Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Ohio was posted on September 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ductile Iron Pipe Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

This subcontract opportunity, issued by the Ohio Water Works Division of Engineering, involves the installation of ductile iron pipe featuring cement-mortar lining in accordance with ANSI/AWWA C104 standards. The scope of work is comprehensive, encompassing all necessary trenching, bedding, jointing, pressure testing, and backfilling required for a complete installation. The project is categorized under NAICS code 237110. Interested parties must submit their responses by the deadline of October 21, 2025. Further details and submission guidelines can be accessed through the provided vendor portal link.

General Info

Agency

Ohio → Water Works, Div Of Engineering

Place of Performance

OH, USA

Set-Aside

NONE

Documents

This scope was carved out of ITB-306-263C909193-1.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Fairmount Ave Lsl Branch Only Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio → Water Works, Div Of Engineering
ContactsNo contacts available
OfficeN/A
Organization / Agency
Ohio → Water Works, Div Of Engineering
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of ductile iron pipe with cement-mortar lining per ANSI/AWWA C104, including trenching, bedding, jointing, pressure testing, and backfilling.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS