Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on October 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Drainage System Restoration and Culvert Installation

Closed
State & Local
Submission Closed

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Drainage System Restoration and Culvert Installation is a subcontract opportunity issued by the California Department of Transportation. The project involves the installation of comprehensive drainage systems along Route 94 and Route 188, specifically focusing on the placement of culverts, storm drains, and catch basins. All work, including excavation, pipe laying, and grading, must be performed in strict accordance with Caltrans standards and include the implementation of necessary erosion control measures. This opportunity was posted on October 13, 2025, and requires responses to be submitted by the deadline of December 2, 2025. The project is categorized under NAICS code 237990, reflecting its focus on specialized drainage and infrastructure construction. Interested parties can find further details and submission guidelines through the CalProcure portal.

General Info

Caltrans subcontract for drainage and culvert installation on Route 94 and Route 188.

Documents

This scope was carved out of 11-430264.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Drainage restoration, ADA curb ramps & complete street.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Imperial Irrigation District – East Highline ReservoirOpen now, due in 10 days
  • Imperial Irrigation District – East Highline ReservoirOpen now, due in 10 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of drainage systems including culverts, storm drains, catch basins, and erosion control measures along Route 94 and Route 188, with excavation, pipe laying, and grading per Caltrans standards.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Del Norte County About 5 Miles South Of Crescent City From 1.9 Miles South To 1.0 Mile South Of Mill Creek Park Entrance
Solicitation # 01-0M1204
Contract 01-0M1204 is a construction project managed by the California Department of Transportation for work on State Highway 101 in Del Norte County, approximately 5 miles south of Crescent City. The scope of work includes excavating and constructing roadway, widening shoulders, installing guardrails, and implementing drainage improvements. Key technical tasks involve high friction surface treatment, asphalt concrete paving, electrical systems installation, and the removal and installation of roadside signs and markers. The project is located in a freeze-thaw area and requires the implementation of stage construction and traffic handling plans, with Stage 1 completion required by March 15, 2027. The estimated cost of the project is 4,370,000 USD. The contract requires professionally facilitated project partnering and the submission of a noise control plan within 15 days of approval. Compliance requirements include adhering to prevailing wage rates, Buy America standards for iron and steel, and the electronic submission of certified payroll records via LCPtracker Pro. Performance is subject to strict quality control testing for high friction surface treatment, with the Department accepting work based on visual inspections for texture, raveling, streaking, and flushing. There is no specified set-aside status for this solicitation.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS