Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Driscoll Well and Pump Station Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Aromas Water District is proposing the Driscoll Well and Pump Station Project to enhance the reliability and resilience of its potable water supply system by constructing a new municipal water well, pump station, water treatment system, and solar photovoltaic system on the southern portion of a designated site. The project includes an approximately 730-foot-long underground 8-inch water pipeline that runs beneath the Union Pacific Railroad tracks within the Carpenteria Road right-of-way to connect with the District’s existing distribution system on Marshall Lane. The northern portion of the site will remain fenced and undeveloped. The primary objective is to supplement current water production capacity and provide operational redundancy without expanding service to new users or supporting future growth. The integration of solar power aims to reduce reliance on the electrical grid and lower long-term operational costs. The well is designed to improve drought resilience by supplying additional sources of potable water during periods of stress on existing infrastructure. All components are engineered to support the District’s existing demand profile and ensure continuous service to current customers. The project is anticipated to be managed under the oversight of the Aromas Water District in California, with primary contact information provided through Robert Johnson, General Manager, and Kate Elliot, Project Director. The forecasted posting date for this initiative is May 29, 2026, and the expected place of performance is within zip code 95004. No set-aside or NAICS code has been indicated, and the project is currently listed as a forecast with no formal solicitation number.

General Info

Aromas Water District to build new well, pump station, treatment system, and solar power to enhance water reliability within existing service area.

Agency

California → Aromas Water District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Carpenteria Road and Quarry Road, CA, 95004

Set-Aside

NONE

Documents

(4)

Driscoll Well and Pump Station Project NOI

PDFnotice-of-intent

Driscoll Well and Pump Station Project Summary Form

PDFenvironmental-summary

Driscoll Well and Pump Station Project Initial Study/Mitigated Negative Declaration June 2026

PDFinitial-study-mitigated-negative-declaration

Driscoll Well and Pump Station Project Notice of Completion

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Aromas Water District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Aromas Water District
Office AddressN/A
Contacts
Robert JohnsonGeneral Manager
Kate ElliotProject Director

Interested Companies (1)

Show more
Harris & Associates
San Diego, CA

Full Description

Show more
The proposed project consists of construction and operation of a new municipal water supply well, pump station, water treatment system, solar photovoltaic system, and associated infrastructure on the southern portion of the site. The remaining northern portion of the site would be fenced and not developed. The project also includes installation of an approximately 730-foot-long underground 8-inch water pipeline within the Carpenteria Road right-of-way, crossing beneath the Union Pacific Railroad tracks to connect to the District’s existing water distribution system on Marshall Lane. The purpose of the project is to supplement the current potable water system capacity and provide redundancy for the District’s production and distribution infrastructure. This will enhance the District’s ability to reliably serve existing users. The well is intended to provide system redundancy to meet existing water demands, improve drought resilience, and is not intended to support new growth or expanded service capacity.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 8 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS