This Solicitation opportunity from Utah was posted on July 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
DFCM Construction - VBS Consultant Services - Design Services - Department of Transportation - Multiple Pump House Replacements and Repairs - Project #27329900
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The State of Utah’s Division of Facilities Construction and Management is soliciting proposals under solicitation number CS27011 for the repair and replacement of five pump houses to meet UDOTS needs, with a construction budget of $3,242,656.00. The project requires comprehensive construction services including structural modifications, pump upgrades, electrical work, and material replacements, all to be executed in strict conformance with the Contract Documents, which include drawings, specifications, general and supplementary conditions, and applicable codes. Proposals must be submitted via the U3P portal by 12:00 noon on August 12, 2026, and must adhere to rigid formatting guidelines: a single PDF containing four sections—Cover Page (1 page), Letter of Introduction (1 page), Organizational Chart and Qualifications (7 pages), and Project Schedule (1 page)—for a maximum total of 10 pages, with all text in minimum 12-point font and 0.5-inch margins. Additional mandatory documents, including the DFCM Termination or Debarment Form and Past Performance References Form, must be uploaded as separate PDFs, with file sizes capped at 1 GB each and no hyperlinks or non-PDF content permitted. Contract administration requires the contractor to manage all work in accordance with a Critical Path Method schedule, achieving Substantial Completion within the defined contract time while ensuring full compliance with safety, legal, and technical standards. Responsibility for inspections lies with the contractor, who must facilitate access for DFCM and the Architect/Engineer and correct any nonconforming work at their own cost. Acceptance is finalized through documented approvals, including the Certificate of Substantial Completion and final payment certification, with payment applications submitted on DFCM-approved forms and reviewed for compliance with change orders and contractual obligations. Although no formal FAR clauses or evaluation factors are explicitly defined, proposal evaluation will likely weigh technical qualifications, management approach, and project scheduling experience, with an implied emphasis on prior performance and capability. The contract does not specify a basis of award, nor does it include socioeconomic set-asides, key personnel requirements, or option clauses. Payment details, accounting codes, and invoicing systems (e.g., WAWF) are not provided, and no named COR, COTR, or PCO contacts are identified. All work must be performed at the project sites across Utah, with materials delivered to site as directed, and bonding and insurance requirements are mandated under Article 10
General Info
Agency
NAICS
Place of Performance
UT, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The State of Utah - Division of Facilities Construction and Management (DFCM) is soliciting the services of qualified firms/individuals to perform **<
**Project Description: Repairing and Replacing 5 Pump houses to beer meet UDOTS needs.**
**Construction Budget: $3,242,656.00**
More opportunities from Utah
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
