Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
The U.S. Army Corps of Engineers is soliciting a firm fixed price purchase order for two internal API 653 tank inspections at facilities 4056 and 4057 at Dugway Proving Grounds, UT. The scope of work includes the removal of remaining fuel, cleaning of the tanks, and the provision of detailed reports to ensure regulatory compliance. The period of performance is 180 calendar days from the date of award. This acquisition is a total Small Business Set Aside under NAICS 541990.
The government will use the Lowest Price Technically Acceptable (LPTA) evaluation method. To be eligible for award, quoters must provide a certified API 653 inspector's certification and a one-page resume, as well as three experiential references from the past five years demonstrating capability in draining fuel. All work must adhere to API 653, UFC 3-460-01, and AW 78-24-27 standards. Because Dugway Proving Grounds is a closed base, all personnel must undergo identity proofing and vetting. Quotes must be submitted as a single PDF not exceeding five pages via the PIEE Solicitation Module by December 18, 2026.
General Info
US Army Corps seeks small business for two API 653 tank inspections.
PDF, High priority: read this first42 pages · specifications
HighAI Summary for API 653 In-Service Inspection Report - Facility 4057 (Dugway Proving Grounds): Dated 22 July 2020, this API 653 In-Service Inspection Report for the US Army Corps of Engineers Omaha District covers Facility 4057 at Dugway Proving Grounds, Utah. The document provides a comprehensive technical evaluation of tank construction, foundations, shell thickness, and piping systems, including mandatory and recommended repairs based on API 653, UFC 3-460-01, and AW 78-24-27 standards.
DOCX
DOCX, High priority: read this first58 pages · specifications
HighAI Summary for API 653 Out-of-Service Inspection Report Template: A technical inspection report template for API 653 Out-of-Service inspections, issued by the US Army Corps of Engineers, Omaha District.
DOCX
DOCX, High priority: read this first5 pages · sow
HighAI Summary for Attachment A - General Installation Security Requirements: Attachment A outlines general installation security requirements for contractor employees accessing military installations. It covers identity proofing, vetting, acceptable identification documents, disqualifying background criteria, pass issuance and revocation procedures, contest/waiver rights, and primary contractor responsibilities. The document also states access checks may occur each time a pass is issued and that no compensation is due for delays caused by compliance.
DOCX
DOCX, High priority: read this first1 page · specifications
HighAI Summary for CLIN Schedule - Dugway PG (W9128F27QA009): A CLIN schedule for the Dugway PG procurement (W9128F27QA009) detailing API Out-of-Service Tank Inspection Services for Facility 4056 and Facility 4057. The scope includes kick-off meetings, fuel removal, tank cleaning, containment testing, and reporting on a Firm Fixed Price (FFP) basis.
XLSX
XLSX, High priority: read this first3 pages · specifications
HighAI Summary for DUG Fuel Storage Tank List: A detailed list of fuel storage tanks at Dugway Proving Grounds, including tank capacities, dimensions, inspection types (API Internal), and specific requirements for UT and roundness surveys.
PDF
PDF, High priority: read this first10 pages · sow
HighAI Summary for Dugway Proving Grounds Fuel Tank Inspection PWS: Performance Work Statement (PWS) for a nonpersonal services contract to perform inspections on Department of Defense fuel tanks at Dugway Proving Grounds, UT. The scope includes fuel removal, disposal, tank cleaning, and aboveground storage tank (AST) internal inspections. The contract is a Firm Fixed Price Purchase Order requiring a certified API 653 Inspector and Project Manager.
DOCX
DOCX, High priority: read this first4 pages · sow
HighAI Summary for Inspection Teleconference Briefing Template - API 653 Tank Findings: Template for a teleconference briefing summarizing inspection findings for a storage tank under Contract No. [XXXXX], Task Order [XX]. Dated [DATE], it outlines API 653 out-of-service inspection results, categorizes findings as mandatory, short term, and long term, and lists recommended future inspection dates. The document includes sections for state regulations, inspector certification, and findings/recommendations with mandatory repair guidance and placeholders for observations, references, and recommendations.
PDF
PDF, High priority: read this first3 pages · rfq
HighAI Summary for Instructions to Quoters - Dugway PG (W9128F27QA009): Instructions to Offerors for a commercial procurement (W9128F27QA009) regarding fuel tank services. It specifies the Lowest Price Technically Acceptable (LPTA) evaluation method, submission requirements via PIEE, and technical criteria including inspector certifications and past performance references for fuel draining, cleaning, and API inspections.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFQ W9128F27QA009 - Dugway PG Tank Inspections: Combined synopsis and solicitation (RFQ) for two internal API 653 tank inspections at Dugway Proving Grounds. The acquisition is 100% set-aside for small businesses under NAICS 541990. Quotes are due by December 18, 2026, via the PIEE Solicitation Module.
PDF
PDF, High priority: read this first54 pages · specifications
HighAI Summary for Tank 4056 API-653 In-Service Inspection Report: An API-653 In-Service Inspection report for Tank 4056 at Dugway Proving Ground, completed May 8, 2025. The document details the condition of a 25,000-gallon Jet A storage tank, including a general summary, technical findings regarding concrete containment, coating failures, and mandatory/recommended repairs based on UFC 3-460-01 and AW 78-24-27 standards.
PDF
PDF, High priority: read this first55 pages · specifications
HighAI Summary for Tank 4057 API-653 In-Service Inspection Report: An API-653 In-Service Inspection report completed by InterSpec, LLC on May 8, 2025, for Tank 4057 at Dugway Proving Ground, UT. The document details the condition of a 25,000-gallon Jet A storage tank, including a general summary, technical findings, and a list of short-term repairs required for the concrete ringwall, containment floor, and piping systems.
PDF
PDF, High priority: read this first7 pages · wage-determination
HighAI Summary for Wage Determination No. 2015-5489 (Revision 31): U.S. Department of Labor Wage Determination No. 2015-5489, Revision 31, dated August 27, 2026. This document establishes required wage rates for various administrative and clerical occupations in Salt Lake and Tooele Counties, Utah, under the Service Contract Act.
PDF
PDF, Low priority42 pages · specifications
LowAI Summary for API 653 In-Service Inspection Report - Dugway Proving Grounds Facility 4056: An API 653 In-Service Inspection Report dated 21 July 2020 for Facility Number 4056 at Dugway Proving Grounds, Utah, prepared by the US Army Corps of Engineers Omaha District and the Center of Expertise for Petroleum, Oils and Lubricants (USACE POL-MCX). The document includes tank inspection comments, findings, mandatory and recommended repairs, and engineering calculations for shell and roof thickness.
XLSX
XLSX, Low priority6 pages · status-report
LowAI Summary for Monthly Contractors Progress Management and Status Report: Monthly contractors progress management and status report spreadsheet template. Includes an executive summary section for the reporting period, program manager, overall task order status, key accomplishments, concerns, and month-ahead outlook. Also includes a status/schedule table with inspection, coordination, report, and completion milestones, plus a lessons learned section for future project and program improvement.
XLSX
XLSX, Low priority19 pages · other
LowAI Summary for P-006858-08 Project Concept Document and Charter: Project Concept Document and Project Charter for DLA-E project P-006858-08, dated 12-Nov-10, for Construct Product Containment Areas / Replace Secondary Containment Areas at Fort Indiantown Gap, PA. The document describes the need to upgrade fueling facilities to prevent fuel releases, environmental contamination, fire hazards, and injury to personnel. It outlines project objectives, proposed repairs and upgrades, estimated project costs, timeline, impacted business areas, and notes the intent to develop a 35% design and distribute an RFP to Fuels MATOCs.
DOCX
DOCX, Low priority1 page · other
LowAI Summary for Return to Service Letter - Storage Tank Inspection: Return to Service Letter for a storage tank fuel system inspection under Contract No. [XXXXX], Task Order [XX]. The document states that the tank was inspected in accordance with API STD 653 requirements, found suitable for return to service, and returned to service on the listed date. It also includes recommended future inspection dates, applicable state regulation references, and spaces for inspector and installation acknowledgements.
PDF
PDF, Low priority34 pages · specifications
LowAI Summary for Tank 4056 Inspection Report - Dugway Proving Grounds: A September 2007 technical inspection report prepared by Pond & Company for the US Army Corps of Engineers (Omaha District) under Task Order 001. The document details the API-653 out-of-service inspection of Tank 4056 at Dugway Proving Grounds, including findings on the tank bottom, shell, and roof, and provides recommendations for repairs and maintenance.
PDF
PDF, Low priority31 pages · other
LowAI Summary for Tank 4057 Inspection Report - Dugway Proving Grounds: A September 2007 inspection report prepared by Pond & Company for the U.S. Army Corps of Engineers (Omaha District) under Task Order 001. The document details the API-653 out-of-service inspection of Tank 4057 at Dugway Proving Grounds, including findings on the tank bottom, shell, and roof, and provides recommendations for repairs and maintenance.
onduct two API 653 internal inspections on facilities 4056 and 4057 at Dugway Proving Grounds, UT, in accordance with all laws, standards, federal regulations, as well as any state and local regulations and guidelines. Tank inspection services include, but are not limited to, removal of remaining fuel, cleaning of the tanks, and provision of required reports to ensure regulatory compliance. See attachments for additional details.
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.