Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Georgia was posted on July 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Drainage Structure Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The scope of work involves the installation of approximately 1,450 square feet of permeable pavement and eight vegetated stormwater management cells to treat roughly 1.7 acres of impervious surface within a 3.3-acre drainage area. Additional requirements include the installation of six native trees and approximately 345 native plants, as well as necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. The project also encompasses limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, concluding with final stabilization, cleanup, and restoration. This opportunity specifically seeks subcontractors and suppliers from Minority Business Enterprises, Disadvantaged Business Enterprises, and Women-Owned Business Enterprises, as well as other small business categories including HUBZone and Veteran-Owned Small Businesses. Interested parties are encouraged to form consortiums if individual bid items are too large for a single small business to manage. Bids must be submitted by September 17, 2026, at 4:00 P.M. Primary points of contact for the solicitation include Jennifer Wilson and Jonah Leith.
Harbel, Inc.

POSTED

about 8 hours ago

DEADLINE

in 5 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a comprehensive infrastructure solicitation issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins measuring 54 and 145.5 inches. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, surface restoration, and the excavation of cobbles and large boulders. This opportunity is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids are due by September 29, 2026, and the project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors regarding bonding, insurance, and material procurement.
James W. Fowler Co.

POSTED

about 8 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract involves the installation of storm drainage infrastructure including culverts, catch basins, and piping to effectively manage surface water runoff across the hangar site at the Franklin Hart County Airport Authority facility in Georgia. The work is classified under NAICS code 237110 for heavy and civil engineering construction and is structured as a subcontract opportunity with a response deadline set for August 19, 2026. The project aims to enhance drainage capacity and prevent water accumulation in critical operational areas, ensuring long-term site resilience and compliance with environmental and safety standards. The solicitation was posted on July 20, 2026, and interested parties must submit proposals by the specified deadline to be considered for award. All performance is expected to occur at the designated airport hangar location, though specific city or zip details are not provided in the posted data.

General Info

Install storm drainage infrastructure at Franklin Hart County Airport hangar in Georgia by August 19, 2026.

Agency

Georgia → Franklin Hart County Airport AuthorityView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of 013039001.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Franklin-Hart Airport T-Hanger Development Phase 1

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Franklin Hart County Airport Authority
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → Franklin Hart County Airport Authority
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of storm drainage systems including culverts, catch basins, and piping to manage surface water runoff across the hangar site.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS