This Solicitation opportunity from District of Columbia was posted on June 6, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

District of Columbia Power Line Undergrounding (DC Plug) Feeder 467

Closed
DCKA-2025-B-0085State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
Solicitation CP25014 is a unit price contract issued by the Port of Lake Charles (Lake Charles Harbor & Terminal District) for the Industrial Park East Rail Extension and Trans-loading Yard project located in Calcasieu Parish, Louisiana. The scope of work requires the contractor to provide all labor, materials, equipment, and supplies necessary to complete the project according to best industry practices and contract specifications. Key deliverables include mobilization, clearing and grubbing of 10 acres, drainage excavation, structural fill embankment, lime treatment of 37,000 square yards, and the installation of 602 linear feet of barbed wire fencing and double swinging driveway gates. The contract will be awarded to the lowest qualified bidder who complies with all requirements. Bidders must submit proposals by November 19, 2026, using the Louisiana Uniform Public Work Bid Form, ensuring every requested item has a unit price. The successful bidder must provide performance and payment bonds from an approved or A-rated Louisiana domiciled insurance company. Project administration includes a bi-monthly schedule update requirement and a retainage policy of 10 percent for contracts up to 500,000 dollars and 5 percent for those exceeding that amount. Compliance with the Clean Air Act, Federal Water Pollution Control Act, and Equal Opportunity clauses is required, with specific attention to FEMA assistance for subcontracts exceeding 150,000 dollars. Inspection and acceptance are managed by the Department, utilizing DOTD standards for earthwork and the International Roughness Index for concrete pavement.
Port of Lake Charles

POSTED

about 3 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

This contract involves civil construction work for the PEPCO feeder 467 project as part of the DC Power Line Undergrounding (DC PLUG) Program in Ward 3 of the District of Columbia. The scope includes removing existing roadway pavement, curb, gutter, and sidewalks to facilitate trench excavation, followed by installing PEPCO-provided materials such as conduits, precast manholes, and transformer enclosures. The work also encompasses the installation of ductbank encasements with pea gravel and thermal fill, as well as constructing cast-in-place manholes with reinforced concrete. Excavation, backfilling, and both temporary and permanent restoration of utility cuts are required, along with pavement profiling, overlay, and the replacement of curb, gutter, and sidewalks in-kind. Additional responsibilities include implementing erosion and sediment control measures, dust control during construction activities, and maintaining vehicular, bicycle, and pedestrian traffic according to DDOT standards. The contractor must ensure access to local businesses and residences, maintain utility services during construction, and protect all utility structures within and adjacent to the project limits from damage. The work involves disposal of unsalvageable materials and all incidentals necessary for a complete project, with no separate payment for utility protection costs, which are incorporated into the overall contract. The project aims to deliver a fully restored and upgraded roadway and utility infrastructure within a budget range of five to fifteen million dollars, with the solicitation posted by the District of Columbia Department of Transportation.

General Info

Agency

District of Columbia → D.C. Department of Transportation

Place of Performance

DC, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDistrict of Columbia → D.C. Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
District of Columbia → D.C. Department of Transportation
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Work under this Contract consists of the civil construction for PEPCO feeder 467 of the DC Power Line Undergrounding (DC PLUG) Program, located in Ward 3 and bound by 39th St NW, Broad Branch Rd NW, Nebraska Ave NW, and Oliver St NW as shown on the contract plans, indicated in the specifications / Special Provisions (J.8), as directed by the Contract Administrator. The specifications in this document and related Contract Drawings cover the work which includes, but is not limited to the following: The removal and disposal of existing roadway pavement, curb, gutter, and sidewalks to the extents shown on plans or as necessary for access to trench excavation. The installation of PEPCO supplied materials such as PVC and fiberglass conduits, precast manholes, precast tapholes, precast transformer enclosures, and other related items and components. The furnishing and installation of pea gravel concrete for ductbank encasement. The furnishing and installation of thermal fill for ductbank encasement at transmission feeder crossings. The furnishing and installation of concrete and reinforcing steel for cast-in-place manhole construction. Excavation and backfilling of all utility cuts. Temporary restoration of all utility cuts. Permanent restoration of all utility cuts. Restoration of all pavement markings disturbed by the utility cut and pavement restoration work. Upgrade crosswalks to the high visibility type at all intersections within the project limits. Pavement profiling (milling) and overlay (approximately 2 inches) of utility cuts and per plan in accordance with DDOT standards. Installation of topsoil, seed, and mulch on all disturbed earth and grass areas. Installation of replacement curb (in-kind), curb and gutter (in-kind), and sidewalk (in-kind) sections. The installation and use of erosion and sediment control measures meeting DDOT/DOEE standards and per plan. Dust control during pavement saw cutting and excavation operations. Mobilization and demobilization, completion of field layout, provision and maintenance of engineer's field facilities, progress photographs, and rodent control. Maintain vehicular, bicycle and pedestrian traffic per DDOT Standard Specifications Section 612 and Attachment J.14 or as directed by the Contract Administrator. Maintain access to residential, institutional and commercial establishments using appropriate means as approved by the Contract Administrator. Maintain service of all existing utilities during construction. Work includes the disposal of all unsalvageable materials and all labor, materials, tools, equipment and incidentals necessary to obtain a complete and finished product. The Contractor shall be fully responsible for protection against damages for the duration of the Contract of all the utility structures within the Contract limits and adjacent thereto. The utilities include but are not limited to public and/or private water, sewer, electricity, gas and communications lines. No separate measurement or payment will be made. Cost of this protective work shall be reflected and distributed among the Contract pay items. Work also includes all incidentals needed to complete the project as shown on the Contract Drawings and within the Special Provisions

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS