Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Drainage and Stormwater Infrastructure

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Drainage and Stormwater Infrastructure involves the installation of comprehensive storm drainage systems for prime contractors working on Texas Facilities Commission infrastructure projects. The scope of work includes the installation of various reinforced concrete box culverts ranging from 6x3 to 7x4, as well as grate inlets, curb inlets, manholes, and polypropylene piping with diameters between 18 and 60 inches. The ultimate objective is to deliver a fully functional storm drainage system that adheres strictly to all project specifications. The opportunity is categorized under NAICS code 238910 and was posted on November 5, 2026. Interested parties must submit their responses by the deadline of December 15, 2026. This project is managed through the Texas Facilities Commission and is listed on the Texas SmartBuy portal.

General Info

Subcontract for Texas Facilities Commission storm drainage and infrastructure installation by December 15, 2026.

Agency

Texas Facilities Commission

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 0007577.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

PERMIAN BASIN BEACON ROADWAYS AND INFRASTRUCTURE PROJECT

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas Facilities Commission
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas Facilities Commission
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs storm drainage systems for prime contractors on Texas Facilities Commission infrastructure projects. Installs reinforced concrete box culverts (various sizes 6'x3' to 7'x4'), grate inlets, curb inlets, manholes, and polypropylene piping ranging from 18" to 60". Delivers a fully functional storm drainage system per project specifications.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Woodside Road Median Island Beautification East Of 280 Construction Management
Solicitation # PWD-2026-02
The Town of Woodside is soliciting construction management services for the Woodside Road Median Island Beautification project, located on State Route 84 from Highway 280 to Alameda De las Pulgas. The project scope involves the installation of California native, drought-tolerant landscaping, including the demolition of existing asphalt and concrete, installation of pavers, soil preparation, grading, and the planting of various shrubs and trees. Additional requirements include the placement of boulders and the installation of new irrigation systems with necessary tie-ins across designated work areas Median C through J. The project requires formal approval via a Caltrans Encroachment Permit and must adhere to ADA accessibility guidelines and prevailing wage laws. Proposals are due by December 2, 2026, and must be submitted as two hard copies and one digital PDF on a flash drive. Evaluation is based on project management experience (20%), staffing capability (20%), and cost-effectiveness (20%). Qualified firms must demonstrate the completion of at least two similar projects in California within the last five years. The selected consultant will provide monthly itemized billing and must submit a cost proposal with a total not-to-exceed fee. Final project acceptance is contingent upon the completion of a punch list, final cleaning, and the submission of all project record documents to the Town.
Town of Woodside

POSTED

about 10 hours ago

DEADLINE

in 27 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS