Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on April 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Don Benito Reservoir Replacement Engineering Services

Closed
2026-RFP-0118State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Sandlake Road Slide(MP10.6)(Tierra Del Mar); 23788; CA/CEI
Solicitation # S-73000-00018190
Solicitation S-73000-00018190 is a Mini-RFP issued by the Oregon Department of Transportation to secure Construction Contract Administration and Construction Engineering and Inspection (CA/CEI) services. The project focuses on rebuilding Sandlake Road at MP10.6 in Tierra Del Mar following a landslide that damaged the southbound lane. The anticipated period of performance begins on December 15, 2026, and is expected to conclude by July 16, 2029. Funding for the project is provided by the Federal Highway Administration. The contract will be structured as a Work Order Contract assigned under an existing Price Agreement. Compensation is based on a Time and Materials model with a Not-to-Exceed maximum, though the final statement of work, payment amount, and delivery schedule will be negotiated with the top-ranked proposer. Award selection is based on a scoring system totaling 100 points for the technical proposal—covering philosophy, project samples, management, and cost-effectiveness—plus up to 25 additional points for potential interviews. Qualified proposers must ensure that services are performed under the authority of an inspector certified by the Oregon Department of Transportation Quality Assurance Certification Program. Additionally, firms must maintain a Consultant Quality Plan and certify compliance with conflict of interest guidelines, non-discrimination laws, and sexual harassment policies for contracts exceeding 150,000 dollars. Proposals must be submitted via OregonBuys as a single PDF file not exceeding five pages and five megabytes.
Procurement

POSTED

about 8 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The City of Pasadena's Water and Power Department (PWP) is seeking engineering services for the replacement of the Don Benito Reservoir, an essential storage facility serving specific water zones within Pasadena and surrounding areas. The reservoir was demolished after the 2025 Eaton Fire, prompting reliance on an interconnection with a neighboring water agency to maintain service. The project scope is grounded in a concept design report and a technical memorandum completed in early 2026, which provide the framework for detailed engineering work. PWP emphasizes the urgency of this replacement, requiring the selected engineering firm to adhere to an expedited schedule and meet critical delivery milestones to restore and enhance the water system's reliability. The contract defers the detailed tank structure design to the construction phase, allowing the constructor to finalize this work based on performance criteria established during the engineering design phase. The solicitation, issued by PWP in April 2026 with a response deadline in May 2026, underscores the importance of collaboration and timely execution. Points of contact for the project include the City's engineer and project manager, and the work will be performed in California, primarily within the service area of the affected water zones. This contract represents a key investment in infrastructure recovery and resilience for the City of Pasadena's water distribution system.

General Info

Pasadena seeks expedited engineering for Don Benito Reservoir replacement after 2025 fire damage.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

15

City of Pasadena Conflict of Interest Disclosure and Certification

PDF, High priority: read this first2 pages · conflict-of-interest
High

City of Pasadena Master Services Contract

PDF, High priority: read this first19 pages · contract-document
High

Declaration of Non-Collusion and Vendor Forms for City of Pasadena Procurement

PDF, High priority: read this first6 pages · declaration-of-noncollusion
High

DoIT Technical Assessment Questionnaire Rev 20210806

XLSX, High priority: read this first5 pages · technical-questionnaire
High

Exclusive Negotiating Agreement Template - City of Pasadena

PDF, High priority: read this first7 pages · contract-document
High

Relevant Experience Form for Bid Submission

PDF, High priority: read this first5 pages · past-performance
High

Supplemental FEMA Terms & Conditions v2 (Oct 1, 2024)

PDF, Medium priorityguidance
Medium

City of Pasadena Unique Entity Identifier (UEI) Form

PDF, Low priority1 page · other
Low

Designated Representatives and Key Personnel Form

PDF, Low priority1 page · other
Low

Disqualification Disclosure Questionnaire

PDF, Low priority1 page · disqualification-disclosure
Low

Federal Required Certification Regarding Lobbying

PDF, Low priority1 page · certification
Low

Pasadena Taxpayer Protection Amendment Disclosure

PDF, Low priority1 page · disclosure
Low

Standard Form-LLL Disclosure of Lobbying Activities

PDF, Low priority3 pages · disclosure-of-lobbying-activities
Low

Attachment_-_Don_Benito_Tank_Concept_Design_TM.pdf

PDF

Don Benito Reservoir Replacement Engineering Services.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Water & Power Department (Water)
Contacts2 people available
OfficePasadena, CA, 91101, USA
Office AddressPasadena, CA, 91101, USA
Contacts
Antonio WatsonProject Manager

Interested Companies (39)

EntramPORT CHARLOTTE, FL
UltraSystems Environmental Inc. (DBE | SBE | WBE)Irvine, CA
WHB EngineersSan Diego, CA

See All 39 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The City of Pasadena's Water and Power Department (PWP) is a municipally owned and operated utility that provides domestic water service through over 35,000 connections in the City of Pasadena, unincorporated areas in Altadena, East Pasadena, and Los Angeles County. Don Benito Reservoir is one of 22 storage reservoirs in the PWP water distribution system and the only reservoir that serves the Don Benito and Don Benito Reduced Pressure Zones. After the 2025 Eaton Fire, the reservoir was demolished and an interconnection with a neighboring water agency was activated for water delivery to the affected zones. PWP commissioned a concept design report which provides a description of the facility that is to be designed in detail. The concept design includes descriptions of major systems, preliminary drawings, and supporting information. The Don Benito Tank Replacement Technical Memorandum (TM) dated March 16, 2026, is attached to this RFP and is the basis for the scope of work, establishing the technical framework for moving forward into final design. The replacement of the Don Benito Reservoir is of high priority to PWP. Commitment by the selected engineering firm to an expedited, but reasonable, schedule and adherence to delivery milestones is imperative. In the interest of compressing the duration of the design phase of the project, PWP elects to defer the detailed design of the tank structure by the tank constructor to the construction phase based on performance criteria established by the engineering firm.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS