Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Director's Review and Approval - SPR-26-0048

Forecast
SPR-26-0048State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Bakersfield is overseeing project SPR-26-0048, which involves the modification of an existing water well located at 1316 R Street, Bakersfield, California. The primary objective of this project is to install a Perfluoroalkyl and Polyfluoroalkyl (PFAS) treatment system to ensure the water supply complies with the U.S. Environmental Protection Agency PFAS National Primary Drinking Water Regulation for public health and safety. The work is categorized under NAICS code 237110 and must adhere to BMC 17.24.030. This project has been granted a categorical exemption under CEQA Class 01, Section 15301, as the treatment system is considered accessory to existing utility facilities and does not expand the primary use of the site. The project is managed by the City of Bakersfield Development Services Department, with Andrea Murillo serving as the Assistant Planner and Josh Bridegroom acting as the applicant. Official approval and documentation were signed on June 19, 2026.

General Info

Bakersfield to install PFAS treatment system at R Street well for drinking water compliance.

Agency

California → City of Bakersfield

Place of Performance

1316 R Street, Bakersfield, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Bakersfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Bakersfield
Office AddressN/A
Contacts
Andrea MurilloAssistant Planner
Josh BridegroomApplicant

Full Description

Show more
To modify an existing water well with a Perfluoroalkyl and Polyfluoroalkyl (PFAS) treatment system (BMC 17.24.030) at 1316 R Street.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is set aside for small businesses, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC pipes ranging from 6 to 30 inches and DIP pipes. Key deliverables include the construction of standard and doghouse manholes, interior drop assemblies, and specialized trenchless crossings with associated launch and receiving shafts. Additional requirements encompass CSO regulator fit out, outfall work, maintenance of flows and bypass, and site preparation activities such as clearing, grubbing, and the implementation of a Stormwater Pollution Prevention Plan. Site restoration will require seeding and fine grading of approximately 5,130 square yards. Project compliance requires adherence to environmental standards via SWPPP and the procurement of specific railroad insurance. Technical requirements include geotechnical instrumentation and monitoring. The project involves significant excavation, with specific provisions for extra depth excavation between 4 and 10 feet, as well as depths exceeding 10 feet.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To achieve a fully functional system, the project requires a wide array of materials and services, including AC paving, trucking, jack and bore operations, cold planing, welding, potholing, and the installation of various pipes and fittings. This solicitation is specifically targeted toward certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with DBE, MBE, SBE, WBE, SBRA, and LSAF certified firms. The project encompasses diverse specialty trades ranging from demolition and traffic control to survey markings and preconstruction video services. All work must be performed in strict accordance with the provided bid documents. The response deadline for this solicitation is November 19, 2026, at 2:00 PM, with primary points of contact being Destiny and Nathan Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS