Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

DEV2021-00131 A-Town Development Area F

Forecast
2025-00013State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Anaheim is implementing the OCVIBE project, which includes several key development components and infrastructure improvements. A primary focus is the construction of Parking Deck A, a seven-story structure providing 1,840 parking stalls. This effort involves a final site plan, amendments to the OCVIBE Master Site Plan, and conditional use permits for reduced setbacks along Douglass Road and State Route 57, as well as modifications to the OCVIBE Mural Plan. Additionally, the project encompasses the South Plaza development, which includes a hotel and entertainment spaces. Complementing these developments is the Orangewood Avenue Improvements project, managed under Lake and Streambed Alteration Agreement EPIMS-ORA-57876-R5 by the California Department of Fish and Wildlife. This infrastructure work involves widening Orangewood Avenue from four to six lanes and modifying bridge structures over the Santa Ana River, specifically adding 30 to 35 feet of surface area along the north side of the existing bridge and retrofitting pier foundations. The project adheres to California Code of Regulations and requires the implementation of standard Best Management Practices for pollution prevention, site restoration of temporary impacts, and specific compliance reporting. All associated environmental impact reports have been certified as adequate, with no new significant environmental effects identified.

General Info

Anaheim OCVIBE project involves Parking Deck A, South Plaza, and Orangewood Avenue improvements.

Place of Performance

Ball Rd from Sunkist St to River Rd, Anaheim, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Anaheim
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → City of Anaheim
Office AddressN/A

Full Description

Show more
The City of Anaheim Public Utilities Department (APU) proposes the Ball Road Water Transmission Main Project (Project) to improve the potable water distribution system to support the previously approved OCVIBE development. The proposed infrastructure improvements along Ball Road will strengthen water supply reliability, capacity, and operational flexibility within the Platinum Triangle area. With this Project, APU would install approximately 2,620 linear feet of new 20-inch diameter water transmission main along Ball Road, between Sunkist Street and River Road. The pipeline will generally be installed underground beneath the existing paved roadway. At the 57 freeway (SR-57), APU will transition the pipeline to an approximately 18-inch diameter welded steel pipe installed within an interior cell of the existing Ball Road overcrossing.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
Floodplain Management and Community Rate System (CRS) Consulting Services
Solicitation # 2026-154
The City of St. Cloud is seeking a qualified contractor to provide Floodplain Management and Community Rate System (CRS) Consulting Services on an as-needed basis. The primary objective is to support the FEMA National Flood Insurance Program (NFIP) and administer CRS activities to maintain or improve a CRS Class 5 rating or better. Key deliverables include preparing documentation for annual recertification, identifying opportunities for additional CRS credit, providing staff training on elevation certificates and LOMC procedures, and offering emergency support for post-storm damage assessments and disaster recovery. The project team should ideally include a Certified Floodplain Manager (CFM) and a Florida licensed Professional Engineer (PE). The contract has an initial term of three years, with the possibility of two additional one-year renewals upon mutual agreement. Proposals are evaluated by a committee of at least three members using a 100-point scoring system that considers price via a ratio method and requires a minimum of five similar past contracts to demonstrate experience. Awarded contractors must act as independent entities, provide necessary insurance and bonds, and comply with various federal and state regulations, including the Davis-Bacon Act, the Americans with Disabilities Act, and the Florida Prompt Payment Act. Payments are processed via electronic funds transfer or P-Card within 30 days of receipt of a valid invoice.
City Of St. Cloud

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS