This Solicitation opportunity from Michigan was posted on January 26, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract pertains to the district-wide upgrade of door hardware, including door closers, escutcheons, eyes, hangers, holders, and overhead door components, for the West Bloomfield School District in Michigan. The solicitation was posted on January 26, 2024, with a response deadline set for February 23, 2024. The project is part of a rebid process under solicitation number 240000001056 and is managed by the Michigan Department of State Police (SLED). The contract falls under NAICS code 423710, which covers hardware and related products, indicating a focus on procurement of door hardware supplies and services. The specific financial scope of the contract has not been disclosed, and there are no set-aside restrictions noted. Interested vendors can access additional details and submit responses through the provided online portal.
HighAI Summary for 23043F Scotch Elementary Door Hardware Upgrades Demolition and Floor Plans: This document contains construction drawings for the Scotch Elementary Door Hardware Upgrades project for West Bloomfield Schools, MI. It includes demolition plans for Zone 'A' and floor plans for Zone 'C'. The drawings are part of project number 23043F, with issue dates of August 31, 2023, and January 22, 2024. The document is intended for construction use and includes architectural details necessary for the upgrade work.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for District-Wide Door Hardware Upgrades Project Manual - Rebid 23043: This document is the Project Manual for the District-Wide Door Hardware Upgrades project for the West Bloomfield School District, dated January 22, 2024, issued for construction documents - rebid. It includes procurement and contracting requirements, general and facility construction specifications, and detailed sections such as advertisement for bids, instructions to bidders, bid forms, general and supplementary conditions, wage rate requirements, and a list of drawings. The manual outlines bid submission instructions, bonding requirements, and pre-bid conference details, providing comprehensive guidance for bidders and contractors.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 2024.1 District-Wide Door Hardware Upgrades Rebid: This document is a Request For Bids (RFB) issued by West Bloomfield School District for district-wide door hardware upgrades, identified as RFB# 2024.1, dated January 26, 2024. It outlines the purpose of the RFB, the timeline including a pre-bid conference on February 19, 2024, and the bid submission deadline of February 23, 2024. The document details bid submission requirements, including sealed bid delivery instructions, bid bond requirements, and bidder qualifications. It also references specifications for the product in Attachment A and emphasizes the intent to encourage competition by allowing equivalent product substitutions. The RFB includes provisions for addenda, bid irrevocability, and finality of the School District's decision.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for West Bloomfield Middle School Door Hardware Upgrades Construction Drawings Part 6: This document contains construction drawings for the West Bloomfield Middle School Door Hardware Upgrades project. It includes detailed floor plans for various zones (D, F, B) on the first and second levels, issued as construction documents on 01-22-2024 and 09-31-2023. The drawings are prepared by TMP Architecture Inc. and include registration seals, project numbers (23043B), and drawing numbers (A1.1D, A1.1F, A1.2B, A1.2F). The document serves as technical specifications for the hardware upgrade project, providing critical architectural details necessary for construction and procurement.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for West Bloomfield Schools Door Hardware Upgrades Architectural Drawings Part 5: This document contains architectural drawings for the West Bloomfield Schools Door Hardware Upgrades project, specifically focusing on first level floor plans for zones 'L' and 'B'. The drawings are issued by TMP Architecture Inc. and include detailed floor plans with scales and issue dates. The project numbers referenced are 23043A and 23043B, with drawing numbers A1.1L and A1.1B respectively. The document serves as construction documentation for the upgrades, providing essential architectural specifications for the project as of January 22, 2024.
PDF
PDF, Low priorityother
LowAI Summary for 23043_240122_CD_All Bldgs_Drawings_Part8: The document titled '23043_240122_CD_All Bldgs_Drawings_Part8.pdf' appears to be a part of a set of construction drawings or plans for all buildings, indicated by the filename. However, the content provided is empty or unreadable, with no visible text or data to analyze. Therefore, no specific details about the purpose, version, or key content can be determined from the provided information.
PDF
PDF, Low priorityspecifications
LowAI Summary for 23043_240122_CD_All Bldgs_Drawings_Part9 Composite Floor Plan: This document is part 9 of a set of construction drawings for the West Bloomfield Schools project titled 'Scotch Elementary Door Hardware Upgrades.' It includes a composite floor plan prepared by TMP Architecture Inc., located in Bloomfield, MI. The document contains architectural drawings relevant to the project but does not include solicitation or contract details.
PDF
PDF, Low priorityother
LowAI Summary for 23043_240122_CD All Buildings Drawings Part 1: Document titled '23043_240122_CD All Buildings Drawings Part 1' appears to be a set of drawings for all buildings, part 1. No readable content or detailed information is provided in the document content, making it impossible to determine specific procurement details or purpose.
PDF
PDF, Low priorityother
LowAI Summary for 23043_240122_CD All Buildings Drawings Part 2: Document titled '23043_240122_CD All Buildings Drawings Part 2' appears to be a set of construction drawings or plans for all buildings, part 2. No readable content or detailed information is provided in the document content, so the exact purpose and details cannot be determined.
PDF
PDF, Low priorityother
LowAI Summary for 23043_240122_CD All Buildings Drawings Part 3: This document appears to be part 3 of construction drawings for all buildings related to project 23043 dated 240122. The content is not provided or is unreadable, so no further details can be extracted.
PDF
PDF, Low priorityspecifications
LowAI Summary for First Level Floor Plan - Zone G Drawings Part 4: This document contains architectural drawings titled 'First Level Floor Plan - Zone G'. It appears to be part 4 of a series of drawings for all buildings, as indicated by the original filename '23043_240122_CD_All Bldgs_Drawings_Part4.pdf'. The document includes floor plan details for Zone G at the first level, but no issue dates or additional specifications are provided in the content.
PDF
PDF, Low prioritydrawings
LowAI Summary for Project 23043D Architectural Drawings Part 7: This document is part 7 of the architectural drawings for project number 23043D. It includes various architectural details and layouts prepared by TMP Architecture Inc. The document contains multiple pages with tables and issue dates, but no specific solicitation or contract information is provided. The drawing number referenced is AC.1.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.