Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Districtwide Security Enhancements

Active
20260715052State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves comprehensive security enhancements across three Alameda-Contra Costa Transit District facilities—CMF, D2, and D4—with work encompassing the full replacement and upgrade of badge access control systems, removal and installation of new security camera systems, door and hardware replacements, and rekeying all facilities to the Primus Master Key system. All work is governed by technical specifications aligned with Division 01 through 48 of the MasterFormat and must comply with applicable industry standards including NEMA, UL, ANSI, ASTM, and NFPA, along with the 2009 Green Book and NETA acceptance testing protocols. Deliverables require full operational systems, validated through on-site inspection and acceptance by the District’s Designated District Representative, with Substantial Completion defined as the point at which facilities are safely operable for intended use. The project is structured in three phases, with Phase 3 at D4 designated as an add-alternate that the District may exercise post-award through change orders. The procurement follows a Lowest Price Technically Acceptable (LPTA) model, with award determined by the lowest responsive bid price adjusted to include allowance items such as permits, unforeseen conditions, and district-specified equipment. Bidders must demonstrate technical compliance, financial stability, and past performance, with no weighted scoring or trade-off evaluation used. All proposals must be submitted electronically as PDFs via the District’s Procurement Supplier Portal by September 16, 2026, following the specific naming convention and format requirements. The contract requires adherence to stringent packaging and preservation standards, ensuring products remain undamaged and labeled according to manufacturer instructions during transport and storage. Special requirements include compliance with prevailing wage laws, DBE participation mandates, non-discrimination provisions under Title VI and 49 C.F.R. Part 26, and a 30-day advance notice for insurance cancellation. Key personnel must be submitted prior to work commencement, and organizational conflicts of interest must be disclosed with restrictions on former District employees representing bidders for 12 months post-employment. The period of performance spans up to 540 calendar days from the Notice to Proceed, with all work performed at the Oakland, CA site. No formal FAR clauses are incorporated, and while accounting data and payment office details are omitted, invoice submissions must be in electronic PDF format and processed per Section 00 62 76.

General Info

Upgrade security systems at CMF, D2, D4 facilities with new access control, cameras, doors, and Primus keying.

Agency

California → Alameda-Contra Costa Transit DistrictView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Oakland, CA, 94603, USA

Set-Aside

NONE

Documents

(8)

P2218 CMF Security Plans Issued for Bid 2025-10-30

PDFrfp

IFB 2027-1711 Districtwide Security Enhancements

PDFifb

P2218 - D2 Emeryville Maintenance Facility Security Camera Enhancement Project - Issue for Bid 2025-12-12

PDFsow

IFB 2027-1711 Districtwide Security Enhancements General Requirements

PDFifb

P2218 - D2 Security Plans Issued for Bid 2025-12-12

PDFsow

P2218 - D4 Security Plans Issued for Bid 2025-12-03

PDFrfp

2027-1711 Districtwide Security Enhancements IFB Addendum 1

PDFamendment

P2218 Security Technical Specification for Metal Doors and Frames

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Alameda-Contra Costa Transit District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Alameda-Contra Costa Transit District
View Agency Profile
Office AddressN/A
Contacts
Dora EnglishContracts Specialist

Full Description

Show more
Bid #2027-1711: The project involves the implementation of safety and security enhancements at three Alameda-Contra Costa Transit District facilities (CMF, D2, and D4). The scope of work includes upgrading all badge access control systems and associated equipment, removing existing security cameras and installing new camera systems, replacing designated doors and hardware, and rekeying the facilities to the Primus Master Key system.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
MAIN GROUNDING ELECTRODE
Solicitation # main-grounding-electrode
The Woodland Job Corps Center, operated by Adams and Associates, Inc. for the US Department of Labor, is soliciting a single lump sum contract for a licensed electrical contractor to inspect and repair grounding systems at multiple campus buildings in Laurel, Maryland. The scope of work includes the Aspen Dorm, Vocational Building, Willow Hall, Holly Dorm, Maple Dorm, and Oak Dorm, as well as the Administration Building. Technical requirements specify the installation of #2/0 awg conductors from underground copper water pipes, 16x2 inch ground bars, two 8-foot ground rods with 6-foot separation, and the use of 3/4 inch EMT conduit. All work must adhere to NEC 2023, 250, as well as EPA, OSHA, and Maryland state regulations. Proposals are due by September 3, 2026, and must be submitted on company letterhead to Purchasing Manager Audrey Davis. Bidders must provide a detailed cost breakdown for labor, materials, and equipment, along with a valid Maryland Contractor's License, insurance certificates, and a 90-day bid guarantee. Award selection is based on best value, weighted by price (60%), quality (20%), past performance (10%), and schedule (10%). The successful contractor must start work within 14 days of the Notice to Proceed and provide a one-year workmanship guarantee. Payment terms are Net 30, and final payment is contingent upon the delivery of a completed SF 1413, release of liens, and surety of final payment.
Adams & Associates\ Woodland Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 17 days
View Details
NAICS: 238210
New
PANELBOARDS
Solicitation # WL – 26 -0004
This solicitation, identified as Scope of Work ID WL-26-0004, is for electrical repairs and labeling of panelboards at the Woodland Job Corps Center in Maryland, operated by Adams and Associates, Inc. for the US Department of Labor. The project requires the provision of non-handwritten circuit directories for Buildings E, F, G, K, and M, the installation of UL listed red mark labels and updated panel schedules for the fire alarm control panel at the Oak Dormitory, and the reinstallation of a panel cover in the welcome center mechanical room. All work must comply with NEC 2023, OSHA, EPA, and applicable state and local codes. The performance period is scheduled from May 11, 2026, through December 31, 2026. The contract will be awarded as a single lump sum based on a best-value determination considering both quality and price. Bidders must attend a mandatory bid conference and submit typed proposals on company letterhead by September 3, 2026, including a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Maryland Contractor's License. Requirements include specific insurance coverages for general liability, automobile liability, and workers' compensation, as well as certification of compliance with Service Contract Labor Standards. Final payment is contingent upon the submission of certified payroll records, a completed SF 1413, and the release of liens from all subcontractors and suppliers.
Adams & Associates\ Woodland Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 18 days
View Details
NAICS: 238210
New
Electrical Repair Services
Solicitation # Electrical Services 8-2026
The Management and Training Corporation (MTC), acting for the U.S. Department of Labor, is soliciting bids for a fixed-price, single lump sum contract to provide various electrical repair services at the Centennial Job Corps Center in Nampa, Idaho. This opportunity is set aside for small businesses and various socio-economic categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested bidders must attend a pre-bid meeting on August 21, 2026, and submit their proposals via email to Sandra Clore by August 31, 2026, at 3:00pm MST. The scope of work includes all electrical services detailed in the Construction Bid Package, requiring the contractor to manage all building permits, incidental work per building codes, and provide a one-year written guarantee of workmanship. The contract mandates strict adherence to Construction Wage Rate Requirements (formerly Davis-Bacon Act) and requires weekly certified payroll. For bids equal to or exceeding $25,000, a bid bond of 20% is required, as well as performance and payment bonds from a surety with at least an A- rating. Bidders must provide a comprehensive cost breakout on company letterhead, itemizing materials, labor, equipment, and overhead. Payment will be made via progress payments using AIA G702 and G703 forms, contingent upon the submission of a Schedule of Values and the acceptance of work by MTC or the Government. Additionally, the contractor must comply with rigorous information security and privacy training requirements, with liability for data breaches including the cost of credit monitoring for affected individuals.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 15 days
View Details