Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on December 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Dredging Services

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 11 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 12 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The contract requires the performance of dredging services in flood control channels and retention basins within San Bernardino, California, with a focus on sediment removal, dewatering, and proper disposal in full compliance with applicable environmental regulations. All work must be executed to ensure the continued functionality of flood infrastructure while minimizing ecological disruption. The scope emphasizes adherence to regulatory standards throughout every phase of operation, from extraction to final disposal, ensuring no unauthorized discharge or contamination occurs. The solicitation is classified as a subcontract under NAICS code 237990 and is issued by the Land Development & Contracts division of San Bernardino County’s Public Works department. The response deadline is January 17, 2026, and the place of performance is specified as 92415-0835. No set-aside designation has been applied, and while the contracting agency is based in California, the physical work is concentrated locally within San Bernardino. All proposers must be prepared to meet technical, environmental, and logistical demands tied to maintaining critical flood control systems in an urban setting.

General Info

Dredging sediment in San Bernardino flood channels with strict environmental compliance through January 17, 2026.

Documents

This scope was carved out of PWG126-LANDD-6173.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Hawker Crawford Channel - Land Surveying Services

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Landdevcontracts - Public Works - Land Development & Contracts
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Conduct dredging operations in flood control channels and retention basins, including sediment removal, dewatering, and disposal in compliance with environmental regulations.

More opportunities from California → Landdevcontracts - Public Works - Land Development & Contracts

Same awarding agency

NAICS: 237310
New
SLED
North San Bernardino ADA Ramps
Solicitation # PWG127-LANDD-6577
The North San Bernardino ADA Ramps project, solicitation number PWG127-LANDD-6577, is a local government contract issued by the San Bernardino County Department of Public Works. The scope of work involves installing and updating ADA-compliant ramps, curbs, gutters, and sidewalks at various locations in the Del Rosa area, including specific intersections at Pumalo Street with Osbun Road and Rosena Avenue. Additional deliverables include the removal of two trees and the installation of slot drains and root barriers. The project is anticipated to be completed within 40 working days and must adhere to Caltrans 2025 Standard Specifications and Plans, MUTCD 2014, and SPPWC Standard Plans 2021. The contract will be awarded to the lowest responsive and responsible bidder based on the total price of all items. Bidders must submit a signed proposal, a noncollusion declaration, and a bid security of at least 10 percent of the bid amount via the ePro system or physical delivery by November 19, 2026. The successful contractor must provide a Labor and Materials Bond and a Faithful Performance Bond, each equal to 100 percent of the contract price. Key compliance requirements include registration with the Department of Industrial Relations, adherence to general prevailing wage rates, and certification of compliance with California Air Resources Board regulations. Contractors are also required to maintain project records for three years following final payment and comply with strict nondiscrimination and equal employment opportunity standards.
Highway, Street, and Bridge Construction

POSTED

7 days ago

DEADLINE

in 23 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS