Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Dolly Copp Campground Water and Electric Project

Active
AG-1484-S-15-0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves the renovation of water and electrical utilities at Dolly Copp Campground located in the White Mountain National Forest, with an estimated project value between $1 million and $5 million. It is a 100% small business set-aside acquisition with a size standard of $36.5 million. The project encompasses extensive work on the water system, including installation of sand separators in primary wells, replacement and abandonment of existing water supply piping, modifications to the existing water storage tank, and installation of a new water distribution system to serve the campground and future building sites. The electrical scope involves the installation of new underground primary power and telephone conduits, new electrical distribution structures, protection and coordination of existing utilities, and ensuring all work complies with utility standards. The contractor is responsible for careful coordination with utility companies, adherence to Dig Safe procedures, and securing all necessary permits and inspections to complete the installations fully operational. Solicitation documents containing detailed plans and specifications were scheduled to be posted around mid-May 2015, with proposals due by mid-June 2015. A site visit will also be arranged with specific details provided in the solicitation. The contractor must ensure no damage to existing transmission lines occurs, with repairs at their expense if damaged. Final positioning of equipment such as transformer bases, utility pedestals, and RV power distribution posts must be coordinated in the field with the Contracting Officer and utility companies before installation. The overall work requires careful project planning and execution to meet all federal, state, and local requirements, ensuring the successful upgrade of essential utilities to serve the campground and future development sites.

General Info

Renovation of water and electrical utilities at Dolly Copp Campground, $1-5 million, small business set-aside.

Agency

Department Of Agriculture → Allegheny National ForestView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Androscoggin Ranger District/Dolly Copp Campground, NH, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Allegheny National Forest
Contacts1 person available
OfficeWARREN, PA, 16365, USA
Organization / Agency
Department Of Agriculture → Allegheny National Forest
View Agency Profile
Office AddressWARREN, PA, 16365, USA
Contacts
Alan J. ZeroContracting Officer

Full Description

Show more
Magnitude of this project is between $1 million and $5 million. This project is a 100% set-aside for small businesses. The size standard for this acquisition is $36.5 million Solicitation documents including plans and specifications will be posted on or about May 15th, 2015. Proposals will be be due on June 17th, 2015 @ 2:00 pm EST. Site visit will be scheduled - date/time/location will be included in the posed solicitation documents. Work of the Project includes renovation of water and electrical utilities at Dolly Copp Campground, White Mountain National Forest. Without limiting the full scope of work required for the project, the following listing is provided to identify the major work items involved: 1. Water: a. Installation of sand separators in both primary wells. b. Installation of new water supply piping from primary wells to storage tank as indicated on drawings including pipe, fittings, valves, meters, testing and disinfecting. Existing water supply system to be abandoned. c. Modifications to existing water storage tank including new water supply connection, new water distribution system connection, new access hatch, internal piping modifications, internal surface coating, testing and disinfecting. d. Installation of new water distribution system from storage tank to site as indicated on drawings including pipe, tubing, fittings, valves, curb stops, faucets, RV hook-ups, services to existing buildings, stubs to future buildings, testing and disinfecting. Existing water distribution system to be abandoned where replaced with new. 2. 2. Electrical: a. Provision of new underground primary power conduits with pull cords, bases for primary power sector cabinets, concrete bases for utility pad mounted transformers, any required primary power in ground pull boxes, bollards at primary power sector cabinet locations and at pad transformer locations, and primary power conduits through horizontal bore, all per the serving utility's standards. b. Provision of new underground telephone conduits with pull cords, any bases required for telephone pedestals, any required in ground pull boxes, and telephone conduits through horizontal bore, all per the serving utility's standards. c. Provision of new underground telephone service conduits with pull cords from new pedestals to within 5 feet of buildings indicated to receive future services and with risers capped at buildings specifically noted in the Scope of Work. d. Provision of new electrical distribution structures complete with meter bases/sockets and blank covers, to utility standards where noted in the Scope of Work and as detailed on Contract Drawings. e. Provision of new underground conduits with NO wiring between new pad transformers and new electrical distribution structures, and/or to within 5 feet of indicated existing and/or new buildings, and any other structure indicated on Contract Drawings. f. Provision of new underground conduits with pull cords from within 5 feet of electrical distribution structures and to within 5 feet of future and existing toilet buildings. g. Provision of all conduits to distribute power from within 5 feet of the electrical distribution structures and to within 5 feet of the recreational vehicle sites future RV power distribution "hitching post", and between RV power "hitching posts" noted on the Contract Drawings. h. Protection of existing control conduit and wiring between existing Well House at Well #2 and existing reservoir and Well #2 building while new water line is installed. It is intended that the existing conduit and wire shall remain in service for control of the wells when this project is completed. i. Coordination with the serving utility companies (power and telephone) and other Contractors involved with other aspects of the overall project. j. The Contractor shall plan and execute his work in a manner that does NOT remove and/or damage any existing overhead and/or underground telephone and/or power infrastructure. All existing lines shall be repaired or replaced by the Contractor at no added cost to the Owner or other parties if they are damaged during construction. Any damage to lines owned and maintained by the serving utilities will be repaired by the utilities if damaged, with the costs paid by the Contractor at his expense. Utilize Dig Safe procedures prior to any excavation as existing lines indicated on Contract Drawings are known to be of questionable accuracy and may not indicate all installations presently in operation and to be maintained. k. Field coordinate final positions of all transformer bases, sector cabinet bases, telephone pedestals, bollards, and similar items with the Utilities and Contracting Officer. l. Field coordinate final positions of future RV power distribution "hitching posts" and electrical distribution structures with the Contracting Officer before starting installations of associated equipment and conduits. m. Obtain all permits and approvals required, including final inspections and/or progress inspections by any representatives of the serving utilities and any local, state, or federal agency involved with the project so as to leave the facility installations completed and operational in accordance with the intent of the Contract Documents.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2028 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a comprehensive suite of airfield infrastructure improvements scheduled for implementation by 2028, aimed at enhancing safety, operational efficiency, and compliance with aviation standards. Work includes replacing aging airfield lighting circuits that exhibit low megger readings with modern LED fixtures and signage, improving visibility and reducing maintenance demands. Concurrently, failing pavement sections and critical utility systems will be excavated and rebuilt to restore structural integrity and prevent service disruptions. Wildlife hazard mitigation is a major component, involving the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on signage to deter birds, and the regrading of low-lying areas alongside new storm drainage infrastructure to eliminate ponding that attracts wildlife. Additional scope includes the replacement of deteriorated flush fire hydrant access hatches to ensure rapid emergency access. All work is being coordinated under the Aviation Project Management Group of the Port of Seattle, with primary contact Yanet Maldonado overseeing procurement and project coordination. The contract is classified under NAICS code 237990 for other heavy and civil engineering construction and reflects a long-term commitment to airfield modernization and safety enhancement.
Aviation Project Management Group

POSTED

about 8 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Həʔapus Park Redevelopment - ConstructionThe Həʔapus Park Redevelopment project, managed by the Port of Seattle through Waterfront Project Management, aims to significantly enhance public amenities and accessibility within the park. Key improvements include the construction of new restrooms, upgraded pathways with enhanced lighting, a boot washing station to support environmental stewardship, dog-friendly features, and the installation of wayfinding and interpretive signage to improve visitor experience and education. Additionally, a hand-carrying boat launch will be added to accommodate non-motorized watercraft users. The project will involve both upland and in-water construction activities, carefully phased to comply with environmental permitting requirements and to avoid disruption to tribal fisheries, with a targeted substantial completion date in the second quarter of 2028. The project is currently in the forecast stage as of July 26, 2026, with a NAICS code of 237990 indicating it falls under other heavy and civil engineering construction. Primary point of contact for inquiries is Angela Peterson, reachable via email or phone, while Julie Yun serves as the project manager. The full scope and formal solicitation details are accessible through the Port of Seattle’s online portal, though no set-aside provisions or specific contracting mechanisms have been publicly defined at this stage. The redevelopment prioritizes ecological sensitivity, cultural respect, and enhanced public access, aligning with broader waterfront stewardship goals.
Waterfront Project Management

POSTED

about 8 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
Federal
USACE NWD DESIGN BUILD/DESIGN BID BUILD REGIONAL MATOCThe U.S. Army Corps of Engineers, Northwestern Division, Portland District, is issuing a competitive, firm-fixed price, indefinite delivery indefinite quantity Multiple Award Task Order Contract for design-build and design-bid-build construction services across the Portland, Seattle, and Walla Walla Districts. This five-year contract, covering fiscal years 2027 through 2032, has an estimated total capacity of $99 million and is structured as a total small business set-aside under FAR 19.5, with the NAICS code 237990 and a $45 million size standard. The scope includes civil, structural, architectural, electrical, and mechanical work such as site utilities, drainage, paving, concrete and steel structures, roofing, elevators, power distribution, generators, lighting, SCADA/PLC systems, HVAC, plumbing, fire protection, and industrial equipment like pumps and compressors, primarily for flood control, hydropower, navigation, and recreational infrastructure. The solicitation will follow a two-phase evaluation process: Phase One will assess qualification packages to select up to ten firms, and Phase Two will involve full proposals submitted in response to a seed task order valued between $5 million and $10 million, with price and non-price factors evaluated as approximately equal in weight to determine best overall value. No discussions are intended, but the government reserves the right to conduct them if necessary. All offerors must be registered in SAM.gov prior to submission, and proposals must be submitted electronically through the SAM portal; responses to this presolicitation notice are not accepted. The solicitation is anticipated for release in mid-August 2026, with proposals due approximately 45 days later, and Phase Two offerors will have a minimum of 30 days to respond after the amendment is issued. Only small businesses, including those certified as 8(a), WOSB, SDVOSB, or HUBZone, are eligible, with 26 of 28 respondents in the market research phase qualifying as small businesses. Work will be performed throughout Southwest Washington and Oregon, with potential task orders extending to the Seattle and Walla Walla Districts, and no options beyond the five-year base period are included.
W071 Endist Portland

POSTED

1 day ago

DEADLINE

in 10 days
View Details