 Alternate I, and 252.204-7019 is required, alongside specific cybersecurity, DEI, and small business subcontracting obligations under FAR and DFARS. Invoicing is exclusively through Wide Area WorkFlow with attachments limited to 2 MB. Offerors must demonstrate corporate experience through at least two qualifying projects totaling $1.5 million in building/structure work, $1 million in road construction, or $500,000 in demolition, and must provide current UEI and CAGE codes. The solicitation has been amended seven times with a response
Other Heavy and Civil Engineering Construction

POSTED

about 23 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Federal
Multiple Location BEQ Chiller Loop Flushing and Chemical CleaningOnly Mechanical MACC Contractors listed on the General Requirements cover page are eligible to submit proposals for this Total Small Business Set-Aside under FAR 19.5, with a NAICS code of 236220, for the Multiple Location BEQ Chiller Loop Flushing and Chemical Cleaning project at Camp Lejeune, North Carolina. The solicitation, identified as N4008526R9049, was posted on July 9, 2026, with a proposal deadline of August 5, 2026, at 3:00 PM EST, and must be submitted electronically to two designated Navy email addresses. The contract requires the comprehensive chemical cleaning, flushing, and passivation of chilled water closed-loop systems serving Bachelor Enlisted Quarters, with strict adherence to UFGS 23 25 00 and 23 24 00 standards, and must remove organic soil, hydrocarbons, flux, pipe mill varnish, pipe compounds, and iron oxide—while not requiring removal of tightly adherent mill scale. Work must be performed in phases including 48-hour circulation of heated detergent solution at 120°F, followed by terminal unit circulation, fresh water flushing until water opacity is perfectly clear, manual cleaning of all strainers and screens, and final passivation using Sodium Sulfite and Sodium Lauroly Sarcosinate within a pH range of 8.5–9.5, all while minimizing disruption to ongoing facility operations. The winning contractor must submit a detailed Schedule of Prices within 15 calendar days of award, host a partnering session within 45 days, and conduct Red Zone Meetings at 75% completion or three to six months before Beneficial Occupancy Date, whichever comes first. Invoicing is mandated through Wide-Area Workflow (WAWF), with required attachments including monthly work-hour reports, updated construction schedules, safety self-evaluation checklists scoring 90 or above, submittal registers, solid waste disposal reports, and certified payrolls; final invoices require the original Contractor's Final Release Form and certification of transportation by sea. A bid bond is required for proposals over $35,000, with payment and performance bonds required for those exceeding $150,000, and all contractors must carry insurance meeting FAR 28.307-2 liability standards. Compliance with USACE EM 385-1
Commercial and Institutional Building Construction

POSTED

about 23 hours ago

DEADLINE

in 26 days
View Details
NAICS: 236220
New
Federal
Repair BEQ FC555This contract, titled Repair BEQ FC555 and solicited under N4008526R9043, is a total small business set-aside under NAICS code 236220 for construction services at Marine Corps Base Camp Lejeune, North Carolina. Only General MACC Contractors listed on the General Requirements cover page are eligible to submit proposals, and the work involves comprehensive renovation of Bachelor Enlisted Quarters building FC555, demolition of the existing mechanical building FC556, and construction of a new mechanical structure adjacent to FC555. The project includes civil and utility upgrades such as sidewalk replacement, parking lot milling and striping, extension of public sewer, domestic water, fire water, and mechanical piping systems, and construction of a new trash dumpster enclosure. Landscaping improvements are offered as an optional line item. The work is governed by detailed specifications and drawings, with mandatory compliance to FAR clauses addressing material and workmanship, specifications and drawings, prompt and fixed-price payments, progress payments, and the Buy American Act. Asbestos and lead surveys are provided, and unforeseen ACM and lead removal are included as separately priced line items with specified quantities for bidding. The contract has a performance period of 910 days after award and requires strict adherence to packaging, labeling, and delivery standards, including use of original manufacturer packaging, proper markings per MIL-STD-101, and sealed wrapping for insulation and refrigerant piping. All materials must be manufactured no more than one year prior to delivery, with certain items limited to six months. Invoicing must be submitted through Wide-Area Workflow (WAWF) within five calendar days of the invoice date, with payment contingent upon prior submission and acceptance of a detailed Schedule of Prices that breaks down costs by building, construction category, quantity, unit price, and extended price. The Contractor must use the electronic Construction Management System (eCMS) for submittals and maintain designated key personnel roles—Project Manager, Superintendent, Quality Control Manager, and Site Safety and Health Officer—each subject to dismissal for nonperformance. Safety compliance with EM 385-1-1 is enforced, requiring an Accident Prevention Plan, hazard tracking, SDS documentation, and safety indoctrination records. Testing protocols for firestopping, electrical systems, and GIS data must be submitted in advance with documentation delivered within prescribed timeframes, and final acceptance requires 14 days’ notice with full representation from both Contractor and Government personnel.
Commercial and Institutional Building Construction

POSTED

about 23 hours ago

DEADLINE

in 7 days
View Details
NAICS: 236220
New
Federal
Repairs to Building 3918 to Relocate USMC Post OfficeThis procurement, identified by solicitation number N442487413945, is a small business set-aside under NAICS code 236220 for repairs to Building 3918 at Marine Corps Air Station Cherry Point, North Carolina, to relocate the USMC Post Office, along with the demolition of Building 153 and incidental related work. The solicitation is restricted exclusively to contractors listed under the General MACC program, and only those entities may submit proposals. The work involves extensive renovation and construction activities, including the installation of loading dock equipment, relocation of food service equipment, building commissioning, and compliance with detailed specifications referenced in numerous drawings and appendices, such as reflected ceiling plans, roof plans, exterior and interior elevations, door schedules, and asbestos bulk sample results. All materials must be delivered in original manufacturer packaging, stored in clean dry conditions, and labeled in accordance with MIL-STD-101 and MIL-STD-129, with steel studs requiring specific stamped markings for ICC number, manufacturer ID, steel thickness, coating designator, and yield strength. The contract mandates strict adherence to federal, state, and local regulations including USACE EM 385-1-1, 29 CFR 1926.1101, 40 CFR 61 and 763, and the Americans with Disabilities Act, with the most stringent requirements governing in case of conflict. Environmental protocols for asbestos handling are strictly enforced, and compliance with Buy American provisions is required unless an exception is granted and substantiated with cost data prior to submission. Pricing is evaluated on a lowest price basis, with the total cost of all options added to the base price for award determination. Payment terms follow FAR 52.232-27 and FAR 52.232-5, with invoices submitted via WAWF and requiring a QC Manager-signed certification that as-built drawings are current and work complies with contract requirements. Contractors must use NAVFAC’s eCMS system for all technical documentation submissions, and electronic submissions via email or paper are prohibited unless explicitly allowed. The Contracting Officer Representative (COR) serves as the central point of contact for access, security, PKI, eCMS, and personnel changes. Bid bonds are required for proposals over $150,000, with payment and performance bonds also required upon award, and proposals under $35,000
Commercial and Institutional Building Construction

POSTED

about 23 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
Federal
Repair BEQ G702/G703This contract, solicitation number N4008526R9050, is a fixed-price construction project titled "Repair BEQ G702/G703" located at Camp Lejeune, North Carolina, issued by the U.S. Navy’s NAVFACSYSCOM Mid-Atlantic under a Total Small Business Set-Aside per FAR 19.5. Only contractors listed on the General Requirements cover page are eligible to submit proposals, and all submissions must address every listed line item or risk being rejected as non-responsive. The project involves comprehensive repairs to two Bachelor Enlisted Quarters, requiring work across architectural, structural, civil, mechanical, electrical, plumbing, fire protection, telecommunications, and interior systems, governed by a defined Basis of Design and detailed construction drawings. The contract mandates strict adherence to material handling and storage requirements compliant with manufacturer instructions and MIL-STD-129, including protection from moisture, heat, and off-gassing materials, with insulation and piping subject to specialized storage conditions. Submittals must include preconstruction schedules, shop drawings, test reports, and safety certifications, and a certified Quality Control Manager must attest to compliance with contract requirements for every payment request, along with certification that as-built drawings are current and coordinated. The contracting procedure follows a Lowest Price Technically Acceptable (LPTA) methodology, where proposals are first evaluated for technical acceptability against pass/fail gates—any “Unacceptable” rating in the Technical Approach or other non-price factors eliminates the proposal from consideration regardless of price. The lowest-priced technically acceptable proposal will be awarded without negotiations, except for clarification per FAR 15.306(a). Payment is governed by FAR clauses 52.232-5 and 52.232-27, requiring invoices to be submitted on NAVFAC Form 7300/30 with supporting documentation on NAVFAC Form 4330/54, and all payments are contingent upon the Contracting Officer’s acceptance of a detailed Schedule of Prices provided within ten days of award. Bonding requirements are tiered: no bonds for proposals under $35K, payment bonds only between $35K and $150K, and bid, payment, and performance bonds required for proposals $150K and above. Proposals must be submitted via email to designated points of contact and include one original hard copy in a three-ring binder and one CD-ROM, along with a
Commercial and Institutional Building Construction

POSTED

about 23 hours ago

DEADLINE

in 19 days
View Details
NAICS: 236220
New
Federal
Design-Build (DB) Barracks Initiative (Package #2), Marine Corps Base (MCB) Camp Lejeune, North CarolinaThis solicitation, designated N4008526R0058, seeks qualified contractors for a Design-Build project to replace five existing Bachelor Enlisted Quarters buildings at Marine Corps Base Camp Lejeune and Marine Corps Air Station New River in North Carolina, providing new billeting for 1,130 personnel through 565 two-person rooms. The project involves demolition of specific buildings including HP51, HP53, HP55, HP57 at Hadnot Point and BEQ 1340 at French Creek, as well as BEQ AS4200, support building AS4201, and the HIIT Center AS4024 at New River, followed by the construction of two new three-story BEQ structures at Hadnot Point featuring integrated community amenities such as laundry, vending areas, multi-purpose rooms, community kitchens, administrative and housekeeping spaces, mechanical and electrical systems, bulk storage, public restrooms, and a recreation shelter. The work is governed as a fixed-price contract with a mandatory 1,461-calendar-day completion window, beginning within 15 days of the notice to proceed, and includes strict adherence to UFGS specifications, the EM 385-1-1 safety standard, and a three-phase quality control process requiring documented construction tolerances and workmanship standards. All proposals must be submitted electronically via the PIEE Solicitation Module in PDF format under 1.9 GB, divided into separate price and non-price volumes, with no emailed submissions accepted. The solicitation is structured in two phases: Phase One requires submission of technical factors 1–4, with only those rated acceptable moving to Phase Two, where Factors 5–6 and price proposals are due. Factor 1 (Technical Approach) and any deficiency in requirements are pass/fail gates; if any non-price factor is rated unacceptable, the entire non-price evaluation is deemed unacceptable unless corrected. Past Performance, Experience, Safety, Technical Solution, and Small Business Utilization are weighted equally among themselves, and collectively are significantly more important than price. Contract administration mandates submission of a detailed Schedule of Prices within 15 days of award, with monthly invoicing required using NAVFAC forms and certified by the QC Manager, supported by compliance reports including work-hour logs, safety evaluations, certified payrolls, testing logs, and solid waste disposal records. Payment is tied to this schedule and processed under FAR 52.232-27 and
Commercial and Institutional Building Construction

POSTED

about 23 hours ago

DEADLINE

in about 1 year
View Details
NAICS: 236220
New
Federal
Overhaul Elevator, Building 4224 (FRCE)This procurement for the overhaul of the elevator in Building 4224 at MCAS Cherry Point, North Carolina, is a total small business set-aside under NAICS code 236220, restricted exclusively to General MACC contractors listed in the RFP cover letter. The work involves complete replacement of the elevator system and all incidental related tasks, with performance required within 300 calendar days. The contract mandates strict adherence to building and safety codes, specifically ASME A17.2 for elevator inspection and testing, which must be conducted in the presence of a NAVFAC-certified Qualified Elevator Inspector. All testing requires furnishing calibrated instruments including tachometers, accelerometers, hydraulic pressure gauges, and mega ohm meters, with each elevator subjected to a one-hour continuous automated endurance test under rated load. The contractor is responsible for all re-inspection and re-testing costs if initial acceptance fails. The contract incorporates FAR clauses for prompt payment, fixed-price construction payments, Buy American requirements for construction materials, protection of existing site elements, operational and storage area management, and modified schedule requirements. Detailed specifications and drawings are provided as attachments, including asbestos and lead test results, certification documents, and technical figures. Materials must be delivered in unopened, undamaged manufacturer packaging with clear labeling of manufacturer name, brand, specification, and date codes. Insulation must be asbestos-free and labeled with manufacturer details and shelf life; pipes must carry ASTM markings and be capped until installation. All materials must be stored per manufacturer instructions, protected from moisture, temperature extremes, contamination, and off-gassing substances like drying paints. The contractor must submit invoices monthly through WAWF within five calendar days of the invoice date, accompanied by a QC Manager certificate verifying compliance and current as-built drawings. Final invoices require the Final Release Form and certification of sea transportation. A 3-Week Look Ahead schedule is mandatory, and operation and maintenance data must be submitted two months before beneficial occupancy. Bonding is required for proposals exceeding $35,000, with bid, performance, and payment bonds mandated for amounts over $150,000. Site-specific requirements include compliance with MCAS Cherry Point Air Station Orders, environmental regulations, approved dust control methods, traffic restrictions during peak hours, and installation of reduced pressure backflow prevention assemblies when accessing government water systems. All personnel must be approved by the Contracting Officer, and any handling of PII, CUI, or classified information requires an approved Information Assurance plan. Prop
Commercial and Institutional Building Construction

POSTED

about 23 hours ago

DEADLINE

in 5 days
View Details
NAICS: 238220
New
Federal
Boiler Maintenance & RepairThe contract is for boiler maintenance and repair services at the Naval Submarine Base New London in Groton, Connecticut, requiring the contractor to provide all labor, materials, supervision, tools, equipment, transportation, and facilities necessary to fulfill the tasks outlined in the Performance Work Statement. The government plans to award a Firm-Fixed-Price, Indefinite-Delivery, Indefinite-Quantity contract with a one-year base period and four additional one-year option periods, each with a minimum guarantee established for the base period. All work must be performed in accordance with the requirements specified in the solicitation, and the contractor must be fully capable of delivering services without additional cost adjustments. Solicitation N4008526R0173, issued under NAICS Code 238220 for Plumbing, Heating, and Air-Conditioning Contractors, is unrestricted and open to businesses with size standards of $19.0 million or less. Proposals will be evaluated using a Lowest Price Technically Acceptable approach based on three factors: Price, Corporate Experience, and Past Performance, with award going to the most cost-effective offer that meets technical requirements. Offerors must be currently registered and active in the System for Award Management prior to contract award, and failure to maintain active SAM registration will result in disqualification. The solicitation was posted on July 17, 2026, with proposals due by September 3, 2026, and the performance location is Groton, Connecticut, while the contracting office is located in Norfolk, Virginia. Point of contact information is provided for questions and correspondence.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 23 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Federal
MARSOC Buildings RR531 and RR532 Flooring RepairsThis contract, identified by solicitation number N4008526R9045, is a Total Small Business Set-Aside under FAR 19.5 for flooring repairs at Buildings RR531 and RR532 aboard Marine Corps Base Camp Lejeune, North Carolina, under NAICS code 236220. Work includes mechanical scarification of approximately 21,840 square feet of concrete floor surface to achieve a uniform non-skid texture (CSP 4-5), with 10,920 square feet allocated to each building. The contractor must provide all labor, materials, supervision, specialized equipment, and dust control systems to complete the project in accordance with Division 01 MACC Specifications and applicable construction standards. Submittals must include manufacturer product data, technical specifications, and a flooring warranty compliant with the Combined Division 01 Specifications. All proposals must be submitted via email to the primary and secondary points of contact by August 10, 2026, at 2:00 PM EST, and only contractors listed on the M&R MACC General Requirements cover page are eligible. Proposals valued at $35,000 or more require a payment bond, while those exceeding $150,000 also require a bid bond (20% of proposal amount) and a performance bond, with electronic copies acceptable. Proposals under $35,000 are exempt from bonding requirements. The contract requires strict compliance with federal, state, and local regulations, including USACE EM 385-1-1 for safety, EO 12088 and EO 14057 for environmental and sustainability standards, and CERCLA/SARA for hazardous waste management. The contractor must adhere to the Buy American Act for construction materials and comply with prevailing wage requirements. Invoicing is mandatory through the Wide Area Workflow (WAWF) system with attachments not exceeding two megabytes each, using NAVFAC Forms 7300/30 and 4330/54, accompanied by a QC Manager’s certification confirming compliance and as-built documentation. Monthly submissions include work-hour reports, construction progress schedules, safety self-evaluation checklists (with minimum 90 score), certified payrolls, testing logs, and solid waste disposal reports; failure to submit the Monthly Exposure Report may result in a 10% voucher retention. A comprehensive Construction Schedule
Commercial and Institutional Building Construction

POSTED

about 23 hours ago

DEADLINE

in 17 days
View Details