Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

DOOR,ACCESS,AIRCRAF — 1560016882813 — N0038326QQB51

Active
N0038326QQB51

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This fixed-price solicitation, issued by NAVSUP Weapon Systems Support Philadelphia, seeks a contractor to provide all labor, materials, and facilities necessary to teardown, evaluate, overhaul, upgrade, repair, test, and inspect one aircraft access door (NSN 1560-01-688-2813) to return it to a Ready For Issue condition. The work must be performed in accordance with OEM technical drawings and publications, with an estimated repair turnaround time of 119 days. The contractor is responsible for all tooling and manufacturing aids, as the government will not provide fixtures or special test equipment. Key technical requirements include the prohibition of MIL-W-81381 wire in favor of SAE-AS22759 series wire and compliance with IPC/EIAJ-STD-001C for personnel certification if MIL-STD-454 is referenced. The government intends to make a single award based on the most advantageous offer, prioritizing past performance over price. Evaluation will include the DoD Supplier Performance Risk System (SPRS) to assess quality, item, and supplier risk. The contractor must maintain a quality management system compliant with ISO 9001/SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1. Specific provisions are outlined for items determined to be Beyond Economical Repair (BER), Missing on Induction (MOI), or requiring Over and Above Repair (OAR), all of which require written concurrence from DCMA and the Procuring Contracting Officer. Packaging and marking must adhere to MIL-STD-2073 and MIL-STD-129, with delivery terms set as FOB Destination. Quotations are due by October 26, 2026.

General Info

Fixed-price contract for aircraft access door overhaul and repair by October 26, 2026.

Documents

(1)

N00383-26-Q-QB51 - DOOR, ACCESS, AIRCRAFT Repair

PDF•50 pages•rfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Notice updated

The notice title changed. NAICS code added: 336413. The notice description changed. The point of contact changed.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navsup Weapon Systems Support
ContactsNo contacts available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA
ContactsNo contact information available

Full Description

Show more
TECHNICAL DATA PACKAGE
Description
TDP VERSION NUMBER 001 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: DOOR,ACCESS,AIRCRAF ;74A304135-1021; P/N, ;1560 016882813; NSN, ;OEM Tech Drawings; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. DOOR,ACCESS,AIRCRAF ;THE BOEING COMPANY; Company Name , ;DEFENSE, SPACE & SECURITY DIVISION 6200 J S MCDONNELL BLVDSAINT LOUIS, MO 63134 ; Address , ;0PXV4; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

Similar Contracts

Same NAICS industry code

NAICS: 336413
New
Federal
70--TRANSFER UNIT,PROGR, IN REPAIR/MODIFICATION OF
Solicitation # N0038326RHA98
This pre-solicitation notice from NAVSUP Weapon Systems Support concerns the procurement of 105 transfer units for program repair or modification. Due to the flight-critical nature of the item and the specific technical data requirements, the government intends to solicit and negotiate with only one source under the authority of FAR 6.302-1. Because the item requires government source approval, only previously approved sources have been solicited. Unapproved sources wishing to propose must submit detailed information via a NAVSUP WSS Source Approval Information Brochure along with their proposal. Failure to provide all required data or documentation of a pending approval request will result in the offer being disqualified from consideration. Interested parties may identify their capability to satisfy the requirement within 15 days, and all proposals received within 45 days of the notice will be considered. The government reserves the discretion to determine whether to proceed with a competitive procurement based on the responses received. While this notice is not a formal request for competitive proposals, it serves to gather market research to determine if competition is possible. Technical specifications and standardized documents can be obtained through the DoD Single Stock Point or ASSIST-Online, though specific patterns and drawings are not stocked at the DODSSP.
Navsup Weapon Systems Support

POSTED

about 2 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 336413
New
DIBBS
HOUSING ASSEMBLY, END-A
Solicitation # SPE4A7-26-T-756Q
Solicitation SPE4A7-26-T-756Q is a request for quotations issued by DLA Aviation for the procurement of five Housing Assembly, End-Actuators, identified by NSN 1615-01-202-7130 and part number 5060458 from Whippany Actuation Systems, LLC. This item is designated as a critical application item. The required delivery timeframe is 171 days after order, with shipping terms set as FOB Origin and delivery to DLA Distribution San Joaquin in Tracy, California. The government encourages expedited delivery and may grant an evaluation preference to quotes offering a shorter delivery schedule. The contract mandates strict quality and security compliance, requiring the manufacturer's inspection system to meet ISO 9001:2015 or an equivalent standard. Sampling must adhere to MIL-STD-1916 or ASQ H1331, with a zero-nonconformance requirement for acceptance. Security requirements include a CMMC Level 2 self-assessment and compliance with DFARS 252.204-7012 for safeguarding covered defense information. Packaging must follow ASTM D3951 and RP001, while marking and labeling must comply with MIL-STD-129. Additionally, the procurement is subject to the Buy American Act and Berry Amendment, and the use of additive manufacturing is prohibited unless specifically authorized. Invoicing and receiving reports must be processed electronically through the Wide Area WorkFlow system.
ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 21 hours ago

DEADLINE

in 4 days
View Details
NAICS: 336413
New
DIBBS
PARTS KIT, VALVE OVERHA
Solicitation # SPE4A7-26-T-757N
This solicitation, issued by DLA Aviation Supplier Operations under number SPE4A7-26-T-757N, is a request for quotations for 12 units of a valve overhaul parts kit, identified as a critical application item. The required part is manufactured by Hydro-Aire Aerospace Corp, part number 39-07523, with NSN 1630-00-071-9308. The contract specifies a delivery period of 171 days, with a need ship date of March 16, 2027, and an original required delivery date of October 11, 2027. Delivery terms are FOB Origin, with both inspection and acceptance occurring at the destination, specifically at the DLA Distribution Depot Hill in Utah. The contract incorporates rigorous technical and quality requirements, including adherence to the DLA Master List of Technical and Quality Requirements. Quality assurance and sampling must follow MIL-STD-1916, ASQ H1331, or a comparable zero-based sampling plan, with specific verification levels assigned to critical, major, and minor attributes. Packaging must comply with MIL-STD-129 for marking and labeling, while non-hazardous materials must meet ASTM D3951 standards, and hazardous materials must follow TQ requirement IP025 and the Hazard Communication Standard. Offerors must also comply with domestic sourcing regulations, including the Buy American Act and the Berry Amendment, and must use the Wide Area Workflow (WAWF) system for electronic invoicing and receiving reports.
ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 21 hours ago

DEADLINE

in 4 days
View Details

More opportunities from Department Of The Navy → Navsup Weapon Systems Support

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS