This Government Contract opportunity from Minnesota was posted on July 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Duct Bank and Electrical Pulling Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 18 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 18 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 18 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management and Training Corporation (MTC), acting as the operator for the Inland Empire Job Corps Center, is soliciting subcontractor bids for a fixed-price, single lump sum contract to correct fire alarm deficiencies at the facility in San Bernardino, California. The scope of work includes the installation of SD500-PS and Notifier BNG-1 manual pull stations, the installation of Cooper Wheelock HSW and Model 757-3A-T horn/strobe notification appliances, and the replacement of six existing fire alarm bells with Cooper Wheelock HSW units. All new devices must be integrated into the existing system and undergo complete functional testing. The project is estimated between 0 and 25,000 dollars, with a performance period of 90 consecutive business days following the notice to proceed. Bids are due by September 16, 2026, and will be evaluated based on overall best value. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB, under NAICS code 238210. The contract is subject to Construction Wage Rate Requirements, necessitating weekly certified payroll and adherence to California prevailing wage determinations. For bids of 25,000 dollars or more, a bid bond of 20 percent is required, along with performance and payment bonds from a surety company with at least an A- rating. Awardees must provide a Unique Entity ID (UEI) and complete the MTC Supplier Packet. Final acceptance is contingent upon a two-stage inspection process involving a substantial completion punch list and a final inspection approved by the center and government representatives.
Inland Empire Job Corps

POSTED

about 10 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The City of Saint Paul in Minnesota is seeking a subcontractor for a project titled Duct Bank and Electrical Pulling Installation. The scope of work involves the installation of duct spacers and the pulling of cables through pre-installed duct banks, with a specific focus on maintaining proper tension control and ensuring conductor protection. This opportunity is categorized under NAICS code 238210. Interested parties must submit their responses by the deadline of August 19, 2026. Further details and submission processes are managed through the City of Saint Paul's supplier portal.

General Info

Saint Paul seeks a subcontractor for duct bank and electrical pulling by August 2026.

Agency

Minnesota → City of Saint PaulView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of 1748.

The full solicitation package (16 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFB-PARKS-BAKER PARK RESTROOM &STORAGE FACILITY

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMinnesota → City of Saint Paul
ContactsNo contacts available
OfficeN/A
Organization / Agency
Minnesota → City of Saint Paul
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install duct spacers and pull cables through pre-installed duct banks with proper tension control and conductor protection.

More opportunities from Minnesota → City of Saint Paul

Same awarding agency

NAICS: 238990
New
SLED
RFQ-PARKS-HAZEL PARK SITE IMPROVEMENT PHASE 2
Solicitation # 1734
The City of Saint Paul Parks and Recreation Department is seeking quotes for the Hazel Park Site Improvement Phase 2 project, identified as solicitation 1734. The primary scope of work involves repairing paved and landscaped patio areas to ensure ADA compliance, with potential additional work including the replacement of site furnishings and the resurfacing of an existing basketball court. A non-mandatory pre-quote meeting is scheduled for September 22, 2026, at 10 AM CST at 945 Hazel St. N., Saint Paul, MN. All responses must be submitted electronically via the City of Saint Paul Supplier Portal by the closing deadline of October 5, 2026, at 2:00 PM CST. Contractors must adhere to strict compliance and certification requirements to be eligible for award. This includes submitting a Responsible Contractor Verification and Certification of Compliance form, meeting prevailing wage rates for Heavy and Highway construction in Minnesota, and complying with AA/EEO specifications, which include workforce participation goals of 32 percent minority and 20 percent female participation. Additionally, the project is subject to the Vendor Outreach Program, requiring the use of CERT certified small, minority, or women-owned businesses. Prime contractors must report all subcontractor and supplier payments through the B2Gnow system. Award will be granted to the most responsive bidder who meets all insurance, registration, and legal responsibility criteria.
All Other Specialty Trade Contractors

POSTED

1 day ago

DEADLINE

in 24 days
View Details
NAICS: 541330
SLED
RFP-OFS-60 SYCAMORE REMODELING PROJECT DESIGN&ENGINEER SER
Solicitation # 1756
The City of Saint Paul is soliciting proposals for design and engineering services for the 60 Sycamore Remodeling Project, located at 60 W. Sycamore Street, Saint Paul, Minnesota. The project involves the interior build-out of the eastern warehouse, including a new lobby, locker rooms, break rooms, restrooms, and laundry facilities on the first floor, as well as dedicated office and meeting spaces on the second floor. The scope also requires a full roof replacement and the integration of public art. The selected firm must provide all necessary structural, civil, and plumbing consultants and coordinate with LHB, Inc., who is handling mechanical and electrical engineering. The project must adhere to the Saint Paul Building Overlay, the Sustainable Building Ordinance, and the 2025 decarbonization report, specifically utilizing heat-pump rooftop air handling systems. Proposals must be submitted via the stpaulbids.com portal by October 2, 2026, at 3:00 PM CST. A mandatory pre-proposal meeting was scheduled for September 15, 2026. Submissions must be organized into four tabs: Lead Firm Information and Letter of Interest, Project Timeline and Process, Design Team and Experience, and a separate Fee Schedule file. The City will evaluate proposals based on a staff committee's scoring and may conduct interviews with key project personnel. The anticipated project initiation is late September or early October 2026, with a goal to go out for construction bid by February or March 2027. Contractors must comply with Affirmative Action and Equal Employment Opportunity specifications, including workforce participation goals of 32% minority and 20% female participation. Additionally, the Vendor Outreach Program requires prime contractors to solicit bids from at least three CERT certified businesses for each available opportunity. Payment reporting and tracking will be managed through the B2Gnow system, and final draw requests are contingent upon up-to-date reporting. Failure to meet AA/EEO or VOP requirements may result in sanctions, including contract termination or being deemed an ineligible bidder.
Engineering Services

POSTED

15 days ago

DEADLINE

in 21 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS