Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on July 9, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DRAFT SYNOPSIS - Brandon Road Interbasin Project - A-E SATOC

Closed
DRAFT-W912EK24RBRIPAESATOC-DRAFTFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 14 hours ago

DEADLINE

in 14 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

IL

Set-Aside

NONE

Documents

2

Brandon Road Interbasin Project (BRIP) AE SATOC Draft Synopsis

PDF, High priority: read this firstpresolicitation
High

Brandon Road Lock & Dam Electric Fish Deterrent Design Recommendations

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

special-notice

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist Rock Island
Contacts2 people available
OfficeROCK ISLAND, IL, 61299-5001, USA
Office AddressROCK ISLAND, IL, 61299-5001, USA
Contacts
Samantha Johanson
Chris Paitson

Full Description

Show more
**Revision 0001 - The purpose of this revision is to include the Draft Electronic Deterrent report completed by Cold Regions Research and Engineering Labratory as attachment "Aquatic_Electric_Barrier_Design_Recommendations__100_Watermark." The U.S. Army Corps of Engineers, Rock Island District, is issuing this DRAFT Synopsis for the Brandon Road Interbasin Project, Architect-Engineer Firms (A-E) Services Single Award Task Order Contract (SATOC). This is only a DRAFT. Project Description: This is planned to be an Unrestricted Acquisition (No Small Business Set-Aside Status). The Brandon Road project is a federal risk management plan including a layered system of structural controls and non-structural measures to prevent to the maximum extent possible the transfer of aquatic nuisance species from the Mississippi River Basin into the Great Lakes Basin while minimizing impacts to waterway uses and users. The non-structural plan includes managing the waterway below Brandon Road as a - population reduction zone where monitoring and overfishing would occur. The structural plan includes a new control point at Brandon Road Lock and Dam in addition to the control point that is already provided by the electric dispersal barrier at Romeoville, Illinois. The new structural control point will include an engineered channel, acoustic deterrent, a bubble deterrent, an electric deterrent, and flushing lock. Performance services under this A-E SATOC will be performed solely for the Brandon Road Interbasin Project located on the Illinois Waterway at the Brandon Road Lock and Dam in Rockdale, IL. The Inland Design Center of Expertise will be leading the technical team assembled for this $1.1 billion project as estimated in March 2023, certified Total Project Cost Estimate. The total construction cost estimate is $910,000,00.00. Rock Island District, USACE, will be an integral part of the technical team managing this SATOC through the engineering, contracting, and construction phases. This Scope of Work (SOW) requires comprehensive design and support services to take the greater innovative project from current concept levels to 100 percent design products and then continue engineering support through USACE contracting and construction phases. Work will require extensive coordination within USACE (primarily Inland Navigation Design Center, Rock Island District, and Engineering Research and Development Center - various laboratories) as well as regular coordination with a large group of external entities to include but not limited to: the local sponsor; navigation; USCG; construction firms; and other federal agencies. DO NOT SUBMIT A SF 330 in response to this DRAFT Synopsis. The purpose of this draft is to inform industry and to gather industry feedback prior to release of the final Synopsis. All information received in response to this DRAFT Synopsis that is marked proprietary will be handled accordingly. In preparation for the formal Synopsis, please see the attached Draft Synopsis. Interested parties are highly encouraged to review the DRAFT Synopsis and submit any questions via email to the POC listed below. Submitting questions early will provide additional time to answer your questions and respond prior to final Synopsis. Contract Specialist - Samantha Johanson: Samantha.k.johanson@usace.army.mil DISCLAIMER: THIS IS NOT A REQUEST FOR SF 330. THIS IS A DRAFT SYNOPSIS ONLY. THE SOLE PURPOSE OF THIS NOTICE IS TO PROVIDE INFORMATION FOR INUDSTRY TO REVIEW PRIOR TO ISSUANCE OF THE OFFICIAL SYNOPSIS AND TO OBTAIN FEEDBACK AND QUESTIONS. This announcement is not a Synopsis, request for SF 330, promise to issue any future contract, forum to discuss upcoming work, nor commitment to offer work of any kind on the part of the Government. In event the Government does issue a Synopsis for this project in the future, the information provided in this DRAFT Synopsis may change. After reviewing the attached DRAFT Synopsis, the Government has questions that we're requesting feedback from Industry on as follows: Do you have any concerns with staffing the required disciplines stated within the DRAFT Synopsis? If yes, then please state why. Do you have any concerns with the eight-year duration of the A-E SATOC? If yes, then please state why. Any concerns with the years of experience required for disciplines listed in Primary Selection Criteria a. Professional Qualifications? If yes, then please state why. Is there anything stated within the A-E SATOC that is concerning to you and why? Are there additional criteria that the Government should evaluate? If yes, then please state why. Are there criteria the Government should revise or eliminate? If yes, then please state why. What timeframe (in days, e.g. 30 days) would you require to submit a SF 330 response if this Synopsis remains relatively unchanged? Should the page count be raised or lowered from the current amount of 75 pages? If recommending an alternative, please state why. Thank you for your interest!

More opportunities from Department Of Defense → W07V Endist Rock Island

Same awarding agency

NAICS: 326199
New
Federal
Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Flushing Lock and Dam Gates Fabrication
Solicitation # W912EK27RA001
The U.S. Army Corps of Engineers, Rock Island District, is soliciting proposals for the design, testing, fabrication, and delivery of ten Fiber Reinforced Polymer composite structures for the Brandon Road Lock and Dam in Joliet, Illinois. The required deliverables include two 16x16 ft dam headgates, two 8x8 ft flushing valves, two 8x8 ft flushing valve bulkheads, two 14x14 ft filling valves, and two 14x14 ft filling downstream bulkheads. This procurement is a 100% Small Business Set-Aside under NAICS code 326199, with a size standard of 750 employees. The contract will be awarded to a technically acceptable small business offeror providing the lowest price. Technical evaluation requires the submission of three fact sheets demonstrating the fabrication of FRP structures exceeding 10,000 pounds using the vacuum infusion process, along with resumes for a Professional Engineer and a fabrication supervisor with similar experience. Proposals must be submitted electronically via the PIEE Solicitation Module by November 30, 2026, and must include four distinct volumes covering technical capabilities, past performance, pricing, and administrative certifications. The contract includes strict quality control requirements, including a Fabricator Quality Control Plan due within seven days of the notice to proceed, and specifies liquidated damages of 9,700 dollars per calendar day for both interim and final delivery delays. Performance and payment bonds equal to 100 percent of the contract value are required within ten days of award.
All Other Plastics Product Manufacturing

POSTED

6 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS