Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Georgia was posted on August 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Drainage System Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 5 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

This subcontract for the City of Monroe involves the installation of comprehensive drainage systems for the North Wayne St. Parking Lot improvements. The selected contractor will be responsible for installing pipes, catch basins, and general drainage infrastructure, including culverts and storm drains, to ensure a functional stormwater system that adheres to all local municipal drainage and environmental codes. The opportunity was posted on August 7, 2026, with a response deadline of September 7, 2026. Classified under NAICS code 237990, this project requires the subcontractor to work alongside prime contractors to deliver critical infrastructure improvements within the state of Georgia.

General Info

Subcontract for North Wayne St. drainage installation in Monroe, Georgia by September 7, 2026.

Documents

This scope was carved out of PE-74750-NONST-2026-000000026.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

North Wayne St. Parking Lot Improvements ITB

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Monroe
ContactsNo contacts available
OfficeN/A
Organization / AgencyGeorgia → City of Monroe
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs drainage systems for prime contractors on City of Monroe municipal projects, here the North Wayne St. Parking Lot improvements. Installs pipes, catch basins, and drainage infrastructure using drainage piping, culverts, and storm drains per local municipal drainage and environmental codes. Delivers a functional stormwater drainage system.

More opportunities from Georgia → City of Monroe

Same awarding agency

NAICS: 237310
New
SLED
SR 11 at US 78 East Bound Ramp Intersection Improvements - KW Project No. 240294
Solicitation # PE-74750-NONST-2026-000000030
The City of Monroe is soliciting bids for the SR 11 at US 78 East Bound Ramp Intersection Improvements, identified as KW Project No. 240294. The project scope involves widening the SR 11 at US 78 eastbound ramp and installing a new traffic signal at the intersection. Key construction activities include the demolition of existing raised medians, roadway widening, milling and resurfacing of asphalt, striping, road markings, and the implementation of erosion control measures. The work must adhere to GDOT Specifications and the Manual for Erosion and Sediment Control in Georgia, with personnel requiring Level 1A erosion control certification. Bids are due by November 19, 2026, at 2:00 pm local time at Monroe City Hall. A pre-bid conference is scheduled for November 12, 2026, at 2:00 pm. The contract will be awarded to the responsible bidder submitting the lowest responsive bid. Required submission materials include a bid security equal to 5 percent of the total bid amount, a list of proposed subcontractors and suppliers, evidence of authority to do business in Georgia, and a valid Georgia State Contractor’s License or GDOT Prequalification. The project is governed by EJCDC C-700 Standard General Conditions, and the contractor is responsible for providing performance and payment bonds upon award. Keck & Wood, Inc. serves as the project engineer.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 23 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS