This Solicitation opportunity from Government of Canada was posted on January 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
DRIVING STEEL PILES AND CONSTRUCTING PIER CAP ON PTH 3 AT MORRIS RIVER
Closed
7676CanadaSubmission Closed
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
Government of Canada → Manitoba Transportation and Infrastructure - Tendering and Contracts
NAICS
N/A
Place of Performance
CANSet-Aside
NONE
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
PhaseClosed
Submission Closed
Organization & Contact Information
Show more
AgencyGovernment of Canada → Manitoba Transportation and Infrastructure - Tendering and Contracts
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Manitoba Transportation and Infrastructure - Tendering and Contracts
Office AddressN/A
Contacts
Full Description
Show more
Driving steel h-piles at the abutments and grade beams, driving pipe piles at SU2, pouring concrete infill in pipe piles, and construction of the SU2 pier cap for a new structure over Morris River on PTH 3 located in N.E. 1/4 Section 19-07-1W, Rural Municipality of Macdonald, Bridge Site No. 0719-10. code : 100description : Mobilization of Equipmentquantity : 1unitOfMeasure : Lump-Sumcode : 101description : Traffic Control Level Iquantity : 1unitOfMeasure : Lump-Sumcode : 5771description : Environmental Management Proceduresquantity : 1unitOfMeasure : Lump-Sumcode : 403description : Supply of Field Office Class Bquantity : 1unitOfMeasure : Lump-Sumcode : 5966description : Access Roads and Site Work Roadsquantity : 1unitOfMeasure : Lump-Sumcode : 5967description : Work Bridges, Work Platforms and Rock Bermsquantity : 1unitOfMeasure : Lump-Sumcode : 5659description : Install Steel H Pile Tipsquantity : 62unitOfMeasure : Eachcode : 418description : Driving Steel H Pilesquantity : 1687unitOfMeasure : Metercode : 419description : Splicing Steel H Pilesquantity : 62unitOfMeasure : Eachcode : 5992description : Supplying Steel Pipe Pilesquantity : 268unitOfMeasure : Metercode : 6021description : Supply of Steel Pipe Pile Tipsquantity : 11unitOfMeasure : Eachcode : 5660description : Install Steel Pipe Pile Tipsquantity : 11unitOfMeasure : Eachcode : 423description : Driving Steel Pipe Pilesquantity : 268unitOfMeasure : Metercode : 5658description : Splicing Steel Pipe Pilesquantity : 11unitOfMeasure : Eachcode : 6016description : PDA Testingquantity : 6unitOfMeasure : Eachcode : 5716description : Supplying Reinforcing Steelquantity : 17600unitOfMeasure : Kilogramcode : 435description : Placing Reinforcing Steelquantity : 17600unitOfMeasure : Kilogramcode : 5895description : Supply and Place Concrete (Substructure)quantity : 120unitOfMeasure : Cubic Metercode : 437description : Heating Concretequantity : 76unitOfMeasure : Cubic Metercode : 6070description : Concrete Sealerquantity : 1unitOfMeasure : Lump-Sumcode : 376description : Permeable Formwork Linerquantity : 76unitOfMeasure : Square Metercode : 1303description : Supply and Fabricate Miscellaneous Metalquantity : 115unitOfMeasure : Kilogramcode : 469description : Placing Miscellaneous Metalquantity : 115unitOfMeasure : KilogramBidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.
