Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on May 19, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Driscoll Community Center Project (ARPA)

Closed
IFB #3312-25State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 6 hours ago

DEADLINE

in 5 days
NAICS: 238160
New
SLED
INDEX ROOF FLUID APPLIED ROOF
Solicitation # 27-350SOS-PHYSE-B-54721
The Illinois Secretary of State is soliciting bids for the installation of a new fluid-applied roof system on the Index Building located at 111 E. Monroe St, Springfield, IL. The project requires the application of a white, cold-applied, single-component silicone elastomer membrane designed for permanent weather and sunlight exposure. Key deliverables include the construction of a 100 square foot mock-up, the performance of a 72-hour flood test to ensure water resistance, and the provision of a 20-year manufacturer full labor and material warranty. The award will be granted to the responsive and responsible bidder who submits the lowest price. Bidders must submit all proposals electronically via BidBuy by November 19, 2026, and must provide a 10% bid bond. The contract requires adherence to strict material storage and delivery standards, including the use of original manufacturer containers and storage in weather-protected environments. Compliance with the State Prompt Payment Act, prevailing wage laws, and the Illinois Department of Human Rights Act is mandatory. Additionally, the total contract term, including all renewals and extensions, cannot exceed ten years. Vendors must provide a Certificate of Insurance naming the State as an additionally insured party and are responsible for all safety barricades and traffic signage during the project.
PHYSERV350 - Physical Services

POSTED

about 8 hours ago

DEADLINE

in 22 days
NAICS: 238160
New
SLED
Gatesville ISD Intermediate Campus Roof Repair
Solicitation # RFP2026-1030
Gatesville Independent School District is soliciting sealed proposals under RFP 2026-1030 for comprehensive roof repairs at the Intermediate campus, with an expanded scope via addendum to include a portion of the High School campus facility. The project requires a qualified contractor to provide all labor, supervision, equipment, and materials for a commercial roofing layover. Key technical specifications include the removal of existing gravel, installation of 2.2 inch ISO board for the main area and 1 inch ISO board for the addendum area, and the application of 60mil GAF-TPO or an equivalent system. The scope also encompasses the installation of ten GAF speedtite drains with 4 inch piping, tapered ISO boards at drains, steel deck system patching for caved-in areas, and the installation of proper flashing and pipe boots according to manufacturer specifications. The contract will be awarded based on a competitive solicitation process rather than low price alone, considering factors outlined in the Texas Education Code. Successful bidders must provide a five-year workmanship warranty, general liability insurance, and a standard manufacturer warranty. Proposers must submit a complete packet including mandatory certifications such as the SB 9 Criminal History Record, House Bill 89 Verification, and Senate Bill 252 Certification. All proposals must be submitted in sealed envelopes by October 30, 2026, at 2:30 p.m., with the final award scheduled for November 16, 2026. Bids must remain firm for 60 days following the award date.
GATESVILLE ISD

POSTED

about 12 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

Nueces County is seeking sealed competitive bids for the construction of the Driscoll Community Center located at 206 N. Navarro Ave., Driscoll, Texas. The project involves building a new community center utilizing specified materials and construction techniques outlined in detailed attachments, including plans and specifications. The contractor must complete all work within 210 calendar days from the Notice to Proceed, with liquidated damages of $250 per day for delays beyond the deadline. The scope includes constructing a wood-framed building with exterior walls of 2x6 studs, batt insulation, and durable exterior siding, along with interior walls of 2x4 studs, insulation, and drywall. The roof will feature wood trusses, plywood decking, and composition shingles, with the interior finished with suspended acoustical ceilings and LED lighting. The foundation will be a slab-on-grade reinforced with rebar, and all work must adhere to quality standards, with the contractor responsible for all tools, equipment, and debris removal. The project emphasizes timely completion, as federally funded work must be finished and operational by December 31, 2026, with no extensions from the U.S. Department of Treasury. The contract will be administered by the Nueces County Public Works Director, Juan Pimentel, and bids are due by June 10, 2025.

General Info

Agency

Texas → Nueces County

Place of Performance

TX, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Nueces County
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → Nueces County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Nature of Project The Commissioners Court of Nueces County (hereinafter called the “County”) will accept sealed competitive bids for: Driscoll Community Center Project at 206 N. Navarro Ave., Driscoll, TX 78351 in accordance with the Drawings, Specifications, and other Contract Documents prepared by International Consulting Engineers (ICE). Scope of Work The Scope of Work (SOW) for this project is detailed fully in the attachments below: • Attachment E – Specifications • Attachment F – Plan Drawings Bidder agrees that if his/her Bid is accepted by the County, he will complete all work called for under the Contract Documents on or before 210 calendar days after the date of the Notice to Proceed for the Base Bid, and if the work is not completed by such time, he/she agrees to pay to the County as liquidated damages, the sum of Two Hundred Fifty Dollars and no/100 ($250.00) for each calendar day after such time that the work remains incomplete, calculated in accordance with the provisions of the Contract Documents. The scope of work for the Base Bid consists of the following: Construction of new Community Center Building using 2X6 wood studs for the exterior walls with batt insulation and dens-glass sheathing on the exterior face with hardi-plank siding and gyp. bd. interior sheathing. All interior walls will be constructed using 2X4 wood studs with batt insulation and a layer of gyp. bd. on each side. Roof framing will be wood trusses designed by truss manufacturer, with 5/8” plywood deck with composition shingle roofing. Ceilings will be suspended acoustical 2X2 with 2x4 LED light fixtures. Building will be constructed on a slab-on-grade foundation with rebar reinforcing. The Contractor shall provide all tools and equipment that are necessary to complete the project in its entirety. All work shall be in accordance with the scope of work. All materials used for the project shall be equal to or better than the existing materials quality. The Contractor will be responsible for removal and disposal of all demolished materials and debris from the work area. The Contractor shall take proper care to avoid unnecessary noise, clatter or obstructions in walkways, sidewalks, and roadways. The Contractor shall not interfere with use or safe passage to and from building and adjacent facilities. Nueces County does not provide project estimated cost, in order to receive the lowest & best bid for our taxpayers. Time is of the essence. Failure to complete the Project within the contract time, except as such time may be extended by delays approved by County, will subject the Bidder to whom the contract is awarded, liability for damages, as provided in the Conditions of the Contract. Contract Administrator: Nueces County Public Works Director, Juan Pimentel , will serve as the contract administrator for this project. Note: The U.S. Department of Treasury will not extend its deadlines. All federally funded work/ assignments must be completed and in full use on or before December 31, 2026.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS