This Award Notice opportunity from Florida was posted on April 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
Contract E53F1 is an agreement between the Florida Department of Transportation District 5 and Masci General Contractor, Inc. for the resurfacing of SR 404 from SR 5 to SR A1A in Brevard County. Executed on April 28, 2025, the original contract was valued at 10,698,155.67 dollars with an initial performance period from June 9, 2025, to May 5, 2026, and a project duration of 210 calendar days. The scope of work includes asphalt resurfacing and technical specifications for traffic signaling equipment, as outlined in the specifications package prepared by Dewberry Engineers Inc.
Throughout the project lifecycle, the contract underwent numerous modifications via supplemental agreements and work orders. These changes included price increases for the installation of FPL transformers, fiber network connectivity for traffic signal cabinets, the replacement of damaged guardrails and drainage inlets, and the addition of missing permanent tape pay items. Other adjustments involved plan revisions for cabinet orientations, the relocation of a pedestrian pole, and the replacement of median chain link fencing. While some modifications resulted in minor price decreases due to revised foundation depths and pay item descriptions, others granted additional non-compensable contract time to account for asphalt sampling delays and utility installation issues.
General Info
FDOT District 5 and Masci General Contractor agreement for SR 404 resurfacing project.
HighAI Summary for Contract E53F1 SA No. 01 - Road No. 404: Supplemental Agreement (SA No. 01) dated 04/13/2026 between the Florida Department of Transportation and Masci General Contractors, Inc. for Contract E53F1. The modification incorporates Plan Revision 03 (dated 04/17/2025) to revise pay items and descriptions for pedestal mounted TMS cabinets and bridge mounted junction boxes. The agreement results in a contract price decrease of $3,790.50 with no change to the contract time.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for Contract E53F1 Supplemental Agreement No. 02: Supplemental Agreement dated 06/04/2026 between the Florida Department of Transportation and Masci General Contractors, Inc. for Road No. 404 (FPID 448785-1-52-01). The agreement modifies the scope of work to change a full depth foundation removal to a shallow depth removal to avoid damaging underground utilities and an adjacent fence. This results in a net contract decrease of $11,697.75 and no change to the contract time.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for Contract E53F1 Supplemental Agreement No. 03: Supplemental Agreement No. 03 for FDOT Contract E53F1, executed on 09/03/2026. This modification increases the contract price by $19,060.80 to add Pay Item 713-103-381 (Permanent Tape, Black, 10-30 Skip, 6 inch Wide for Concrete Surfaces) which was missing from the original contract. No additional contract time was granted.
PDF
PDF, High priority: read this firstaward
HighAI Summary for FDOT Contract E53F1 - SR 404 Resurfacing: Executed contract and funds approval between the Florida Department of Transportation (District 5) and Masci General Contractor, Inc. for the resurfacing of SR 404 from SR 5 to SR A1A. The contract total is $10,698,155.67, with a project duration of 210 calendar days. The agreement was executed on April 28, 2025.
PDF
PDF, High priority: read this firstaward
HighAI Summary for FDOT Contract E53F1 - SR 404 Resurfacing: Executed contract and funds approval document between the Florida Department of Transportation (District 5) and Masci General Contractor, Inc. for the resurfacing of SR 404 from SR 5 to SR A1A. The contract total is $10,698,155.67 with a performance period from June 9, 2025, to May 5, 2026.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDOT Contract E53F1 Work Order 05 - Plan Revision 06: Work Order No. 05 for FDOT Contract E53F1, dated October 7, 2026, issued to Masci General Contractor, Inc. The document amends the contract to incorporate Plan Revision 06 (prepared by Dewberry Engineers, Inc.) to connect a traffic signal cabinet on SR 513 to Brevard County's fiber network. The modification increases the contract price by $22,039.65, paid via Contingency Pay Item 0999 25, with no additional contract time granted.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDOT Contract E53F1 Work Order - Masci General Contractor, Inc: A Work Order for FDOT Contract E53F1 issued to Masci General Contractor, Inc. dated October 8, 2026. The document authorizes a contract price increase of $798.42 for the installation of an eye bolt for a traffic signal cabinet pad at the intersection of SR 404 & SR A1A, which was identified during a punch list inspection by Brevard County. No additional contract time was granted.
PDF
PDF, High priority: read this first37 pages · presolicitation
HighAI Summary for FDOT District 5 Bid Solicitation Notice - February 28, 2025: A bid solicitation notice from the Florida Department of Transportation (FDOT) District 5, dated February 28, 2025. It outlines the requirements for submitting bids via Bid Express by April 1, 2025, including digital ID requirements, prequalification standards for projects over $250,000, and protest rights under Florida Statutes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for FDOT Specifications Package - Contract E53F1: Specifications package dated January 17, 2025, for Florida Department of Transportation (FDOT) Contract E53F1 (FPID 448785-1-52-01) in District Five, Brevard County. Prepared by Dewberry Engineers Inc., the document modifies the FY 2024-25 Standard Specifications and includes special provisions covering scope of work, legal requirements, traffic control, and technical specifications for asphalt and traffic signaling equipment.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDOT Work Order - Contract E53F1 (Masci General Contractor, Inc): A Florida Department of Transportation (FDOT) Work Order for Contract E53F1 dated October 12, 2026. The document authorizes a contract price increase of $1,098.83 to compensate Masci General Contractor, Inc for additional work assisting Brevard County with troubleshooting Intelligent Transportation Systems (ITS) and Wrong Way Detection Systems (WWDS) connectivity issues, which were determined to be beyond the original scope of work.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDOT Work Order - Contract E53F1 (Masci General Contractor, Inc): A Florida Department of Transportation (FDOT) Work Order for Contract E53F1, dated October 13, 2026. The document authorizes a contract price increase of $11,714.03 to compensate Masci General Contractor, Inc for the removal and replacement of 275 linear feet of chain link fence within the median of SR 404, identified during a maintenance walk-through on September 18, 2026.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDOT Work Order - Contract E53F1 (Masci General Contractor, Inc): A Florida Department of Transportation (FDOT) Work Order for Contract E53F1, dated October 13, 2026. The document authorizes a contract price increase of $23,690.00 to compensate Masci General Contractor, Inc for the repair of four damaged drainage inlets along the project corridor (SR 404). No additional contract time was granted.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDOT Work Order E53F1 ICA 01 - Masci General Contractor, Inc.: A Florida Department of Transportation (FDOT) Work Order (E53F1 ICA 01) dated February 26, 2026, for Masci General Contractor, Inc. This modification increases the contract price by $7,575.58 to compensate the contractor for Florida Power & Light (FPL) invoices related to the installation of two transformers at SR 513 and South Tropical Trail. No additional contract time was granted.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDOT Work Order E53F1 ICA 02 - Masci General Contractor, Inc: A Florida Department of Transportation (FDOT) Work Order for Contract E53F1, executed by Masci General Contractor, Inc. This modification incorporates Plan Revision 05 (dated 1/6/26) to adjust the orientation and location of controller and UPS cabinets and relocate a pedestrian pole at the SR 404 & A1A Intersection per Brevard County requests. The agreement increases the contract price by $10,385.40 and grants two additional days of contract time.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDOT Work Order E53F1 ICA 03 - Masci General Contractor, Inc: Work Order for FDOT Contract E53F1, dated July 9, 2026, issued to Masci General Contractor, Inc. The modification increases the contract price by $2,310.51 to compensate the contractor for the repair of 75 LF of damaged guardrail on SR 404 near Sta. 152+00 caused by an unknown third party. No additional contract time was granted.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDOT Work Order E53F1 ICA 04 - Masci General Contractor, Inc: Florida Department of Transportation (FDOT) Work Order for Contract E53F1, executed October 13, 2026. This modification increases the contract price by $25,513.30 and grants three non-compensable days of additional time to compensate the contractor for removing and replacing concrete rip rap to install ITS conduit, resolving Notice of Intent (NOI) No. 03.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Supplemental Agreement E53F1 SA No. 04 - SR 404: Supplemental Agreement (SA No. 04) dated 10/16/2026 between the Florida Department of Transportation and Masci General Contractors, Inc. for project SR 404. The agreement increases the contract price by $34,330.92 and grants 36 non-compensable days of additional contract time. Adjustments are due to asphalt sampling delays (Issue 01) and FPL utility installation issues (Issue 02).
PDF
PDF, Low priorityother
LowAI Summary for CN-550000-E53F1-00040000: The document contains no substantive procurement information, stating only that all information must be from the source material.