Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Doors, Frames & Openings

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

San Diego, CA, 92037, USA

Set-Aside

NONE

Documents

This scope was carved out of 602915.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

DSDW Lab 53 CRM CO2 Dickson Lab Renovation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUniversity of California, San Diego
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs hollow metal doors, access doors, and overhead coiling doors for prime contractors on University of California, San Diego facility projects. Installs frames and specialized overhead coiling door systems. Delivers installed and functional door systems.

Similar Contracts

Same NAICS industry code

NAICS: 238150
New
CBP5501 Bldg. 181 Door Replacement Services
Solicitation # CBP5501
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to replace two commercial storefront door assemblies at the Building 181 cafeteria of the San Diego Job Corps Center in Imperial Beach, California. The project focuses on improving security, accessibility, and weather resistance. According to Addendum 1, the contractor shall retain existing full-height storefront framing and upper glazing, focusing instead on the replacement of doors, door-level headers, thresholds, hardware, closers, and electrified access-control components. All work must comply with federal, state, and local building codes, including the Americans with Disabilities Act (ADA) and California accessibility requirements. The estimated contract value ranges from 0 to 25,000 dollars. Bids are evaluated based on overall best value, and a physical site visit is mandatory prior to submission. Required bid documentation includes a detailed cost breakout on company letterhead, proof of insurance, and three references. A bid bond of 20 percent is only required for bids equal to or greater than 25,000 dollars. The awarded contractor must complete the work within 30 consecutive business days after receiving a notice to proceed or after all parts are received. Compliance requirements include adherence to the Davis-Bacon Act for prevailing wages and various Federal Acquisition Regulation clauses regarding small business utilization, whistleblower rights, and the prohibition of certain foreign purchases. Contractors must provide a minimum one-year workmanship warranty and two sets of operation and maintenance manuals. Final payment is contingent upon the submission of a Notice of Final Completion, certified payroll reports, and a release of liens.
San Diego Job Corps Center

POSTED

28 minutes ago

DEADLINE

in 14 days
View Details
NAICS: 238150
New
SLED
566 River Street Window replacement
Solicitation # 2140390
The Troy Community Land Bank Corporation is soliciting proposals for a window replacement and exterior woodwork restoration project located at 566 River Street (also referenced as 566 2nd Avenue) in Troy, New York. The scope of work includes the removal and disposal of 53 existing windows and the installation of 53 new energy-efficient replacement windows. Additionally, the contractor must repair or replace deteriorated exterior woodwork, such as sills, casings, and decorative columns, and apply two coats of exterior paint to match existing colors. All work must adhere to applicable building codes, manufacturer requirements, and lead-safe work standards. The project requires a one-year workmanship warranty and the submission of all close-out documentation upon substantial completion. Proposals are due by November 20, 2026, at 8:00 a.m., and must be submitted via mail or hand delivery. A mandatory site visitation was scheduled for November 5. Evaluation will be based on technical capability, past experience, project schedule adherence, and the completeness of the response. Required submission documents include an Initial Disclosure Form, Legal Status Form, Non-Collusion Bidding Certificate, Bidder Hold Harmless Agreement, and Iran Divestment Act Certification. Invoicing must be submitted using AIA forms. The contract includes a Women Business Enterprise goal of 20.00% and requires compliance with the Immigration Reform and Control Act and New York State debarment and safety regulations.
Troy Community Land Bank Corporation

POSTED

about 12 hours ago

DEADLINE

in 22 days
View Details
NAICS: 238150
New
SLED
IH-25043/ State Parking Garage Single Entrance Remodel-1350
Solicitation # One (1)
The State of Colorado Department of Personnel and Administration is soliciting quotes for the turnkey remodel of a single storefront entrance at the State Parking Garage located at 1350 Lincoln Street in Denver. With a budget of 75,000 dollars, the scope of work includes the procurement, assembly, and installation of a framing system, glass, electrical components, and security access for the interior remodel of levels 1 and 4. The project must be fully closed out by June 30, 2027, to comply with state fiscal year rules, with a specific completion deadline of May 30, 2027. The contract will be awarded to the lowest responsible bidder, with preference given to Colorado resident bidders and local labor. Technical requirements mandate that all work adhere to engineered drawings, OSHA standards, and ADA accessibility guidelines. Contractors are responsible for all AHJ Right-of-Way requirements, including permits and inspections, and must provide full manufacturer warranties for all parts and labor. Bidders must submit their quotes on company letterhead via a single zip file to Richard Sartirana by November 6, 2026, at 2:00 PM. Because the project budget exceeds 50,000 dollars, a bid security of at least 5 percent of the bid price is required. Additionally, awarded vendors must be registered in CORE, registered to do business in the State of Colorado, and participate in E-Verify.
DPA - Capital Construction/controlled Maintenance

POSTED

1 day ago

DEADLINE

in 8 days
View Details

More opportunities from University of California, San Diego

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS