This Solicitation opportunity from California was posted on October 24, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Los Cerritos Channel Sub-Basin 4 Stormwater Capture Facility Phase II Record Drawings: Phase II record drawings (as-built plans) for the Los Cerritos Channel Sub-Basin 4 Stormwater Capture Facility, involving the City of Signal Hill and City of Long Beach. The document includes construction notes regarding traffic safety, signage, and MUTCD compliance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Los Cerritos Channel Subbasin - As Built Plans - Phase 1: As-built record drawings and general structural notes for Phase 1 of the Los Cerritos Channel Subbasin project. The document includes detailed technical specifications for design criteria (2013 CBC, AASHTO), concrete compressive strength (5,000 PSI), reinforcing steel requirements (ASTM A706), and foundation bearing pressures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Los Cerritos Channel Subbasin - As Built Plans - Phase 3: As-built plans and technical specifications for Phase 3 of the Los Cerritos Channel Subbasin project, including traffic control notes, signage requirements per MUTCD standards, and construction site legends.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Los Cerritos Channel Subbasin - Phase 3 Final Grading Plan: Record drawing and final grading plan for Phase 3 of the Los Cerritos Channel Subbasin project, prepared by GHD Inc. The document serves as an accurate representation of the completed construction work.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Los Cerritos Stormwater Capture Facility - Geotechnical Investigation Report (Jan 2017): Revised geotechnical investigation report dated January 13, 2017, prepared by GHD Inc for the Los Cerritos Stormwater Capture Facility in Long Beach, California. The document provides subsurface exploration results, laboratory testing, and critical geotechnical design criteria and recommendations for site preparation, foundations, seismic design, and infiltration. It supersedes previous reports from Leighton Consulting and GHD.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP AP-24-489 Addendum No. 1 - Long Beach Airport: Addendum No. 1 dated December 17, 2024, for RFP No. AP-24-489 regarding a Development and Lease Opportunity at Long Beach Airport. This document updates the site investigation date to January 7, 2025, and the proposal due date to January 23, 2025, at 11 am. It also includes a Q&A section confirming the availability of as-built plans, geotechnical reports, and grading plans.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP - AP-24-489 Development and Lease Opportunity at Long Beach Airport: The City of Long Beach is seeking proposals from qualified entities to lease and develop approximately 9.63 acres of city-owned property at Long Beach Airport for primarily aeronautical purposes. Released on October 24, 2024, the solicitation includes an optional pre-proposal meeting on November 14, 2024, with proposals due by January 7, 2024. The selected developer will enter into a lease agreement with a minimum initial ground rental rate of $50,000 per acre per year.
PDF
PDF, Low priority1 page · other
LowAI Summary for 04_Future_ALP_with FAA Approval: The document content consists of fragmented characters, repetitive codes (e.g., RVZ, ROFA, RSA, RPZ, OFZ, TOFA), and numerical sequences. It does not contain legible procurement text, solicitation details, or a statement of work. It appears to be a corrupted file or a non-textual data export.
PDF
PDF, Low priority1 page · specifications
LowAI Summary for Airport Topo-Coffman-02-Sht 2-c1: The document appears to be a technical drawing or map legend for an airport topographic survey (Airport Topo-Coffman). The provided content is limited to a legend header.
PDF
PDF, Low priorityother
LowAI Summary for Attachment A: Authorization & Certification: A certification and authorization form for proposers submitting bids to the City of Long Beach. It includes attestations regarding signing authority, ethics compliance, federal debarment status, a local preference provision for Long Beach-based businesses, and a table for listing exceptions to terms and conditions.
PDF
PDF, Low priorityother
LowAI Summary for Attachment B: Equal Benefits Ordinance Certification Form: A certification and disclosure form for the City of Long Beach requiring contractors to certify compliance with the Equal Benefits Ordinance (EBO). The document outlines requirements for providing equal benefits to spouses and domestic partners, provisional compliance timelines, and penalties for non-compliance.
PDF
PDF, Low priority1 page · other
LowAI Summary for Exhibit Lakewood Parcel: The document is an exhibit titled 'LAKEWOOD PARCEL' but contains no further substantive content or procurement details.
PDF
PDF, Low priorityother
LowAI Summary for Los Cerritos Channel Project - Limited Shallow Soil Investigation Report: A technical report dated June 19, 2020, prepared by Kleinfelder for the City of Long Beach. The document details a limited shallow soil investigation at the Los Cerritos Channel Project site to evaluate the presence of chemicals of concern (COCs) through soil sampling and laboratory analysis of four shallow bores.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
1 update
PhaseClosed
Posted
Solicitation
Deadline changed
Response deadline changed from Jan 23, 2025 to Jan 7, 2025.
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.