Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Tennessee was posted on March 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Donelson Station Transit Center Building Design

Closed
2026229State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541310
New
International
Request for Proposal No. 0890-20-FS01, Fire Station Renovation Project at 160, 198 and 206 Jensen Avenue West
Solicitation # 0890-20-FS01
The City of Parksville is seeking a consultant for the Fire Station Renovation Project located at 160, 198, and 206 Jensen Avenue West in British Columbia. The project requires multi-disciplinary services to advance the renovation from preliminary design to a complete, constructible design package ready for permitting and procurement. The scope encompasses architectural, structural, mechanical, electrical, civil, landscape, and fire protection disciplines, with a specific emphasis on minimizing disruptions to fire department operations and response capabilities during construction. Key deliverables include a detailed design package, building permit application support, and assistance with grant reporting. Proposals are due by 3:00 pm local time on December 21, 2026, and must be submitted in PDF format via email. Evaluation is based on a fee proposal, which is weighted at 20 points, and the proponent's project approach, methodology, and understanding of the Parksville context. The contract requires adherence to 2010 ADA Standards for Accessible Design and MDMC waterworks specifications. The selected consultant must provide an insurance certificate, business license confirmation, and a WorkSafeBC registration number before proceeding. Invoicing is to be submitted by the 20th of each month, with payment terms of 30 days from receipt. There is no set-aside status specified for this solicitation.
City of Parksville

POSTED

1 day ago

DEADLINE

in 30 days
NAICS: 541310
New
International
University of Calgary - Pre-qualification Request - Design Disciplines Consulting Services
Solicitation # 2026PRQ0011
The University of Calgary has issued a Pre-qualification Request (2026PRQ0011) for Design Disciplines Consulting Services to establish a pool of qualified firms for a five-year contract starting February 15, 2027. The solicitation seeks to pre-qualify proponents across five specific categories: architectural prime consultants for laboratories (up to 10), assembly spaces (up to 10), commercial office and retail uses (up to 5), interior design prime consultants (up to 5), and functional space programming (up to 5). Successful proponents will enter into the University of Calgary’s Master Architectural Agreement and must be authorized to provide services in Alberta. Proposals must be submitted in person at Mercer House by January 5, 2027, at 2:00 PM MT. The evaluation process requires a minimum category score of 75 for pre-qualification, with the University reserving the right to award contracts based on overall best value regardless of cost. Key requirements include maintaining professional and cyber liability insurance of at least $2,000,000 per occurrence and complying with Alberta Workers' Compensation statutory requirements. Submissions must follow strict formatting guidelines, including specific page limits and a three-file digital structure, and must include hourly rates for senior, intermediate, and junior consultants.
University of Calgary

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 541310
New
SLED
A/E Services for Quarles Elementary & Early Learning Center
Solicitation # RFQ-2027-28
Winchester City Public Schools is seeking a qualified architectural-engineering (A&E) firm to design a new K-5 elementary school and renovate a portion of the existing facility into a Pre-Kindergarten Early Learning Center in Winchester, Virginia. The project is structured in two phases: Phase 1 involves the design and construction of a 117,000 gross square foot school for 610 students, and Phase 2 involves the demolition and renovation of a 50,000 gross square foot Early Learning Center for 230 Pre-K students. The total project construction budget is 87 million dollars, and the project will utilize the Construction Manager At Risk (CMAR) procurement model. The anticipated period of performance for the A&E services is 12 months. Award is based on professional qualifications and proposed services, with a selection process involving an initial proposal evaluation and subsequent oral presentations for short-listed firms. Evaluation criteria include project team credentials, methodology, quality control, and the firm's educational design portfolio. Proposals must be submitted in a sealed container by December 30, 2026, and must include a W-9, Certificate of Insurance, and proof of authority to transact business in Virginia. The selected firm must comply with ADA and other disability legislation, maintain specific insurance coverage including additional insured endorsements for WPS, and certify that personnel having direct contact with students have no relevant felony convictions.
Winchester City Public Schools

POSTED

1 day ago

DEADLINE

in about 1 month

General Info

Place of Performance

TN, USA

Set-Aside

NONE

Documents

11
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstoperational-requirements
High
PDF, Low priority4 pages · conflict-of-interest-disclosure
Low
PDF, Low prioritystudy
Low
PDF, Low prioritytopographic-survey
Low
PDF, Low priorityreport
Low
PDF, Low priorityother
Low
PDF

Read all 11 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Architectural Design ServicesOpen now, due in 30 days
  • Request for Proposal No. 0890-20-FS01, Fire Station Renovation Project at 160, 198 and 206 Jensen Avenue WestOpen now, due in 30 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jun 4, 2026 to May 4, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTennessee → Engineering
Contacts2 people available
OfficeNashville, TN, 37155, USA

Interested Companies (53)

AEED
Alta Planning + DesignPortland, OR
Arcadis U.SLos Angeles, California

See All 53 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The Donelson Transit Center will be built on a portion of the current Donelson Station site, located east of downtown Nashville at 2705 Lebanon Pike. The station serves as a stop for the WeGo Star – a commuter rail line that runs from downtown Nashville to Lebanon – and a stop for buses serving Route 6 Lebanon Pike. On the north side of the property, Donelson Station borders a strip mall, a restaurant, and an auto parts store. The east side of the property borders FiftyForward, a resource and activity center for seniors. See Figure 1 for a recent picture of the transit station and an aerial view of the site. This project is the second phase of a broader initiative to transform Donelson Station into a neighborhood transit center, featuring both transportation infrastructure upgrades and enhanced amenities for riders. Phase One, currently in progress, involves the design of several transportation infrastructure improvements, including six bus bays, quiet zones, rail crossing enhancements, multimodal safety upgrades, internal roadways, and a new traffic signal. A landscaped bioretention basin will address stormwater and help control runoff from the transit center infrastructure improvements. Phase Two encompasses designing a transit center building with a climate-controlled indoor waiting area, seating, and other amenities for transit riders and WeGo Staff. The Donelson Transit Center is, in part, made possible by the Choose How You Move (CHYM) program. In 2024, Nashville voters approved a 0.5% sales tax surcharge and created a dedicated funding source for the transportation improvement program, known as CHYM. This program will deliver a variety of transportation projects to enhance sidewalks, signals, service, and safety across Nashville. Planned transit service upgrades include constructing 12 new Transit Centers throughout Nashville and Davidson County. The design of the Donelson Transit Center has the following objectives: Enhancing transit rider experience; Expanding multimodal connectivity, including non-motorized transportation modes and integration of bus and rail service; Increasing safety and security of transit riders, WeGo staff, area residents, and visitors; Providing accessible transit service to all users; and Supporting opportunities for future development by ensuring the site is adaptable to adjacent redevelopment and prepared for long-term growth. As noted, the transit center building design must fit within the infrastructure improvements for which design is currently in progress, culminating in the construction of a neighborhood transit center to improve service, rider experience, and enhance transit connectivity. Therefore, the selected consultant must coordinate and integrate the building design with the design work currently underway. All design documents and other applicable materials will be made available to the consultant to appropriately inform the design of the transit center building. The location of the building onsite will be determined through this coordination. In addition to coordinating with active design work, the consultant must also review and, where appropriate, incorporate prior studies and concept plans prepared by WeGo. These documents provide important operational, planning, and development context for the project and include, but are not limited to: Transit Center Operational Requirements Study (Exhibit 1) Transit Infrastructure Concept (Exhibit 2) Mixed Use Development Concept (Exhibit 3) Transit Oriented Development Parking Study (Exhibit 4) These materials establish a broader framework to guide the development of the transit center, including positioning the site to support future joint development opportunities with private partners, an outcome of particular interest to WeGo. See Attached Exhibits in the OpenGov Project Portal . Consistent with prior project coordination, WeGo has already fulfilled the environmental review requirements for this project in accordance with the National Environmental Policy Act (NEPA). Accordingly, the consultant will not be responsible for preparing any additional environmental documentation or analysis. Public and stakeholder engagement will also be limited as outreach was conducted in support of Phase One. The selected consultant may be required to support targeted coordination meetings or limited public involvement activities as needed; however, broad-based engagement efforts are not anticipated. Documentation of any outreach and engagement efforts completed in support of the project, including survey results and summary reports, will be made available to the selected consultant to inform the design of the transit center building. Project Timeline Infrastructure construction is scheduled to begin in late 2026, with a desire for construction of the Transit Center building to being in early 2027. All bid and final construction documents must be finalized and all required permits acquired prior to the start of construction activities. The consultant shall demonstrate how they can meet or accelerate this timeline.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS