Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Colorado was posted on April 18, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

District Shops (DS) Hoist Replacement (15% DBE Goal)

Closed
RFP-125FJ003State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 26, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. To secure project financing, bidders must strictly adhere to Disadvantaged Business Enterprise requirements that expand upon State Water Resources Control Board standards. Central to this is the demonstration of six Good Faith Efforts (GFE). Specifically, proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of utilizing the Small Business Administration and Minority Business Development Agency, must be submitted with the bid package. Failure to provide these specific GFEs by the opening date will result in the bid being deemed non-responsive. Documentation regarding DBE outreach may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

39 minutes ago

DEADLINE

in 8 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and sitework. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business entities. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

39 minutes ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract for multi-floor water damage restoration at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge and requires the restoration of the first, second, and third floors to their original condition. The scope of work includes drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, and electrical repairs along with vanity and cabinet replacement. The total period of performance is 105 days, with substantial completion expected within 90 days and final completion within an additional 15 days. This is an SBA set-aside solicitation open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. Award will be based on best value, evaluated across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required documentation includes a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and wage rate certifications. The contract is subject to the Davis-Bacon Act, requiring a minimum wage of 13.65 per hour and specific paid sick leave accruals. Contractors must comply with NFPA-101 Life Safety Code, OSHA, EPA, and ADA regulations, with Massachusetts state laws prevailing if more stringent. Insurance requirements include automobile liability coverage of 200,000 per person and 500,000 per occurrence, naming Adams and Associates, Inc. as an additional insured. Workmanship is guaranteed for one year, with a two-year manufacturer warranty required for any roofing work. Payment terms are Net 30.
Grafton Job Corps

POSTED

39 minutes ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
The P1102 Weapons Magazine and Ordnance Operations Facility project at Naval Submarine Base New London in Groton, Connecticut, is a comprehensive construction effort with a duration of 1828 calendar days. The scope involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine, along with a new Ordnance Operations building, Truck Inspection area, and Sentry building. Key technical requirements include the installation of overhead cranes, intrusion detection systems, grounding and lightning protection, and specialized foundation work utilizing rigid inclusions and load transfer mats. The project also necessitates the demolition of 18 existing magazines and two buildings, as well as extensive sitework involving rock excavation, grading, and wetland mitigation. Comprehensive infrastructure improvements are required, including primary and secondary electrical distribution, telecommunications, outside lighting, access roads, and paved loading areas. Bidding is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB, under NAICS code 236220. Interested parties must coordinate with J & J Contractors, Inc. to obtain bid invites and access necessary documentation before the response deadline of October 31, 2026.
J & J Contractors, Inc

POSTED

39 minutes ago

DEADLINE

in 4 days
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for comprehensive interior modernization. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms by replacing vanities and lavatories, and updating interior surfaces with new paint and signage. Technical upgrades involve installing raised flooring and electrical distribution to support classroom needs, implementing simple dimming lighting controls, replacing lamps, ballasts, and ceiling fans, and replacing variable air volume systems to correct HVAC and plumbing deficiencies. The project also encompasses associated work for Buildings 261 and 263, with specific performance periods of 240 days for the base requirement and option. The overall period of performance is from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using the best suited negotiate methodology, evaluating price, past performance from the last five years, and corporate relevant experience. Contractors must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict security, safety, and accessibility standards, including ADA and seismic-resisting system requirements. Proposals must be submitted electronically to the Contracting Officer by November 9, 2026, and must include a detailed bid schedule in Excel and technical documentation in PDF format.
Bristol Alliance of Companies

POSTED

40 minutes ago

DEADLINE

in 14 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical infrastructure upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project requires hazardous materials abatement and site improvements, including paving, drainage upgrades, and repairs to water, sanitary, and storm systems. The contract is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. Award will be based on the lowest price for two primary exhibit line items: building renovation and paving removal and replacement. Bidders must adhere to strict quality control frameworks, including a three-phase control system and specific ASTM testing standards. Administrative requirements include monthly invoicing via Wide Area Work Flow and compliance with the Davis-Bacon Act. Bonding requirements are tiered by proposal value, with projects over 150 thousand dollars requiring bid, payment, and performance bonds. All work must comply with ADA accessibility guidelines and specific cybersecurity standards for facility-related control systems.
Bristol Alliance of Companies

POSTED

40 minutes ago

DEADLINE

in 28 days

AI Contract Overview

Show more

This contract involves a Request for Proposal to upgrade the hydraulic bus hoist system at the RTD District Shops Division building in Colorado. The project entails replacing eight existing in-ground hydraulic hoists, repairing two additional hoists, and removing one hoist, with the goal of enhancing maintenance capabilities and safety standards. The procurement aims to meet a 15% Disadvantaged Business Enterprise (DBE) participation goal, emphasizing inclusivity in the contracting process. The project is estimated to be valued between one million and three million dollars, reflecting its scope and complexity. The solicitation was issued on April 18, 2025, with a deadline for responses set for May 19, 2025. The project is managed by the Colorado Capital Programs-Engineering office, and interested contractors can contact Bethany Swank via email or phone for further details. The procurement process is accessible online through the provided portal link, allowing potential bidders to review project specifics and submit proposals accordingly.

General Info

Agency

Colorado → Capital Programs-Engineering

Place of Performance

CO, USA

Set-Aside

NONE

Documents

5

125FJ003 - District Shops Hoist Replacement SOW

PDF, High priority: read this firstsow
High

RFP-125FJ003 District Shops (DS) Hoist Replacement

PDF, High priority: read this firstrfp
High

RFP 125FJ003 - District Shops (DS) Hoist Replacement Form of the Contract

PDF, High priority: read this firstcontract-document
High

WO #05 - District Shops Hoist Replacement Project Manual

PDF, High priority: read this firstspecifications
High

125FJ003_-_DS_Hoist_Replacement_-_Drawings.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → Capital Programs-Engineering
Contacts1 person available
OfficeN/A
Organization / Agency
Colorado → Capital Programs-Engineering
Office AddressN/A

Full Description

Show more
This is a Request for Proposal to renovate 11 in-ground hydraulic bus hoists at the RTD District Shops Division building. This includes replacement of 8 hoists, repair of 2 hoists and the removal of 1 hoist.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS