Drinking Water Test Well

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Crescent City in California is seeking to install a drinking water test well, approximately 150 feet in depth, located near Rellim Road. The primary objective of this project is to determine the feasibility of the well as a backup municipal water supply. The scope of work includes the construction of the well followed by a pump test to assess capacity, evaluate impacts on adjacent wells, and collect water quality samples for laboratory analysis. If the results confirm the well is viable, the city will initiate a separate project to design the well pump, headworks, and integration into the existing water system. However, if the well is deemed non-viable, it will be destroyed in accordance with California well regulation requirements. The project has been granted a CEQA Notice of Exemption under categorical exemptions for information collection and minor land alterations. Coordination is being managed by Bob Brown, Contract Planning Director, and David Yeager, Public Works Director.

General Info

Crescent City seeks a 150-foot test well to evaluate backup water supply feasibility.

Agency

California → Crescent City

Place of Performance

Off Rellim Rd and approximately ½ mile south of the Smith River, Crescent City, CA, 95531

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Crescent City
Contacts2 people available
OfficeN/A
Organization / Agency
California → Crescent City
Office AddressN/A
Contacts
Bob BrownContract Planning Director
David YeagerPublic Works Director

Full Description

Show more
The City is looking to install a test well in order to determine the feasibility of a municipal well as Name of Public Agency a backup supply to their existing water source. The test well is anticipated to be approximately 150 feet in depth. As part of the construction of the test well a pump test would be completed to assess the capacity of the well, determine effects on adjacent wells, and collect water quality samples for submittal to an analytical laboratory for water quality analysis. If the pump test and water quality results indicate that the well is viable as a supply well, then, as a separate project, design of the well pump, headworks, and tie-in into the City's water system would commence. If the pump test and water quality results indicate that the well is not viable as a supply well, the test well would be destroyed per California well regulation requirements.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key scope elements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, and new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is designated as a small business set-aside. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. Performance is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. The project timeline begins upon a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to meet substantial completion dates. Payments are processed monthly via applications for payment submitted to the Engineer, with a 30-day payment term following presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of open and covered concrete structures, including concrete resurfacing, restoration, and the installation of platforms and access improvements. Technical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, the installation of valves and piping appurtenances, and the operation of a temporary 11 MGD pumped bypass. Additionally, the project encompasses the rehabilitation of reactor mixers and aerators, motor control center component replacement, modifications to sluice and slide gates, and various electrical and instrumentation improvements. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. Requested services and supplies include lead abatement, metals fabrication, painting and coatings, trucking and hauling, and FRP reinforcing systems. Any exceptions to the standard Garney Purchase Order and Subcontract documents must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS