This Solicitation opportunity from Utah was posted on May 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
DFCM Construction - Invitational - Division of Facilities Construction and Management - Brigham Regional Center Exterior Disconnects And Electrical Upgrades - Project #26353310
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The State of Utah’s Division of Facilities Construction and Management is soliciting bids for the installation of a new exterior disconnect and meter at the Brigham Regional Center in Brigham City, Utah, under Project #26353310, with a construction cost estimate of $122,000. This is an invitational solicitation, limited exclusively to four pre-approved electrical contractors: BML, Electric Works, Luminary Electric, and Paragon Electric. The solicitation number is CS26079, with a bid submission deadline of June 10, 2026, at 3:00 PM MST through the U3P portal, and all proposals must be submitted as electronic PDFs with bookmarked, navigable structures as well as in hardcopy bound in heavy-duty three-ring vinyl binders. The project requires full compliance with NFPA 70, UL 969, ANSI standards, OSHA signage regulations, and IEEE 81 for grounding resistance testing, with inspections conducted on-site by the Architect to verify electrical performance criteria including line voltage, ground impedance not exceeding 2 ohms, and grounding system resistance not exceeding 10 ohms. All work must adhere to strict material and labeling specifications, using UV-stabilized laminated acrylic or self-adhesive labels with alphanumeric identifiers for traceability, and no barcoding is required. Submittals must include detailed shop drawings, product data, labeled samples, operation and maintenance manuals, and compliance certifications from manufacturers, with no offeror-level representations such as UEI, CAGE, or socioeconomic status required. The contract is implied to be firm fixed price, with the contractor responsible for all inspections, testing, and corrective actions, subject to final acceptance by the Architect on behalf of DFCM. Deliveries and performance are centered at the Brigham Regional Center, and the contractor must coordinate logistics to minimize site disruption. Failure to comply with submission format, deadlines, or technical requirements will result in disqualification.
General Info
Agency
NAICS
Place of Performance
UT, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the referenced project:
**Project Description: Installing a new exterior disconnect, and meter at Brigham Regional Center**
**Construction Cost Estimate:$122,000.00**
More opportunities from Utah
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
