This Solicitation opportunity from Utah was posted on September 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DFCM Construction - VBS Construction Stage II - Invitation to Bid - Point of the Mountain State Land Authority - The Point Infrastructure Package 3 - Culinary Water Transmission Line - Project #25406300

Closed
MW25012 - Stage IIState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves a competitive bidding process for the construction of a water transmission line at the Point of the Mountain State Land Agency project in Draper, Utah. Only contractors who have been shortlisted through an earlier proposal stage are eligible to submit bids. The project entails constructing a water line that connects the existing Jordan Valley Water Conservancy District’s 48-inch line to a new 3 million-gallon storage reservoir near the Department of Corrections Administration Building, with tunneling under I-15 to integrate into the local distribution system. The line will include sections of 16-inch and 30-inch ductile iron pipe, a cathodic protection system, and a 48-inch steel casing tunnel. The estimated construction cost is approximately 1.99 million dollars. The solicitation, issued by the Division of Facilities Construction and Management of Utah, was posted on September 3, 2025, with a deadline for responses set for October 8, 2025. The project falls under NAICS code 336390, which pertains to other transportation equipment manufacturing, indicating specialized construction activities. Interested contractors can access further details and submit their bids through the designated online portal. The contract size is fixed at the estimated amount, emphasizing the project's scope and budget constraints.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah → DFCM - Division of Facilities Construction and Management
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
INVITATION TO BID This solicitation is Stage II: Invitation to Bid of a multistage selection process for construction services. Only Contractors short listed by the Selection Committee during the Stage I: Request for Proposals process for this project are invited to bid during this stage of the selection process. Project Description:The Point of the Mountain State Land Agency (POMSLA) is in the process of redeveloping the old correctional facility site located in Draper, Utah. As part of this work a water transmission line will be constructed to supply water to The Point. The line will connect to the existing 48” Jordan Valley Water Conservancy District line located in 14800 South. The line will then run to connections with a 3 MG storage reservoir located adjacent to the existing Department of Corrections Administration Building. The transmission line will then be tunneled under I-15 to connect to the distribution system for The Point. Line sizes will be between 16” and 30”. The work will include approximately 1,200 liner feet of 16” ductile iron, 1,300 linear feet of 30” ductile iron, cathodic protection system, and 300 linear feet of 48” steel casing tunneled under I-15. Construction Cost Estimate:$1,986,493.65

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS