Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on May 9, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Driveway Replacement at REPFAC

Closed
HSCG30-12-Q-PCV810Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Cabot Tower Signal Mast Replacement, Signal Hill National Historic Site
Solicitation # 5P468-26-0234/A
Parks Canada Agency is soliciting bids for the removal and in-kind replacement of the 6-meter wooden signal mast and associated rooftop equipment repairs at the Cabot Tower, located within the Signal Hill National Historic Site in St. John's, Newfoundland and Labrador. The project requires the contractor to remove the existing mast, measure it, and install an identical replacement to ensure existing equipment can be reattached, while also performing structural repairs to anchor bolts and roof materials. All work must comply with the National Parks Act, the Fisheries Act, and the 2025 National Building Code of Canada. The project is scheduled to be performed during the off-season when the tower is closed, with a final completion deadline of March 31, 2027. The contract will be awarded based on a weighted evaluation consisting of 90 percent price and 10 percent for an Indigenous Participation Plan. Bidders must follow a strict two-submission process, providing the Indigenous Participation Plan as Submission 1 and the Bid and Acceptance Form as Submission 2. Official bids must be submitted via email to soumissionsami-bidsrpc@pc.gc.ca or by fax to 1-855-983-1808 by the closing date of October 29, 2026, at 2:00 PM NDT. Submissions via SAP Ariba, courier, or in-person will not be accepted. Contractors are required to implement comprehensive site-specific health, safety, and environmental plans, including spill control and resource protection, and must provide security personnel to guard the site after working hours.
Parks Canada Agency

POSTED

about 17 hours ago

DEADLINE

in 9 days

General Info

NAICS

238120 - Structural Steel and Precast Concrete Contractors

Place of Performance

12992 Edgewater Drive, LAKEWOOD, OH, 44107, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Base CLEVELAND(00030)
Contacts2 people available
OfficeCLEVELAND, OH, 44199, USA
Office AddressCLEVELAND, OH, 44199, USA
Contacts
Melanie W SifrittPurchasing Agent
Maxine L Davis-BadleyContract Specialist

Full Description

Show more
Driveway Replacement at D9 Repfac located at 12992 Edgewater Drive, Lakewood, OH 44107. Contractor to remove the existing concrete driveway, walkway and the 3 condensor pads. Take care not to damage concrete that is to remain. Prepare the areas to receive new concrete with 3" of #57 crushed stone, leveled and compacted. Provide an install new 4" fiberglass reinforced concrete driveay, walkway and condensor pads. Provide and install 3" #57 crushed stone base course for new 4" fiberglass reinforced concrete driveway walkway and condensor pads. Saw cut the control joints within 24 hours of placing concrete. Use a wet saw to eliminate dust from sawing. Cure concrete for a period of seven days before allowing vehicles to used the new driveway. After forms are removed, backfill the concrete edges with top soil, seed and grass seed. The contractor shall be responsible for all dimensions used for the layout and forming the new concrete work. POC : FS1 Marty Betts (216)228-4491 or David Bolanz (216-902-6291 or 216-308-2841 to arrange a site visit. Contact Melanie Sifritt @ 216-902-6377 or Melanie.A.Sifritt@uscg.mil for a complete Scope of Work and Drawings

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS