Southern California Edison plans to install approximately 500 linear feet of duct and pull cable within Caltrans right-of-way along State Route 1, the Pacific Coast Highway, at Post Mile 45.54 in Malibu, Los Angeles County. The project will involve open-cut excavation with a maximum depth of 60 inches, width of 36 inches, and length of 500 linear feet, alongside the installation of two vaults and associated equipment. No relocation of existing public utilities or acquisition of new right-of-way is required. Temporary traffic control measures will be implemented as part of the work to ensure safety and minimize disruption. The project is authorized under permit 725-6US-1680 and is being coordinated through Caltrans District 7, with Mojgan Abbassi, Senior Environmental Scientist Specialist, serving as the primary point of contact. The forecast was posted on July 31, 2025, and all activities will occur within the existing transportation corridor without expanding the footprint of the right-of-way.

General Info

Southern California Edison to install 500 ft of duct and cable with two vaults in Caltrans right-of-way along PCH.

Agency

California → Caltrans, District 7 - Los Angeles

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Malibu, CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 7 - Los Angeles
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 7 - Los Angeles
Office AddressN/A
Contacts
Mojgan AbbassiSenior Environmental Scientist Specialist

Full Description

Show more
Southern California Edison (SCE) proposes to install approximately 500 linear feet of duct/pull in cable within Caltrans right-of-way along State Route (SR-)1 – Pacific Coast Highway (PCH) at Post Mile (PM) 45.54, as well as to perform associated temporary traffic control activities in the City of Malibu, Los Angeles County. The work will also include the installation of two (2) vaults and related equipment. Installation will be done via open cut. Excavation will have a maximum depth of 60 inches, a maximum width of 36 inches, and a maximum length of 500 linear feet. No public utilities will be relocated, and no new right-of-way will be acquired for the project.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Hawaii. This firm-fixed-price contract, issued as an Invitation for Bid under NAICS code 237990, has an estimated value between 1 million and 5 million dollars. The scope of work includes mobilization and demobilization, the dredging and ocean disposal of 4,260 cubic yards of material, and revetted mole repairs involving stone rework, CRM wall repair, and vegetation removal. The period of performance is 200 calendar days from the date of the Notice to Proceed. The project requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. The contract includes a liquidated damages clause of 2,297 dollars per calendar day of delay. Award is based on a lowest responsive and responsible bidder selection process, with specific set-asides for various small business categories, including HUBZone, WOSB, and SDVOSB. Invoicing is conducted monthly, and the contractor must provide a detailed breakdown of pay items within 30 days of the Notice to Proceed.
Healy Tibbitts Builders, Inc.

POSTED

about 10 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is acting as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. With an estimated bid value of 19.3 million dollars, the project scope involves designing the removal of existing trailer-mounted Electrodialysis Reversal, slab-mounted Membrane Filtration, and Reverse Osmosis units. These will be replaced with new slab-mounted Membrane Filtration and Reverse Osmosis units to create a demineralization facility aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, seeks quotes for various trade services including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. The project emphasizes socioeconomic participation, specifically seeking SLBE and ELBE firms with DBE, MBE, WBE, or SBE certifications, and is open to various small business set-asides. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Contracting will be based on Garney Standard PO and Subcontract Forms, and any exceptions must be submitted as redlines with the quote. Proposals are due by August 27, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 10 hours ago

DEADLINE

in 13 days
View Details