Dry Well Coating Project 2026
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Truckee Sanitary District is planning a coating project for the interior floor and lower sections of the walls in the steel dry wells at Lift Station 2 and Lift Station 4 located in Truckee, California. The project, titled Dry Well Coating Project 2026, is intended to enhance the durability and corrosion resistance of these critical infrastructure components, ensuring long-term operational reliability. Work will focus exclusively on the interior surfaces of the dry wells, with no external modifications planned, and is scheduled to take place in 2026 as indicated by the project title and posted date. The agency responsible for this project is the Truckee Sanitary District in California, with all performance occurring within the city of Truckee. Sarah Bergeron, the District Engineer, serves as the primary point of contact and can be reached via email at sbergeron@truckeesan.org or by phone at 530-550-3112. While no solicitation number, set-aside details, or NAICS code are provided, the project is publicly forecasted and accessible through the California Environmental Quality Act network under the UI link provided. The coating application is a preventive maintenance initiative aimed at extending the service life of the dry wells and mitigating potential structural degradation from moisture and chemical exposure.
General Info
Agency
NAICS
Place of Performance
Truckee, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
