This Government Contract opportunity from Massachusetts was posted on July 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Ductile Iron (DI) Pipe Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract entails the installation of approximately 1,000 feet of new 8-inch ductile iron water main, including all necessary procedures such as pipe joining, installation of thrust restraints, and proper backfilling to ensure structural integrity and long-term performance. The work is required to meet industry standards for water main construction and must be executed with attention to safety, durability, and compliance with local utility codes. The project is located at Oak Street in Westborough, Massachusetts, with a zip code of 01581, and is part of a public infrastructure initiative managed by the Department of Public Works under the agency designation DPW34. This is a subcontract opportunity with a North American Industry Classification System code of 237110, indicating it falls under water and sewer line and related structures construction. The solicitation was posted on July 1, 2026, and responses are due by July 22, 2026, at 7:00 PM. The contract is not set aside for any specific business category, and all qualified subcontractors may submit proposals. Work must be completed in accordance with the specifications provided by the Massachusetts Department of Public Works and should align with the expected timelines and performance benchmarks outlined in the bid documentation accessed via the provided UI link.
General Info
Place of Performance
Oak Street Westborough, MA, 01581, USASet-Aside
Documents
This scope was carved out of BD-25-1348-DPW34-131-130950.
The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.
IFB 27-2000 Rte 9 Water Main Rehabilitation
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
