Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on February 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Drainage Improvements - Groton-New London Airport

Closed
IFB No. 2026-013State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 11 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 12 hours ago

DEADLINE

in 24 days

General Info

Documents

1

IFB No. 2026-013 - Groton Drainage Improvements

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut Airport Authority
Contacts1 person available
OfficeCT, USA
Organization / AgencyConnecticut Airport Authority
Office AddressCT, USA
Contacts
Laurie SiroisPurchasing Agent

Full Description

Show more
Return to Bid List Bid NUMBER IFB No. 2026-013 TITLE Drainage Improvements - Groton-New London Airport PROCESS Two Step Unsealing BASE CURRENCY USD STATUS Closed to Bidding DESCRIPTION BID DOCUMENTS BIDDERS RESULTS CALENDAR
You must log in to register for Bid Events and to view Bid Question and Response information.
NUMBER IFB No. 2026-013 TITLE Drainage Improvements - Groton-New London Airport AVAILABLE DATE 2/17/2026 1:00 PM CLARIFICATION DEADLINE 3/12/2026 11:00 PM DUE DATE 3/26/2026 11:00 AM CONTACT INFORMATION
Laurie Sirois
Purchasing Agent
contact@example.gov
BID TYPE IFB DESCRIPTION
The project consists of the installation of a 214,000 cubic foot underground stormwater detention storage tank system. Additionally, some ancillary aspects of the project will involve installation of new manholes, catch basins, and pipe to route to the detention system, outfitting of a backflow preventor, isolated re-grading in turfed areas,  replacement of the existing sidewalk accessing the General Aviation (GA) ramp, limited pavement saw cutting, repaving, security fence alterations, airfield marking, site erosion and sedimentation control, and site dewatering.
BID EVENTS (1 record) TITLE ATTENDANCE REQUIRED TO BID DESCRIPTION LOCATION REGISTRATION CUTOFF DATE EVENT START DATE EVENT END DATE CANCELLED ATTACHED FILE FILE DESCRIPTION MANDATORY Pre-Bid Conference Yes A MANDATORY Pre-Bid Conference will be conducted at Groton-New London Airport, 155 Tower Ave, Groton, CT 06340, in the terminal building. A site visit will also be held immediately following the Pre-Bid Conference Groton-New London Airport 3/5/2026 11:00 AM 3/5/2026 12:00 PM No

More opportunities from Connecticut Airport Authority

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS