This Solicitation opportunity from Ohio was posted on June 25, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Division of Natural Areas & Preserves Integrated Prioritization System for Upper Scioto River Watershed and Big Darby Creek Freshwater Mussel Survey
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves the development of an Integrated Prioritization System (IPS) and a comprehensive freshwater mussel survey within the Big Darby Creek watershed, managed by the Ohio Department of Natural Resources' Division of Natural Areas & Preserves. The IPS aims to create a modeling and assessment framework that consolidates extensive water quality, biological, habitat, land use, and pollution data collected over four decades to evaluate and predict the impacts of various stressors on aquatic ecosystems. The system will establish effect thresholds for different species, including freshwater mussels, fish, and macroinvertebrates, stratified by stream size, and will be stored in a relational database for regional water management use. The project also includes conducting a mussel survey at 100 sites previously studied in the 1980s and 1990s, with the goal of analyzing trends and integrating findings into the IPS to support conservation efforts, especially given the presence of rare and endangered species threatened by urban development and increased water resource demands. The work is structured into two phases over two years, with the first phase focusing on data aggregation, threshold development, and initial mussel surveys, and the second phase utilizing the results to identify priorities for water protection, creating ranking and restorability factors, and developing an interactive dashboard for data visualization. The contract emphasizes the importance of prior experience in establishing IPS frameworks and conducting mussel surveys, with proposals capped at $125,000 per phase, and deadlines set for June 30, 2025, and June 30, 2026. Contractors must adhere to specific legal and compliance requirements, including signing acknowledgment forms related to independent contracting, affirming understanding of state policies on offshore services and data location restrictions, and submitting detailed proposals demonstrating relevant expertise. The overarching goal is to provide a scientifically robust, regionally applicable tool to guide conservation and development decisions, ensuring the protection of high-quality waters and the recovery of impaired streams within the watershed.
General Info
Place of Performance
OH, USASet-Aside
Documents
5AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- RFP OP-32095-AS (Supply of Multi Gas Detector at PSO Habibabad Depot)Open now, due in 6 days
- THERMOMETER, SELF-INDICOpen now, due in 2 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Store the IPS effect thresholds in a relational database to be accessed by various statistical packages and present in a spreadsheet format. Make data available for use in regional water assessments as guidelines for protecting high quality waters and serving as restoration targets for impaired waters.
Mussel Survey: Conduct a comprehensive mussel survey for the Big Darby Creek watershed for 100 sites previously surveyed by Dr. G. Thomas Watters, PhD. of the Ohio State University and published in in 1986, 1990 and 1996. Work with the Ohio Department of Natural Resources, DNAP and other local mussel experts to finalize a study plan and protocol to ensure that site locations, methods and survey efforts are comparable to these previous surveys. The contractor shall possess appropriate credentials to conduct surveys in Ohio Mussel Survey Protocol Group 2 and 4 streams. Provide survey data collection within the Ohio State Mussel Survey Protocol 2024 season for IPS analysis. In order to complete mussel survey work within the limits of the mussel field season in 2024, the contractor shall contact ODNR immediately upon contract finalization to develop the study plan. The study plan shall be completed no later than 7/30/2024 and survey work should commence no later than 8/1/2024.
PHASE 2 – SFY 2026 (7/1/2025 – 6/30/2026) IPS Once Phase 1 is completed, the results will be used to develop additional factors in the Big Darby Creek watershed that can be used to determine priorities for water resource protection and pollution abatement actions and to predict the outcomes of future development, particularly for high quality streams, rivers, and watersheds. For impaired sites, produce a Restorability factor as defined in prior IPS frameworks. For high quality sites, produces a Susceptibility and Threat ranking that can be used to predict impacts from new or expanding stressors such as urbanization. Develop these factors at the site, reach, and HUC12 watershed scales.
Develop an electronic dashboard in Power BI (or equivalent program) for presentation of results via maps, tables, and interactive applications that can be accessed by diverse users. Users should be able to access and export data at site, reach and subwatershed levels.
Mussel Survey: Should surveys of all 100 sites not be completed during the Ohio Mussel Survey Protocol season in SFY 2025, survey work should continue in SFY 2026. Provide all survey data for IPS analysis to allow for development of stressor thresholds as targets for freshwater mussel conservation. Conduct trend analysis comparing results to previous surveys. Present final data and trend analysis in a report.
Note: The IPS approach is NOT the same or a replacement for Total Maximum Daily Loads (TMDLs) and the affiliated watershed models. While typical watershed models address only a few chemical variables focused only on impaired sites, the IPS will address both impairments for restoration and threats to high quality attaining sites utilizing dozens of chemical, habitat, hydrological, and land use variables.Prior Experience.The successful bidder will both describe and provide examples of how they meet minimum requirements for prior experience: Completion of at least two previous IPS frameworks with effect thresholds and databases to be utilized by watershed stakeholders. Submit this information via links to online documentation or in report format for review. Description of at least two previous mussel surveys and final reports. Submit reports via link or upload for review.
Budget. Proposals are not to exceed $125,000 per phase for a total of $250,000.Completion Dates.The deadline for phase 1 work is June 30, 2025.The deadline for phase 2 work is June 30, 2026.Delivery. ODNR – Division of Natural Areas & Preservesc/o Heather Doherty2045 Morse Road, H-3Columbus OH 43085Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State.Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive.
More opportunities from Ohio Department of Natural Resources
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
