Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Dos Rios Parking Entrance Irrigation

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Parks and Recreation, Central Valley District, is implementing the Dos Rios Parking Entrance Irrigation project in Stanislaus County. This initiative aims to replace unsustainable manual watering with a permanent irrigation system to support newly planted vegetation in the parking area. The project is categorized as exempt under Classes 1, 3, and 4 due to its nature as minor alteration and maintenance with no significant environmental impact. The scope of work includes excavating a 3,800-foot combined utility trench measuring 3 feet by 12 inches with a sand base for electrical and water lines. Technical requirements involve installing waterline piping ranging from 1/2-inch to 4-inch, specifically connecting a 4-inch SCH 40 PVC pipe to an existing 2-inch galvanized pipe. The contractor will install pop-up sprinklers, drip lines, irrigation control and shut-off valves, tracer wire, and utility tape. Additionally, the project requires the installation of buried boxes for valves and controllers, which must be set level with planting surfaces and filled with drain rock to prevent rodent burrowing. The trench will be backfilled with native screened soil and compacted using a J-Tamp. Andrew Collum serves as the primary point of contact for this effort.

General Info

California Parks and Recreation installing permanent irrigation system at Dos Rios parking entrance.

Agency

California Parks and Recreation, Department of

Place of Performance

Park Entrance Rd., Shiloh Rd., CA, 95358

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A

Full Description

Show more
Project proposes to install an irrigation system in the entrance area of Dos Rios to provide water to newly planted vegetation in the parking area. Currently the area is watered by hand, which is time-consuming and not a sustainable practice. Waterline piping will vary from ½-in. to 4-in. From the existing well work will: • Excavate a 3-ft x 12-in. x 3,800-ft long trench, with 2-in. of sand on the bottom, for use as a combined utility trench with electrical and water lines; • Connect a 4-in. SCH 40 PVC waterline pipe to an existing 2-in. galvanized pipe waterline; • Backfill the trench with native screened soil and compact with a J-Tamp; • Install all necessary irrigation control and shut off valves, tracer wire and utility tape for future utility improvement projects. • Install pop-up sprinklers, and drip line where needed; • Install buried boxes, set level with planting surfaces, for the valves and irrigation controllers; and • Fill the box bases with drain rock to deter burrowing rodents.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 16 days
View Details
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 1 hour ago

DEADLINE

in 1 day
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS