Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Dr. Martin Luther King, Jr. Library Refurbishment Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Dr. Martin Luther King, Jr. Library Refurbishment Project, managed by Los Angeles County, involves the interior remodeling of the facility located at 17906 South Avalon Blvd in Carson, California. The project aims to enhance the visitor experience through comprehensive interior renovations, including the installation of new light fixtures and controls, replacement of flooring and carpeting, installation of ceramic wall tiles and stud walls, and painting of walls and soffits. Additionally, the scope of work encompasses limited ceiling replacement and the reconfiguration of electrical and data outlets. This project, identified as Capital Project No. 88980, was approved by the County of Los Angeles Board of Supervisors on September 1, 2026. It has been granted a Notice of Exemption from CEQA requirements under State Guidelines 15301 and County Class 1, as the work does not expand or change the existing use of the building. The project is categorized under NAICS code 236220 and is currently listed as a forecast with Donald Day serving as the primary point of contact.

General Info

LA County interior remodeling of Dr. Martin Luther King, Jr. Library in Carson.

Agency

California → Los Angeles County

Place of Performance

Carson, CA, 90746

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Los Angeles County
Office AddressN/A
Contacts
Donald DayDivision Manager

Full Description

Show more
The proposed Project would refurbish and remodel the existing interior features at the Dr. Martin Luther King, Jr. (MLK) Library located at 17906 South Avalon Blvd, Carson, CA 90746. The refurbishing and remodeling of the library would provide needed interior renovations to improve visitor experience. The proposed interior refurbishment work would include installation of light fixtures and controls; replacement of flooring and carpeting; installation of ceramic wall tile and stud wall; painting of walls and soffits; limited ceiling replacement; and floor modifications and reconfiguration of electrical and data outlets.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 26, 2026, with a response deadline of November 4, 2026. To ensure project financing and avoid being deemed non-responsive, bidders must strictly adhere to six Good Faith Effort (GFE) requirements. Mandatory documentation that must be included in the initial bid package includes proof of public notification, specifically a minimum of 30 consecutive calendar days of online posting and one day of print newspaper publication, as well as evidence of utilizing the Small Business Administration and the Minority Business Development Agency. Documentation regarding outreach efforts may be submitted up to three business days after the bid closing date. Prime contractors are further required to flow these GFE requirements down to any subcontractors they award.
RT CONTRACTOR CORP

POSTED

about 4 hours ago

DEADLINE

in 8 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of the existing Building 1272T engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. All work must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a subcontracting opportunity for the multi-floor water damage restoration of Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project aims to restore the first, second, and third floors to their original condition following a fire sprinkler discharge on June 13, 2026. The scope of work encompasses architectural repairs, including drywall replacement, painting, ceiling tile repair, and the installation of rubber wall bases and LVP flooring, as well as necessary plumbing and electrical work. All activities must comply with OSHA, EPA, ADA, and NFPA-101 life safety codes, as well as local Massachusetts building ordinances. The contract is a single lump sum award based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026, including a detailed cost breakdown, a 90-day bid guarantee, and a Massachusetts contractor's license. The project is subject to the Davis-Bacon Act, requiring specific minimum wage payments and paid sick leave for employees. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 4 hours ago

DEADLINE

in 21 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
The P1102 Weapons Magazine and Ordnance Operations Facility project at Naval Submarine Base New London in Groton, Connecticut, is a comprehensive construction effort managed by J & J Contractors, Inc. The project spans 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. Key structural elements include reinforced concrete floors, grounding and lightning protection, intrusion detection systems, and specialized foundations utilizing rigid inclusions and load transfer mats. Additionally, the scope includes the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The scope of work is extensive, covering demolition, abatement, structural steel, roofing, mechanical, electrical, and plumbing systems, as well as site work involving rock excavation and grading. Site improvements include the development of access roads, paved loading areas, and landscaping, with a specific requirement for wetland mitigation. Electrical infrastructure will consist of primary and secondary distribution systems, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB, with a response deadline of October 31, 2026.
J & J Contractors, Inc

POSTED

about 4 hours ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262, with potential upgrades to Buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms by replacing vanities and lavatories, and updating interior surfaces with new paint and signage. Technical upgrades involve installing raised flooring, updating electrical distribution with simple dimming controls and new ceiling fans, replacing variable air volume systems, and correcting plumbing deficiencies. The project also requires the contractor to move and protect all loose furniture and equipment. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Award will be determined using a best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience. Contractors must provide performance and payment bonds and adhere to Davis-Bacon wage determinations and ADA accessibility guidelines. Submittals are due within 14 days of award, and a construction quality control plan must be submitted seven days prior to the preconstruction conference. Final acceptance is contingent upon a government pre-final and final inspection to ensure all punch-list items are corrected.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS