Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on September 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DFCM Construction - Prequalified Mechanical Stage II - Department of Workforce Services - Logan Mechanical Controls and HVAC Upgrades - Project #26054920

Closed
CS26014State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333413
New
DIBBS
41--FAN,VANEAXIAL
Solicitation # SPE8E9-27-T-0554
This contract is a Request for Quotations (RFQ) issued by DLA Troop Support, Construction & Equipment MRO SVC I for the procurement of nine vane axial fans, identified by NSN 4140-00-289-8885 and part number M18953-AA02WA4W6NANANA. The hardware must meet specific technical requirements, including a 440V AC three-phase power supply, a nominal air flow rate of 2000 cubic feet per minute, and clockwise rotation with outward flow. The item is designated as a critical application item and must comply with basic specification MIL-PRF-18953C(1) and quality assurance provision QAP 13873 QAP-EQ003. Additionally, the manufacturer must be Qualified Products List (QPL) approved at the time of award. Delivery is required within 318 days after order, with an original required delivery date of November 16, 2026, shipped FOB Destination to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The contract mandates strict adherence to MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Quality inspection will occur at the destination using sampling methods per MIL-STD-1916 or ASQ H1331, with a zero-non-conformance requirement for acceptance. Environmental restrictions prohibit the intentional use of mercury or Class I ozone-depleting chemicals. Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and compliance with various FAR and DFARS clauses regarding cybersecurity, sustainable products, and small business representations.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

1 day ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The contract pertains to a Stage II Invitation to Bid issued by the Utah Division of Facilities Construction and Management (DFCM) for the Logan Mechanical Controls and HVAC Upgrades project at the Department of Workforce Services in Logan, Utah. Only contractors who have been prequalified through a prior Stage I process and are currently listed on the DFCM prequalified contractors list are eligible to submit bids. The project involves comprehensive mechanical upgrades, including the removal and replacement of 11 rooftop units (RTUs), four exhaust fans, and the upgrade of building controls to Niagara N4, culminating in the installation of a new Building Automation System (BAS) head end and Jace. The estimated construction cost is approximately $605,000, with a substantial completion deadline of May 29, 2026. The solicitation, posted on September 25, 2025, emphasizes strict adherence to bid submission deadlines, mandatory pre-bid meetings, and compliance with detailed project specifications, drawings, and applicable codes. Supporting documentation includes detailed project specifications, approved mechanical and electrical plans, and comprehensive general conditions governing the contractual process. These documents specify the scope of work, safety protocols, quality standards, and coordination requirements, ensuring adherence to state and federal regulations. An asbestos survey report indicates no asbestos in bulk samples but notes roofing materials as assumed ACM until further testing, informing safety and compliance measures during construction. The procurement process underscores the importance of timely and qualified bid submissions, with communication channels restricted to designated DFCM representatives and all updates posted on the U3P platform. Overall, the project aims to modernize mechanical controls and HVAC systems at the facility, ensuring operational efficiency, safety, and compliance with current building codes and standards.

Documents

7
PDF, High priority: read this first60 pages · general-conditions
High
PDF, High priority: read this first261 pages · other
High
PDF, High priority: read this first8 pages · ifb
High
DOCX, Low priority1 page · other
Low
PDF, Low priority19 pages · other
Low
PDF, Low priority14 pages · contract-document
Low
DOCX, Low priority3 pages · instructions
Low

Read all 7 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • FILTER, ELEMENT, AIR,Open now, due in 7 days
  • POWER, BREEZEROpen now, due in 6 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah → DFCM - Division of Facilities Construction and Management
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Stage II Invitation to Bid Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project. The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the referenced project: Project Description: Removal and replacement of 11 RTUs, 4 exhaust fans, replace all the controls, and install a new BAS head end Niagara N4 and Jace, connect new RTUs, new exhaust fans and all existing mechanical equipment to the new BMS. Construction Cost Estimate: $605,000.00

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS