Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

DFCM Construction - Standard Low Bid - Department of Natural Resources - Rockport State Park Well Replacement - Project #27209510

Open
CS27029State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The State of Utah Division of Facilities Construction and Management is soliciting bids for the Rockport State Park Well Replacement project in Summit County. The scope of work involves drilling, constructing, developing, and testing a replacement well in the Cretaceous-age Kelvin Formation bedrock to a depth of approximately 500 feet, with a target pumping rate of 50 gpm. The project includes drilling surface and production boreholes, installing casing and screens, geophysical logging, well development, and the plugging and abandonment of the existing Rockport well. The estimated construction cost is 550,000.00 dollars. This is a standard low bid procurement where the contract will be awarded to the lowest responsive and responsible bidder. To be considered responsive, bidders must provide a bid bond equal to 5% of the bid and attend a mandatory pre-bid meeting. The contractor must comply with Utah Administrative Code rules for water wells and facility design, as well as UPDES General Permit requirements for construction dewatering. Awarded contractors must provide performance and payment bonds for 100% of the contract sum. Quality control is managed through inspections by the Engineer and Owner, with a requirement for 24-hour notice prior to any testing.

General Info

Utah seeks bids for a $550,000 well replacement project at Rockport State Park.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

7
PDF, High priority: read this first60 pages · general-conditions
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first51 pages · specifications
High
PDF, High priority: read this first400 pages · specifications
High
PDF, High priority: read this first7 pages · itb
High
DOCX, High priority: read this first3 pages · instructions
High
DOCX, Low priority1 page · compliance-form
Low

Read all 7 documents

Due in 30 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 30 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 7 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA
ContactsNo contact information available

Full Description

Show more
**INVITATION TO BID**
The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the referenced project:
**Project Description:** Drill replacement well and tie into existing Pumphouse.
**Construction Cost Estimate:**$550,000.00

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
Bonniebrook Water Service Lateral Reconnection
Solicitation # UH21004
The City of Stockton is soliciting bids for the Bonniebrook Water Service Lateral Reconnection project (UH21004), which involves the installation of approximately 300 linear feet of 1-inch potable water service lines using Horizontal Directional Drilling (HDD). The scope of work covers six residential homes along Bonniebrook Drive, between Woodside Drive and Fernvale Drive, in Stockton, California. The contractor is responsible for all labor, materials, and equipment required to extend service lines from new water meter boxes in residential front yards to existing potable water systems. Key deliverables include HDD installation, residential service transfer, capping and abandoning existing services, testing, flushing, disinfection, commissioning, and final surface restoration and cleanup. The contract will be awarded to the lowest responsive and responsible bidder based on the total price of the base bid and any selected alternates. Bidders must submit sealed envelopes containing official bid documents, a non-collusion declaration, and bid security. The successful contractor must provide both a Faithful Performance Bond and a Labor and Materials Bond, each for 100 percent of the contract bid price, issued by a company authorized in the State of California. Additionally, the contractor must adhere to prevailing wage rates and Title VI non-discrimination requirements. All work and materials are subject to inspection by the Construction Manager, and no work may be concealed without prior approval. Materials must be stored according to manufacturer instructions and hazardous materials must be handled in accordance with Material Safety Data Sheets and federal, state, and local regulations.
City of Stockton

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 17 days
View Details

More opportunities from Utah

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS