Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on July 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Donner Trails Tank No. 2 Interior Coating Rehabilitation

Closed
20260724030State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238320
New
SLED
Paint All Exterior and Common Area Doors, Buildings 4166, 4167, 4168 & 3673
Solicitation # N400857606105
Solicitation N400857606105 is for a project at MCAS Cherry Point, North Carolina, involving the cleaning, preparation, priming, and painting of approximately 800 exterior and common area doors, frames, vents, and louvers across Buildings 4166, 4167, 4168, 4169, and 3673. Additionally, the scope includes refinishing approximately 2,350 linear feet of handrails at Building 3673. The contractor must ensure a uniform, durable finish, with common area and storage doors painted on both sides and residential doors painted on the corridor-facing side only. All work must be completed within 180 calendar days after the award. The contract will be awarded based on the lowest price and is subject to the Davis-Bacon Act, with a minimum wage requirement of 13.65 per hour for covered workers through December 31, 2026. Bonding requirements vary by proposal value: no bonds for amounts 35,000 and less, a payment bond for amounts between 35,000 and 150,000, and a bid, payment, and performance bond for amounts exceeding 150,000. Proposals are due by September 18, 2026, at 1200 local time. The project requires a Quality Control Manager to oversee the work and ensure compliance with government standards, as any inadequate surface preparation or coating defects will be recoated at the contractor's expense.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The project involves the rehabilitation of a 160,000 gallon above-grade welded steel water storage tank located at 11570 Donner Pass Road in Truckee, California, under the jurisdiction of the Truckee Donner Public Utility District. The scope includes interior coating system rehabilitation through surface preparation via blasting, necessary weld repairs, and recoating with approved coating materials, along with the installation of a galvanic anode cathodic protection system as a bid alternate. The contractor is fully responsible for all aspects of the work including surface preparation, coating application, disinfection, testing, and compliance with all applicable standards such as ASTM, AWS D1.1/D1.6, NSF, UL, and California DOT specifications. All materials must be delivered in original sealed containers with clear labeling of manufacturer, brand, color, and identification number, and must remain unopened until inspected. Anodes, coatings, and other sensitive materials require specific packaging, storage, and handling protocols to maintain integrity, including climate-controlled storage, protection from moisture and UV exposure, and adherence to manufacturer’s recommended shelf life. The contract requires submission of shop drawings, test reports, and record drawings reflecting as-built conditions, and mandates full compliance with OSHA and California Safety Orders, including prohibitions on open flames during coating operations and mandatory use of air-supplied respirators and solvent containment systems. The solicitation is structured as a fixed-price contract awarded under a Lowest Price Technically Acceptable (LPTA) methodology, where the award is made to the lowest bid that is responsive, responsible, and fully compliant with all technical specifications. Bidders must submit a sealed hard-copy proposal by 2:00 PM on August 19, 2026, to the district office in Truckee; electronic submissions are expressly prohibited. Mandatory bid requirements include a bid bond, a performance bond equal to 100% of the contract amount, and a payment bond, all executed in accordance with state requirements. Compliance with California prevailing wage laws and submission of certified payroll records are required, and substitutions of materials or equipment are not permitted without formal written approval. The contractor must also maintain minimum insurance limits of $5 million in general liability, pollution liability, and automobile liability, with the district named as additional insured. The project must be completed by July 30, 2027, with performance beginning upon issuance of the Notice to Proceed. No specific contract value is available due to incomplete pricing data in the solicitation, but the

General Info

Rehabilitate 160k-gallon steel water tank in Truckee, CA; blasting, welding, coating, disinfection, cathodic protection optional.

Agency

California → Truckee Donner Public Utility DistrictView Agency

NAICS

238320 - Painting and Wall Covering ContractorsView NAICS

Place of Performance

Truckee, CA, 96161, USA

Set-Aside

NONE

Documents

(1)

Donner Trails Tank No. 2 Interior Coating Rehabilitation Bid Set July 2026

PDFrfp

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Truckee Donner Public Utility District
Contacts3 people available
OfficeN/A
Organization / Agency
California → Truckee Donner Public Utility District
View Agency Profile
Office AddressN/A

Full Description

Show more
Bid #204997-10: The project involves the rehabilitation of a 160,000 gallon above-grade welded steel water storage tank. The work includes rehabilitation of the interior coating system, which involves blasting, weld repairs as necessary, and recoating. The project also includes the installation of a galvanic anode cathodic protection system as a bid alternate. The contractor is responsible for all necessary repairs, surface preparation, coating application, disinfection, and testing.

More opportunities from California → Truckee Donner Public Utility District

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS