Dual Water System Improvement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Dual Water System Improvement Project, led by the North of the River Municipal Water District and the City of Shafter, involves the construction of a specialized water infrastructure system for the Oildale Mutual Water Company in Kern County, California. The primary objective is to establish a dual water system that provides raw water for exterior and landscape use, thereby conserving treated water for drinking and interior purposes. The scope of work includes the installation of six new water supply wells drilled to approximately 1,000 feet, two 2.0 million gallon AWWA D100 welded steel storage tanks, and a booster pump station. One of the wells is designated as a potable water well and may include a Granular Activated Carbon treatment system for the removal of 1,2,3-TCP. Technical specifications include 105-foot diameter by 32-foot tall epoxy-coated steel tanks on concrete ringwall foundations and a booster pump station featuring fusion bonded epoxy lined steel piping and a 3,000-gallon hydropneumatic pressure tank. The project also involves extensive pipeline work, including a 36-inch C905 PVC transmission main and a 12-inch potable water main extension, both requiring cased crossings under Highway 99, UPRR railroad tracks, and the Lerdo-Beardsley Canal using tunnel boring and bore and jack methods. The project is subject to strict environmental and biological compliance measures under CEQA, specifically to protect the endangered San Joaquin Kit Fox. Requirements include the appointment of a qualified wildlife biologist for personnel training, the prohibition of pets and firearms on-site, and the use of escape ramps or covers for trenches deeper than two feet. Additionally, all wells must feature a minimum 50-foot deep sanitary seal and an 8 by 8 foot concrete surface pad to protect groundwater quality. Site restoration through re-contouring and revegetation is required upon project completion.

General Info

Construct dual water system with wells, tanks, pumps, pipelines to supply non-potable water, conserve drinking water, and comply with environmental and permit requirements.

Agency

California → North of the River Municipal Water District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Community Drive, Shafter, CA, 93314

Set-Aside

NONE

Documents

(4)

Notice of Completion - Dual Water System Improvement Project

PDFnotice-of-completion

Dual Water System Improvement Project Initial Study and Mitigated Negative Declaration July 2025

PDFenvironmental-documentation

Notice of Intent to Adopt Mitigated Negative Declaration for Dual Water System Improvement Project

PDFspecial-notice

Summary Form for Dual Water System Improvement Project Submittal

PDFenvironmental-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → North of the River Municipal Water District
Contacts3 people available
OfficeN/A
Organization / Agency
California → North of the River Municipal Water District
Office AddressN/A
Contacts
Doug NunneleyGeneral Manager
Curtis M. SkaggsSenior Engineer

Interested Companies (1)

Show more
Dee Jaspar & Associates
Bakersfield, CA

Full Description

Show more
The proposed project involves constructing six new water supply wells, two 2.0 MG welded steel storage tanks, a booster pump station, and the associated water conveyance pipelines for the Oildale Mutual Water Company (OMWC) as part of their dual water system whereby these facilities will supply landscape water and water for exterior use only. This will serve to save treated water for interior uses and drinking water purposes while using raw water for exterior and landscape uses. The two 2.0 MG AWWA D100 welded steel storage tanks and booster pump station are planned to be constructed at the existing OMWC property that is located south of Imperial Avenue and north of Flyover Court on APN 482-170-11 just west of Highway 65 in Section 33, T28S, R27E, M.D.B.&M. The two 2.0 MG storage tanks will be filled by a dedicated 36-inch transmission main that is connected to the five to six water supply wells. The water from the storage tank will then be conveyed to the existing developments to the west by gravity. In addition, the booster pump station will supply water to the area of the commercial and industrial development around Highway 65 and Imperial Avenue for exterior and landscape purposes. The tank dimensions are anticipated to be approximately 105-ft diameter by 32-ft tall and will be a welded steel storage tank that is epoxy coated on the interior and exterior and rests on a concrete ringwall foundation. The booster pump station will include above ground steel piping that is fusion bonded epoxy lined and coated, has booster pumps and motors, a 3,000-gallon hydropneumatic pressure tank, and electrical and controls. Each of the five or six well sites will be located between the Lerdo-Beardsley Canal and a ½-mile west of Zerker Road in Sections 34, 35, & 36, T28S, R26E, and Section 31, T28S, R27E, M.D.B.&M. The wells are planned to be drilled to an approximate depth of 1,000-ft and will be equipped with a vertical turbine pump and vertical hollowshaft electric motor and variable speed drive. The site will be fenced with 6-ft tall chainlink fencing with vinyl slats or masonry block walls to match the surrounding residential developments. The well site will be surfaced with ¾” Class II aggregate base with the limits being the fencing or block wall. The well site will include an electrical meter main, motor control center, PLC, and SCADA and will be installed on a concrete foundation with a steel shade structure. The well facility will also include a pad-mount emergency back-up generator. The well discharge piping will be 12-inch steel piping with a 3,000 gallon hydropneumatic pressure vessel. A 10-ft x 10-ft metal building enclosure will be installed around the deep well pump and motor for noise attenuation. The well discharge piping will transition below ground and to 12-inch C900 PVC pipe prior to leaving the site. The 12-inch C900 PVC piping will connect to the existing dual water system distribution piping that is installed as part of the residential development. One of the well sites is anticipated to be a potable water well. This well will be equipped in similar fashion to that described above but may also include a well head treatment system such as Granular Activated Carbon for the removal of 1,2,3-TCP. The treatment system would be installed on a reinforced concrete foundation and connected to the well discharge piping. In addition, a 36-inch C905 PVC transmission main will be installed from the tank and booster pump station site at APN 482-170-11 west along Imperial Avenue approximately 8,900-ft to the Highway 99. The transmission main will be installed with a minimum 36-inches of ground cover. The transmission main will then cross the Highway 99, the UPRR railroad tracks, and the North Kern Water Storage District Lerdo-Beardsley Canal with a 48-inch cased crossing approximately 715-ft in length via the tunnel boring method. In addition, OMWC will extend an existing 12-inch potable water main northwesterly along Saco Road approximately 985-ft and cross the Highway 99, the UPRR railroad tracks, and the North Kern Water Storage District Lerdo-Beardsley Canal with a 16-inch pipeline and a 30-inch cased crossing approximately 340-ft in length via the bore and jack method. The cased crossings will be permitted with the California Department of Transportation (Caltrans), the UPRR Railroad, and the North Kern Water Storage District.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 7 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 7 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a solicitation issued by James W. Fowler Co. on behalf of the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins measuring 54 and 145.5 inches. Additional infrastructure requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and piping systems. The project requires specialized civil works, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This opportunity is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. James W. Fowler Co. is actively encouraging M/W/DBE participation and offers assistance with bonding, insurance, and lines of credit to eligible subcontractors. Bids and subcontractor pricing must be submitted by September 29, 2026, with all negotiations finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 7 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS