Dolly Copp Campground Water and Electric Project

Active
AG-1484-S-15-0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves the renovation of water and electrical utilities at Dolly Copp Campground located in the White Mountain National Forest, with an estimated project value between $1 million and $5 million. It is a 100% small business set-aside acquisition with a size standard of $36.5 million. The project encompasses extensive work on the water system, including installation of sand separators in primary wells, replacement and abandonment of existing water supply piping, modifications to the existing water storage tank, and installation of a new water distribution system to serve the campground and future building sites. The electrical scope involves the installation of new underground primary power and telephone conduits, new electrical distribution structures, protection and coordination of existing utilities, and ensuring all work complies with utility standards. The contractor is responsible for careful coordination with utility companies, adherence to Dig Safe procedures, and securing all necessary permits and inspections to complete the installations fully operational. Solicitation documents containing detailed plans and specifications were scheduled to be posted around mid-May 2015, with proposals due by mid-June 2015. A site visit will also be arranged with specific details provided in the solicitation. The contractor must ensure no damage to existing transmission lines occurs, with repairs at their expense if damaged. Final positioning of equipment such as transformer bases, utility pedestals, and RV power distribution posts must be coordinated in the field with the Contracting Officer and utility companies before installation. The overall work requires careful project planning and execution to meet all federal, state, and local requirements, ensuring the successful upgrade of essential utilities to serve the campground and future development sites.

General Info

Renovation of water and electrical utilities at Dolly Copp Campground, $1-5 million, small business set-aside.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Androscoggin Ranger District/Dolly Copp Campground, NH, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Allegheny National Forest
Contacts1 person available
OfficeWARREN, PA, 16365, USA
Office AddressWARREN, PA, 16365, USA
Contacts
Alan J. ZeroContracting Officer

Full Description

Show more
Magnitude of this project is between $1 million and $5 million. This project is a 100% set-aside for small businesses. The size standard for this acquisition is $36.5 million Solicitation documents including plans and specifications will be posted on or about May 15th, 2015. Proposals will be be due on June 17th, 2015 @ 2:00 pm EST. Site visit will be scheduled - date/time/location will be included in the posed solicitation documents. Work of the Project includes renovation of water and electrical utilities at Dolly Copp Campground, White Mountain National Forest. Without limiting the full scope of work required for the project, the following listing is provided to identify the major work items involved: 1. Water: a. Installation of sand separators in both primary wells. b. Installation of new water supply piping from primary wells to storage tank as indicated on drawings including pipe, fittings, valves, meters, testing and disinfecting. Existing water supply system to be abandoned. c. Modifications to existing water storage tank including new water supply connection, new water distribution system connection, new access hatch, internal piping modifications, internal surface coating, testing and disinfecting. d. Installation of new water distribution system from storage tank to site as indicated on drawings including pipe, tubing, fittings, valves, curb stops, faucets, RV hook-ups, services to existing buildings, stubs to future buildings, testing and disinfecting. Existing water distribution system to be abandoned where replaced with new. 2. 2. Electrical: a. Provision of new underground primary power conduits with pull cords, bases for primary power sector cabinets, concrete bases for utility pad mounted transformers, any required primary power in ground pull boxes, bollards at primary power sector cabinet locations and at pad transformer locations, and primary power conduits through horizontal bore, all per the serving utility's standards. b. Provision of new underground telephone conduits with pull cords, any bases required for telephone pedestals, any required in ground pull boxes, and telephone conduits through horizontal bore, all per the serving utility's standards. c. Provision of new underground telephone service conduits with pull cords from new pedestals to within 5 feet of buildings indicated to receive future services and with risers capped at buildings specifically noted in the Scope of Work. d. Provision of new electrical distribution structures complete with meter bases/sockets and blank covers, to utility standards where noted in the Scope of Work and as detailed on Contract Drawings. e. Provision of new underground conduits with NO wiring between new pad transformers and new electrical distribution structures, and/or to within 5 feet of indicated existing and/or new buildings, and any other structure indicated on Contract Drawings. f. Provision of new underground conduits with pull cords from within 5 feet of electrical distribution structures and to within 5 feet of future and existing toilet buildings. g. Provision of all conduits to distribute power from within 5 feet of the electrical distribution structures and to within 5 feet of the recreational vehicle sites future RV power distribution "hitching post", and between RV power "hitching posts" noted on the Contract Drawings. h. Protection of existing control conduit and wiring between existing Well House at Well #2 and existing reservoir and Well #2 building while new water line is installed. It is intended that the existing conduit and wire shall remain in service for control of the wells when this project is completed. i. Coordination with the serving utility companies (power and telephone) and other Contractors involved with other aspects of the overall project. j. The Contractor shall plan and execute his work in a manner that does NOT remove and/or damage any existing overhead and/or underground telephone and/or power infrastructure. All existing lines shall be repaired or replaced by the Contractor at no added cost to the Owner or other parties if they are damaged during construction. Any damage to lines owned and maintained by the serving utilities will be repaired by the utilities if damaged, with the costs paid by the Contractor at his expense. Utilize Dig Safe procedures prior to any excavation as existing lines indicated on Contract Drawings are known to be of questionable accuracy and may not indicate all installations presently in operation and to be maintained. k. Field coordinate final positions of all transformer bases, sector cabinet bases, telephone pedestals, bollards, and similar items with the Utilities and Contracting Officer. l. Field coordinate final positions of future RV power distribution "hitching posts" and electrical distribution structures with the Contracting Officer before starting installations of associated equipment and conduits. m. Obtain all permits and approvals required, including final inspections and/or progress inspections by any representatives of the serving utilities and any local, state, or federal agency involved with the project so as to leave the facility installations completed and operational in accordance with the intent of the Contract Documents.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 8 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 9 hours ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS