This Solicitation opportunity from Florida was posted on October 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Discovery Science Center- Stair Fabrication and Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Ocala is seeking an experienced contractor for the removal of an existing exterior stair assembly and the fabrication and installation of a new hot-dip galvanized steel stair system at the Discovery Science Center. The project includes the installation of landings, guardrails, handrails, and all necessary anchorage. Bidders must hold a valid Florida General Contractor’s License and possess at least five years of experience in the fabrication or installation of exterior metal stair systems. The contractor is responsible for obtaining all required building and project-related permits at no additional cost to the city. A mandatory pre-bid meeting is scheduled for October 19, 2026, at 10:00 AM at the Discovery Science Center, with strict punctuality required to avoid disqualification. The project follows a tight timeline, requiring a maximum material lead time of two weeks and mobilization within five days of a Notice to Proceed. The total construction timeframe allows 30 calendar days for substantial completion and an additional 14 calendar days for final completion. All bids must be submitted by the deadline of November 4, 2026.
General Info
Place of Performance
Set-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Decorative Metal Fencing and RailingsOpen now, due in 19 days
- Structural Steel & Industrial Painting ContractorOpen now, due in 61 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Organization & Contact Information
Interested Companies (3)
Full Description
MANDATORY PRE-BID MEETING: Monday, October 19, 2026 at 10:00 Discovery Science Center 701 NE Sanchez Avenue Ocala, FL 34470 Any vendor who is more than 10 minutes late for the mandatory pre-bid meeting will be disqualified from bidding. Please arrive no later than 10:00 AM.
Scope of Work:
BACKGROUND
The City of Ocala requires the services of an experienced contractor to remove the existing exterior stair assembly and provide, fabricate, and install a new hot-dip galvanized steel stair system, including landings, guardrails, handrails, and all anchorage, at the Discovery Science Center, 701 NE Sanchez Ave, Ocala, FL 34470.
EXPERIENCE AND LICENSING REQUIREMENTS
1. Licensing Requirement: Bidder must possess a valid General Contractor’s License in the State of Florida to submit a bid for this project. 2. Experience Requirement: Bidder must possess five (5) years’ experience in providing fabrication or installation of exterior metal stair systems.
PERMIT REQUIREMENTS
Permits Required: Contractor will be responsible for obtaining permits at no additional cost to the City: • Building • All applicable permits pertaining to the scope of work/project
Construction Permit Applications: For construction permits and related documents, please visit: https://www.ocalafl.org/government/city-departments-a-h/growth-management/building/construction-permits
CONSTRUCTION TIMEFRAME
1. Construction Time: The contract time to Substantial Completion is 30 calendar days. The contract time to Final Completion is 14 calendar days after Substantial Completion. Contractor agrees, as a condition for submitting a bid, that this project will be completed in the time agreed upon between the City and the Contractor. The Contractor agrees to commence work on the date specified in a written “Notice to Proceed” by the City. Such “Notice to Proceed” will be issued at the pre-construction conference. The Contractor must be able to mobilize and begin construction no later than 5 calendar days after notification and complete the project by the time limit specified in the “Notice to Proceed.” At no time will the Contractor be allowed to lag behind.
2. Lead Time: The maximum acceptable lead time on materials is two (2) weeks. The City shall issue a Notice to Proceed (NTP) upon notification of receipt of materials by Contractor
More opportunities from Florida → City Of Ocala — Purchasing
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
