Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Dos Rios Parking Entrance Irrigation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Parks and Recreation, Central Valley District, is implementing the Dos Rios Parking Entrance Irrigation project in Stanislaus County. This initiative aims to replace unsustainable manual watering with a permanent irrigation system to support newly planted vegetation in the parking area. The project is categorized as exempt under Classes 1, 3, and 4 due to its nature as minor alteration and maintenance with no significant environmental impact. The scope of work includes excavating a 3,800-foot combined utility trench measuring 3 feet by 12 inches with a sand base for electrical and water lines. Technical requirements involve installing waterline piping ranging from 1/2-inch to 4-inch, specifically connecting a 4-inch SCH 40 PVC pipe to an existing 2-inch galvanized pipe. The contractor will install pop-up sprinklers, drip lines, irrigation control and shut-off valves, tracer wire, and utility tape. Additionally, the project requires the installation of buried boxes for valves and controllers, which must be set level with planting surfaces and filled with drain rock to prevent rodent burrowing. The trench will be backfilled with native screened soil and compacted using a J-Tamp. Andrew Collum serves as the primary point of contact for this effort.

General Info

California Parks and Recreation installing permanent irrigation system at Dos Rios parking entrance.

Agency

California Parks and Recreation, Department of

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Park Entrance Rd., Shiloh Rd., CA, 95358

Set-Aside

NONE

Documents

(1)

Dos Rios Parking Entrance Irrigation Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Andrew CollumEnvironmental Scientist

Full Description

Show more
Project proposes to install an irrigation system in the entrance area of Dos Rios to provide water to newly planted vegetation in the parking area. Currently the area is watered by hand, which is time-consuming and not a sustainable practice. Waterline piping will vary from ½-in. to 4-in. From the existing well work will: • Excavate a 3-ft x 12-in. x 3,800-ft long trench, with 2-in. of sand on the bottom, for use as a combined utility trench with electrical and water lines; • Connect a 4-in. SCH 40 PVC waterline pipe to an existing 2-in. galvanized pipe waterline; • Backfill the trench with native screened soil and compact with a J-Tamp; • Install all necessary irrigation control and shut off valves, tracer wire and utility tape for future utility improvement projects. • Install pop-up sprinklers, and drip line where needed; • Install buried boxes, set level with planting surfaces, for the valves and irrigation controllers; and • Fill the box bases with drain rock to deter burrowing rodents.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 11 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 11 hours ago

DEADLINE

in about 21 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 11 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS